HomeMy WebLinkAboutC-1 Site Plan APPROVEDBID P
As
B
Rep
Due to
Seal, Re-
Parking Pa
On Landscap
OSE
alt if Requir
w Construction;
tripe to New
rn Shown
Plan L -1.
king
ew R/W
i
T ♦♦♦♦♦♦��1 ♦♦♦1
2 1 5 4 i 4 6 46�.►��,, ����r��� �,4•i►��,►.►
1 *****.li I 111 1111/1 T4117. 41 Eill I 1 Ili I**, re**74167•741r4 11, 511417,71 1 •740■111,41***
I vist lwr 1.,i4 l
ss s�♦♦ ssssss♦ �i��
r 'v�' A! evi r �1- f l i ►r!►1� i
r 40/ Vt47-4- f i J1' r �i 4 �t �•�S�
V�►r' rll► �r�
Ar M�
�♦♦♦s♦♦♦♦
VA M. r r �r s♦ ♦♦♦s�► ♦r�►♦♦♦♦♦♦♦♦♦♦♦
♦ssss ►s♦s♦ss♦♦ss�:s ♦♦♦♦♦♦♦♦♦♦♦4►
5 rods (plat) 82.68' (meas.)
'c 15T STREET SW
Water Main
5 rods (plat) 83.13' (meas.)
New Tel./ Cable
Demark
New Electric
Base /Disconnect
New Planter
New Dumpster
Screen
Fut. Tree Bed
by City
Fut. Side Walk
by City
Existing
Bldg
B -1
Existing
Set Back
Ex. Walk
Ex. Walk
T.P.
T.P. N�
0
0)
0
U
a)
cc
as
a)
z
W
U
U
a)
W
•0
a)
L
O
0)
New Cable Route
NORTH
0 T.P.
Existing Alley
Vacant Lot
B -2
Ex. Stone Surface
No Work This Area
New
Downspout
and Storm
_New 111 1 111
Relocate
Mie!-d New Conc. WP Outlet
as> Sidewalk
18' Storm
8' Sanitary
PROPOSED SITE PLAN
SCALE: 1/8" =1'--0"
-o
Ex.
Ex. Gas Main
Ex. Guardrail
Slo
N1/4
114'1tt
I.P.
New Planter
Bed
w
New Conc.
Sidewalk
PROPOSED SITE DATA
Zoning:
Primary Use:
Lot Area:
Lot Width:
Setbacks:
Height:
Floor Area:
Parking:
Proposed
U.E.
Proposed
Building Face
°Parking Lot
Fut. R/W
Proposed
O
B -2
V 0
eP
B -2
Professional Office 'Optician" B -1
5,464 sf 0.125 acre
83.13'
Main Street Sub Area: None Required
25' -8" Top of Front Cornice
2,410 sf (gross) 1st Floor (renovated)
2,410 sf (gross) 2nd Story (new)
8; with only 2 required
0
I
i0
0
U-
NO SCALE
GENERAL NOTES
SEE PLAN
4" CONCRETE OVER 4" COMPACTED
GRAVEL BASE WITH FIBER ADDITIVE.
BROOM FINISH. PROVIDE 1/2" OR
3/4" EXPANSION JOINT CO 30' O.C.
AND TOOLED JOINTS (4) 4' TO
5' O.C.
-X<
w •,:x�► ��f ?'..y N�}�. �'L �+�r� 1 �1 toiy;��� s li�.� emu a• v G�� /A// A/// v/ /v/
NEW SIDEWALK DET.
Cl
1. ALL BALLED, BURLAPPED, AND CONTAINER TREES SHRUBS SHALL
BE CAREFULLY HANDLED TO PREVENT DAMAGING AND LOOSENING
THE BALLS. PLANTS SHALL BE HANDLED AND PLANTED WITHOUT
USING THE TOPS FOR LIFTING, CARRYING, OR SETTING TREES.
2. PLANTING SOIL FOR BACKFILL OF TREES AND SHRUBS SHALL CONSIST
OF (3) PARTS CLEAN AND NEW TOPSOIL; AND (1) PART NEW PEAT.
3. ALL PLANTS SHALL BE "WATERED IN" BY FLOODING THE BACKFILL HOLE
WITHIN THE WORK DAY UPON WHICH THEY WERE PLANTED.
4. LOOSEN TIES ON BALLED AND BURLAPPED MATERIAL. LEAVE
BURLAP ON BALL.
5. TREES AND SHRUBS SHALL BE PLANTED AT THE SAME DEPTH AS
THEY WERE GROWING IN THE NURSERY.
GRADE
I rilinalll
1 D3 A Tech el(raft
Architecture d lnteri• Consultants
Ind =polb, I• •Ian
(317) 2514976 251-7254 Fx
Q too] 10.1A Tic.* ttr•fl
Architecture Interiors
ARGO CONSULTING ENC,1NEERS, INC.
618 N. DAVIDSON STREET
4 INDIANAPOLIS, IN. 46202
t PHONE: (317) 639 -9244
:emu; FAX: (317) 639 -9249
EMAIL: orgo@inetdirect.net
f'I :GCrri:_i:: :?Goy `u^ C.nsUi:i.j Enrint_rs. 1•:
Structural
THESE DRAWINGS DESCRIBE THE GENERAL
SCOPE OF WORK FOR NE PROJECT IN TERMS OF
DESIGN INTENT, INCLUDING PROPORTIONS,
DIMENSIONS, ARCHITECTURAL INTERIOR
COMPONENTS. CML, STRUCTURAL, MECHANICAL AND
ELECTRICAL SYSTEMS. THE DRAWINGS DO NOT
HOWEVER. NECESSARILY INDICATE OR
OR DESCRIBE ALL WORK REQUIRED FOR
THE FULL COMPLETION OF THE CONTRACT.
