Loading...
HomeMy WebLinkAbout04 Grading & Drainage PlanSEE SHEET 15 FOR DETAILS ON STRUCTURE 111 15' D.E. 20' D.E. 6 857.0 FPG -846.7 LINE `A 1852. 4850. EXISTING LAKE N.P. 840D 4' SIDEWALK CUL-DE -SAC GRADING DETAIL SCALE 1" 30' 15' D.E. 85/ 857.0 FPG -846.7 0 A CONCRETE ROLL CURB AND GUTTER SEE DETAIL C1 ON SHEET 17 CONCRETE ROLL CURB AND GUTTER VV/REVERSED SLOPE GUTTER SEE DETAIL C2 ON SHEET 15 4' SIDEWALK 3 :1 MATCHING S SANITARY SEWER W WATER LINE X FENCE LINE 0 MANHOLE I. STORM INLET FIRE HYDRANT H WATER VALVE EXISTING CONTOUR PROPOSED T FPG MFF 5' CONCRETE WALK LEGEND EXISTING STORM SEWER STORM SEWER SANITARY SEWER WATER LINE SUB SURFACE DRAIN SUB SURFACE DRAIN STUB 0 SANITARY MH 0 STORM MH STORM INLET V FIRE HYDRANT Q WATER VALVE i r j r i WATER ME i ER 15 SANITARY STRUCTURE NO. is STORM STRUCTURE NO. _am.. PROPOSED CONTOUR 815.9 PROPOSED PAD GRADE EMERGENCY FLOOD ROUTING FLOOD PROTECTOIN GRADE MINIMUM FINISHED FLOOR 851.5 6" SSD 30' D.E. 10' ASPHALT PATH 2' NON- ACCESS EASEMENT N SEE LANDSCAPE PLANS FOR EXACT SIZE AND DETAIL OF LANDSCAPE MOUND CIS STR. N0. TC /RIM INV. IN. INV. OUT DEPTH STR. TYPE STR. SIZE CASTING TYPE PIPE SIZE DIRECTION OF ELEV. (NEENAH) PIPE IN /OUT 107 850.60 846.60 2.43 DBL CURB INLET BOX 24x56 R -3501 TL,TR 15" RCP 106 850.60 846.45 846.45 2.28 DBL CURB INLET BOX 24x56 R -3501 TL,TR 18" RCP T 105 850.50 846.26 846.26 2.32 MANHOLE MANHOLE 48" DIA R -4342 18" RCP 104 852.40 845.36 845.36 5.12 MANHOLE MANHOLE 48" DIA R -1772 18" RCP 103 851.50 845.03 845.03 4.55 DBL CURB INLET BOX 24x56 R -3501 TL,TR 18" RCP 102 851.50 844.86 844.86 4.72 DBL CURB INLET BOX 24x56 R -3501 TL,TR 18" RCP 101 842.50 END SECTION 18" RCP o 109 851.50 852.00 END SECTION 12" RCP a 108 852.00 851.50 END SECTION a EAST I I N-!1 /A 111 845.10 842.50 DROP STRUCTURE BOX 24x36 15" RCP 110 840.00 ,END SECTION «,T"� N/A' GENERAL NOTES 1. Standard Specifications a. Hamilton County specs. shall apply for Storm Sewer b. Indianapolis Water Company specs. shall apply for Watermains c. Clay Township Regional Waste District specs. shall apply for Sanitary Sewers. 2. It shall be the responsibility of each contractor to verify existing utility locations and conditions. It shall also be the contractor's responsibility to contact the various utilities for proper staking locations for each prior to construction. 3. Any errors or omissions shall be brought to the attention of the engineer prior to construction, In the event of the contractors's failing to give such notice, he shall be held responsible for the results of any such errors or omissions and the cost of rectifying the same. 4. Any parts of the sanitary or storm sewer trench which lies under paved areas shall be back filled with granular material as shown in the details. 5. All grades at the boundary line shall meet existing grade. 6. All construction activity on this site shall be performed in compliance with OSHA standards. 7. Rip -Rap required on all end section outfall pipes. See Erosion Control Plan for exact size and location. 8. All streets are required to have 6" underdrains per the governing agencies Standards 9. Contractor to stockpile topsoil at a location approved by the developer engineer prior to construction if required. 10. In any area of construction where field tiles cross the proposed house pad, the tile shall be removed and back filled. All field tiles intercepted shall be perpetuated into the storm sewer system or lakes. The contractor shall notify the engineer in any circumstance that this cannot be accomplished. 11. All fill areas shall be compacted to meet the density of the specification sheet or detail. 12. 4" Sub surface drain to be provided to each lot 13. Flood protection grade is at least 2' above 100-yr pond elevation x x COMNION AREA STORM STRUCTURE CHART 116TH ST ROAD WIDENING Sanitary Sewer Narrative: Sanitary sewer service will be provided by Clay Township Regional Waste District to each lot via a sanitary lateral. These laterals discharge into an 8" sanitary line, which eventually leads off site. The off site sanitary will follow an easement along 116th Street. The 8" sanitary line will cross under Spring Mill Rd. and tap into an existing manhole at the southeast corner of Spring Mill Rd. and 116th Street. From here the sanitary sewer discharges into an existing 12" main. Water Narrative: Veolia Water will provide water service. An existing 12" water main that ends at the west property line will be extended along 116th Street to the east property line. An 8" main will tee off the 12" main and service the subdivision. Storm Sewer Narrative: Four curb inlets, and one catch basin will receive the stormwater form the site. The stromwater will run through a series of concrete pipes and discharge into a retention pond at the south end of the property. Here the stormwater will be detained to meet discharge requirements. The stormwater will discharge through a drop structure and into an adjacent landowners pond. From this pond the stormwater flows through an unnamed tributary eventually discharging into Williams Creek. STREET NAME CHART STREET NAME CHATEAUX DRIVE "DON'T DIG BLIND" 1- 800 382 -5544 CALL BEFORE YOU DIG ■03146gr dgn 5/27/2004 3: 09: 59 PM Sheet No: a) U a) 0 of d C U Z w az Z cc O o M ow e zO a O z'1: C cI 0 o c Project No: 0314