Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
11 C206 Erosion Control Details
SIASO\A SO PHOI 0 ON CHA C STABILIZATION PRACTICE JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. PERMANENT SEEDING H A 7/23/04 PER CITY OF CARMEL, HAMILTON //I /yla! !!a!aAv.' COUNTY SURVEYOR, AND SCS /174► /a /a% COMMENTS 2 6/30/04 i!a %i!!aa /a! i /laaaa! /!aa! ia!! /!!!!!a /f�/ DATE a! /!!a!!! /ia DORMANT SEEDING B CLIENT PLATINUM LLC 9551 DELEGATES ROW INDIANA 46250 PHONE: 317 818 -2900 FAX: 317- 818 -2910 PROPERTIES, INDIANAPOLIS, CONF1DEN11ALITY STATEMENT.• understands that owned by 1E1, and also, and confidential Accordingly, the recipient in strict confidence these materials to any not to make copies of agrees to use the purpose for which LEI and recipient agrees either upon completion of the request of LEI, The recipient of these materials copyright in the materials is that the materials contain priviledged business information of LEI. agrees to retain these materials and agrees not to disclose other party and further agrees the materials. The recipient materials only for the limited has made the materials available, to return all materials to LEI the intended purpose or upon whichever comes first. SITE ADDRESS: SUBDIVISION WEST ROAD INDIANA BELLEOOD 131st STREET CARMEL, SCALE N.T.S. DATE' 05/04/04 T B CHECKED BY DGP FILE NAME. 0327C206.dwg DRAMNG 11TLE TEMPORARY SEEDING EROSION C C206 i /malia a iallii! aaiaia!!i liai iai i/ aiiiiiiiiiiiaaiailaiiiaiaiiiiiia aaiaiaaiiiaii i SODDING /I/ MULCHING G A KENTUCKY BLUEGRASS 100 LBS /ACRE; CREEPING RED FESCUE 100 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 -600 LBS. /ACRE OF 12-12-12 ANALYSIS, OR EQUIVALENT, FERTILIZER. E3 KENTUCKY BLUEGRASS 120 LBS /ACRE; CREEPING RED FESCUE 120 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 -600 LBS. /ACRE OF 12 -12 -12 ANALYSIS, OR EQUIVALENT, FERTILIZER. C SPRING OATS 3 BUSHELS /ACRE FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 -600 LBS. /ACRE OF 12- 12 -12. ANALYSIS, OR EQUIVALENT, FERTILIZER. D WHEAT OR RYE 2 BUSHELS /ACRE FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 -600 LBS. /ACRE OF 12- 12 -12. ANALYSIS, OR EQUIVALENT, FERTILIZER. E ANNUAL RYEGRASS 40 LBS /ACRE (1 LB /1000 SQ. FT.) FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 -600 LBS. /ACRE OF 12 -12 -12 ANALYSIS, OR EQUIVALENT, FERTILIZER. F SOD G STRAW MULCH 2 TONS /ACRE /I/ HRRIGATION NEEDED DURING JUNE, JULY, AUGUST AND /OR SEPTEMBER IRRIGATION NEEDED FOR 2 WEEKS AFTER SUPPLYING SOD B C L. D A f.. H B 7/23/04 PER CITY OF CARMEL, HAMILTON SITE ENGINEER: 3. 7/23/04 PER CITY OF CARMEL, HAMILTON COUNTY SURVEYOR, AND SCS COMMENTS 2 6/30/04 PER CTE /CLAY WASTE COMMENTS 1. 6/30/04 PER SCS COMMENTS NO. DATE REVISION DESCRIPTION w li illitil .os z 1 1 900.119 i :T fE i (mss ''•.NDIAO. 11JIIIllt0 C 0.,Da i yac8L io p' h'i H. CLIENT PLATINUM LLC 9551 DELEGATES ROW INDIANA 46250 PHONE: 317 818 -2900 FAX: 317- 818 -2910 PROPERTIES, INDIANAPOLIS, CONF1DEN11ALITY STATEMENT.