BASED ON THIS GENERAL PROJECT SCOPE
INDICATED ALONG WITH THE SPECIFICATIONS.
THE GENERAL CONTRACTOR SHALL FURNISH
ALL LABOR AND MATERIALS REQUIRED TO
COMPLETELY EXECUTE THE SCOPE OF WORK.
C,)
Z z
Q Q
W U
Drs.
)PTON
Nb
it a
CC Z
w
E I
w
1--
0 0
1-
0z
a)
W
t--
I-
W
U))
o
<Co
ox
w
co 0
0 E-
a_
0
cr
a
W
J
F-
C
W
a
DATE
6/03/04
DRAWN BY
JSS
CHECKED BY
JSS
REVISIONS
CERTIFICATION
DOCUMENT PHASE
Design Release
c 1
SHEET NUMBER
BID P
As
B
Rep
Due to
Seal, Re-
Parking Pa
On Landscap
OSE
alt if Requir
w Construction;
tripe to New
rn Shown
Plan L -1.
king
ew R/W
i
T ♦♦♦♦♦♦��1 ♦♦♦1
2 1 5 4 i 4 6 46�.►��,, ����r��� �,4•i►��,►.►
1 *****.li I 111 1111/1 T4117. 41 Eill I 1 Ili I**, re**74167•741r4 11, 511417,71 1 •740■111,41***
I vist lwr 1.,i4 l
ss s�♦♦ ssssss♦ �i��
r 'v�' A! evi r �1- f l i ►r!►1� i
r 40/ Vt47-4- f i J1' r �i 4 �t �•�S�
V�►r' rll► �r�
Ar M�
�♦♦♦s♦♦♦♦
VA M. r r �r s♦ ♦♦♦s�► ♦r�►♦♦♦♦♦♦♦♦♦♦♦
♦ssss ►s♦s♦ss♦♦ss�:s ♦♦♦♦♦♦♦♦♦♦♦4►
5 rods (plat) 82.68' (meas.)
'c 15T STREET SW
Water Main
5 rods (plat) 83.13' (meas.)
New Tel./ Cable
Demark
New Electric
Base /Disconnect
New Planter
New Dumpster
Screen
Fut. Tree Bed
by City
Fut. Side Walk
by City
Existing
Bldg
B -1
Existing
Set Back
Ex. Walk
Ex. Walk
T.P.
T.P. N�
0
0)
0
U
a)
cc
as
a)
z
W
U
U
a)
W
•0
a)
L
O
0)
New Cable Route
NORTH
0 T.P.
Existing Alley
Vacant Lot
B -2
Ex. Stone Surface
No Work This Area
New
Downspout
and Storm
_New 111 1 111
Relocate
Mie!-d New Conc. WP Outlet
as> Sidewalk
18' Storm
8' Sanitary
PROPOSED SITE PLAN
SCALE: 1/8" =1'--0"
-o
Ex.
Ex. Gas Main
Ex. Guardrail
Slo
N1/4
114'1tt
I.P.
New Planter
Bed
w
New Conc.
Sidewalk
PROPOSED SITE DATA
Zoning:
Primary Use:
Lot Area:
Lot Width:
Setbacks:
Height:
Floor Area:
Parking:
Proposed
U.E.
Proposed
Building Face
°Parking Lot
Fut. R/W
Proposed
O
B -2
V 0
eP
B -2
Professional Office 'Optician" B -1
5,464 sf 0.125 acre
83.13'
Main Street Sub Area: None Required
25' -8" Top of Front Cornice
2,410 sf (gross) 1st Floor (renovated)
2,410 sf (gross) 2nd Story (new)
8; with only 2 required
0
I
i0
0
U-
NO SCALE
GENERAL NOTES
SEE PLAN
4" CONCRETE OVER 4" COMPACTED
GRAVEL BASE WITH FIBER ADDITIVE.
BROOM FINISH. PROVIDE 1/2" OR
3/4" EXPANSION JOINT CO 30' O.C.
AND TOOLED JOINTS (4) 4' TO
5' O.C.
-X<
w •,:x�► ��f ?'..y N�}�. �'L �+�r� 1 �1 toiy;��� s li�.� emu a• v G�� /A// A/// v/ /v/
NEW SIDEWALK DET.
Cl
1. ALL BALLED, BURLAPPED, AND CONTAINER TREES SHRUBS SHALL
BE CAREFULLY HANDLED TO PREVENT DAMAGING AND LOOSENING
THE BALLS. PLANTS SHALL BE HANDLED AND PLANTED WITHOUT
USING THE TOPS FOR LIFTING, CARRYING, OR SETTING TREES.
2. PLANTING SOIL FOR BACKFILL OF TREES AND SHRUBS SHALL CONSIST
OF (3) PARTS CLEAN AND NEW TOPSOIL; AND (1) PART NEW PEAT.
3. ALL PLANTS SHALL BE "WATERED IN" BY FLOODING THE BACKFILL HOLE
WITHIN THE WORK DAY UPON WHICH THEY WERE PLANTED.
4. LOOSEN TIES ON BALLED AND BURLAPPED MATERIAL. LEAVE
BURLAP ON BALL.
5. TREES AND SHRUBS SHALL BE PLANTED AT THE SAME DEPTH AS
THEY WERE GROWING IN THE NURSERY.
GRADE