Loading...
HomeMy WebLinkAboutC-2 Existing Site ConditionsEx. Condenser Ex. B. Meters Existing Bldg Ex. HC Ramp Existing Set Back Ex. Walk Ex. Walk Tlephone 'OUL' to pole Cable 'OUL" to pole NORTH Vacant Lot B-2 Ex. Stone Surface s 89°13'49" W 5 rods (plat) 82.68' (meas.) Existing Covered Porch Tempo Existing Walk :xisting Parkin ary Pending ew R/W Asphalt s 8917'22' W s (plat) 83.13' (me s.) 1ST STREET SW EXISTING SITE PLAN L2 SCALE: 1 /8" =1' -0" Ex. Downspout and Storm Ex. Plant Bed Water Main 18' Storm 8' Sanitary z1 EXISTING SOUTH FACADE Ex. Guardrail Ex. Condenser Gas Main Verify i MIN Ir■IuUI 1 1 1 I tip MA= 6 .1 ��■I�I�Mlin�ilN� 11 �_lati ■I___ Cuul.� _1l i -1111111111111 01111111 1 I l Imo■ Parking Lot B-2 Ex. Themed Light Pole Safety: General Contractor Responsible For Determining Load Bearing Conditions and Installing Permanent and Temporary Bracing Selective Demolition Remove Existing Structure And Components As Required For New Construction Zoning: Primary Use: Lot Area: Lot Width: Setbacks: Height: Floor Area: Parking: EXISTING SITE DATA B -2 Professional Office 'Optician' B -1 5,464 sf 0.125 acre 83.13' Main Street Sub Area: None Required 15' -O" Existing 2,351 sf (gross) one story (existing) 8; with only 2 required 4 LJi I D 3 A Tech e'Kraft Architecture a d Inter) Consultants huh pots. 1. (317) 251-4976 2517254 Fx 3003 OM T.cl "..n Architecture Interiors ARGO CONSUL11NG ENGINEERS, INC. 618 N. DAVIDSON STREET E INDIANAPOLIS, IN. 46202 PHONE: (317) 639 -9244 FAX: (317) 639 -9249 EMAIL: orgo @inetdirect.net ,:i 2003 .`i;o C.imu En�it.ev b:i. Structural THESE DRAWINGS DESCRIBE THE GENERAL SCOPE OF WORK FOR THE PROJECT IN TERMS OF DESIGN INTENT, INCLUDING PROPORTIONS, DIMENSIONS. ARCHITECTURAL INTERIOR COMPONENTS. CML, STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS. THE DRAWINGS DO NOT HOWEVER, NECESSARILY INDICATE OR OR DESCRIBE ALL WORK REQUIRED FOR THE FULL COMPLETION OF THE CONTRACT. BASED ON THIS GENERAL PROJECT SCOPE INDICATED ALONG WITH THE SPECIFICATIONS. THE GENERAL CONTRACTOR SHALL FURNISH ALL LABOR AND MATERIALS REOUIRED TO COMPLETELY EXECUTE THE SCOPE OF WORK. Z z Q Q Q 0) cc w� O F-1.1 W 0 0 w J 1 W 1- 0 W a v� DATE DRAWN BY CHECKED BY 6/03/04 JSS JSS REVISIONS CERTIFICATION DOCUMENT PHASE Design Release SHEET NUMBER