• understands that owned by 1E1, and also, and confidential Accordingly, the recipient in strict confidence these materials to any not to make copies of agrees to use the purpose for which LEI and recipient agrees either upon completion of the request of LEI, The recipient of these materials copyright in the materials is that the materials contain priviledged business information of LEI. agrees to retain these materials and agrees not to disclose other party and further agrees the materials. The recipient materials only for the limited has made the materials available, to return all materials to LEI the intended purpose or upon whichever comes first. SITE ADDRESS: SUBDIVISION WEST ROAD INDIANA BELLEOOD 131st STREET CARMEL, SCALE N.T.S. DATE' 05/04/04 DESIGNED BY DGP DRAWN By HwR CHECKED BY DGP FIEL D BOOK f N/A FILE NAME. 0327C206.dwg DRAMNG 11TLE CONTROL DETAILS EROSION SHEET NO: C206 FILE E OW -=a R EVS_ F.A N 1 RIPP AI VE F..IFNT PRA.R PL AN VIEW 6' -0" MINIMUM OD r�Ir�F 1 1 41I 11CL_E MAINTFMACE AREA ORIGINAL- GROUND 0" MINIMUM CROSS- SECTION D50 -50% OF RIP -RAP EQUALS THE SIZE FILTE E ABRIC FLOW E-INE OF SWALE f Lii 6! .300 2.75 250 225 200 1 75 r. 12, 5 100 6 C1_ 50 .r) 2 5 O 150 9" MIN. 13 l I C?'v'd FOIJ OF Ej ?NIT. 0.7 STAPLES PER D. YD. 4: 1 FLOW NO OVERT Al I 18" MIN. 21" r _FLOW LINE `f WALE COMPACLED SOIL VETMENT RIPRAP CHECK DAM r) GENERA;- STAPLE RECOMMENDATIONS SLOPE. GRA)ILNI T7- 1 DISCHARGE RIPRAP INSTALLATION 1:1 1.15 STAPLES PER SQ. YD. LOW ME D/1 LIGI.l FLOW 'LOW CHANNEL CL-'-ANNEI. AND AND `_SHORELINE SHL)kE'I_101: 1. 7 STAPLES PER SQ. YD. EROSION CONTROL BLANKET STAPLE PATTERN 3.4 STAPLES PER SQ. YD. 4 6 (10cm-15cm) 3.75 STAPLES PER SQ. YD. NOTES: 1. STAPLE PATTERNS APPLY TO All NORTH AMERICAN GREEN EROSION BLANKETS. 2. STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL. 3. AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE DRAINAGE OVER LARGE AREAS IS DIRE(;' ONTO 1311 ANK F 1�: STAPLE PATTERN "C" SHOULD BE UTILIZED. 4. CHANNEL LININGS REQUIRE A 2' (MIN.) OVERI_..AP AT LONGITUDINAL JOINTS AND SIDE SLOPES REQUIRE A 6" (MIN.) OVERLAP. WHERE OVERLAPS OCCUR, THE UPSTREAM BLANKET SHALL OVERLAP THE DOWNSTREAM. 5. IF OTHER THAN NORTH AMERICAN GREEN EROSION CONTROL BLANKETS ARE INSTALLED FOLLOW THE INSTALLATION DIRECTIONS RECOMMENDED [35 THAT MANUFACTURER. 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECE:`_.LSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOI L- WHEN USING CELL 0 -SEED DO NOl SEED PREPARED AREA. GEL -O- -SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP- -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES /STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. RAE <EII_.I AND COMPACT THE TRENCH AE TER E_R STAPLING. APPLY SEED 10 COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION or HI ANKET BA CH OVEH SELL) I AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF CI1l 11'I I TI-I S S BLA NKETS ALl I ROXIMA)L BY �I� (30cm) APART ACROSS THE WIDTH OF THE BLANKET. 3 (A.) E I I (B.) RIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKL ES MUST E3E SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES /STAKES IN APPROPRIA E LOCATIONS AS SHOWN IN TFIE STAPLE PATTERN CHIDE. WHEN USING OPTIONAL_ DOT SYSTEM T STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OE THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THI E [)cE::-S OF PARALLEL BLANKETS M1.-1ST BE STAPLED WITH APPROXIMATELY 2 -5" (5cm-12.5cm) OVERLAP DEPENDING ON BLANKET TYPE. TO ENSURE PROPER HAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING 'NOT AI I I 0 ON LOP) EVEN WITH THE COL ORLD SEAM STITCH' ON THE PREVIOUSLY INSTALLED BLANKET. 5. CEMS1 (11HFIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7 5c:m) OVERLAP. `MAPLE 11115)1 ;H OVERLAPPED AREA APPROXIMATELY 12" (30cm) APART ACROSS ENTIRE BLANKET WIDTH. NOTE *IN I HOSE SOLI CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARY TO PROPI RI Y Sr C:-LJRI THE BI ANKETS. EROSION CONTROL BLANKET INSTALLATION ON A SLOPE 1 PREPAf L )II BET OIPI_. ILL`. >LALLING BLA.NKE TS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN 1.;IN I. :ELI C) St LL) DO NOT SEED PREPARE_-[_) 5)-LEA. CELL -O SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN A! HT IF TOT' GI TL IE CHANNEL BY ANCHORING THL HIANKET IN A 6" (1 5cm) DEEP X 6" (15cm) WIDE TRENCH WITH ^I 1 11' MA F Li 12" (30cm) OF BIANTOIT EXT L NI)ET HE POND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANK' E I I A ROW (DE STAPLE- /STAKE H APPROXMMATI I-Y i 2" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND C )MI 'AC T THF TEE NCH AFTER STAPLING, APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF E:31 r`,Nk1 1 BACK O's/r. H SEED AND COMPACTED SOIL_. 'SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES /STAKES SPACE IL Al PNOXIMALI 1 2" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL_ EE NT ER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAIN`:I I HT. OIL SURF F_. ALL BLANKETS MUST BE `:,ECL_'R[ LY FASTENED TO SOIL SURFACE: BY PLACING STAPLES /STAKES IN Al I E< FIT ATEl L 01;A TIONS AS SHOWN IN THE STAPLE PATI ERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM"', STAPLES /STAKES SHOUT r:i IS PLACED THROUGH EACH OF THE_. COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE :ori -COTIVL ISANKETS END OVER END (SHINGLE STYLE_) WITH A 4 -6" (10cm- -15cm) OVERLAP. USE A DOUBLE ROW OF STAPI I E LT^OOERL I) '5' (10cm) APART AND 4" (10cm) ON CENTER TO SECURE BLANKETS. 5. FULL I E Pal I (I EDGE OF BLANKETS AT T'OP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES /STAKES APPROXIMATELY 12" r:3 APART IN A C;" (15cm) DEEP 6" (15cm) WIDE_ TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJAC' N I I ANKE 1S MUST BE OVERLAPPED APPROXIMATELY 2" 5" (5cm- 12.5cm) (DEPENDING ON BLANKET TYPE) AND STAPLED. TO T.FI .ILF=F PROPER .;LAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH I11L COLORED `IE:_AM STITCH'ON THE BLANKET BEING OVERLAPPED. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9m -12m) INTERVALS. USE A DO! LE- o w OF `,TAPL ES STAGGERED 4" (10cm) APART AND 4" (l Ocm) ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. P. THE IL RMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES /STAKES APPROXIMATELY 12" (30cm) APART IN A C.)" (1 bc rn) DEER X 6" (15cm) WIDE TRENCH. BACK IL I AND COMPACT THE TRENCH AFTER STAPLING. A, CRITICAL POINTS 1. WITHIN A CHANNEL A. OVERLAPS AND SEAMS B. PROJECTED WATER LINE C. CHANNEL BOTTOM /SIDE SLOPE VERTICES EROSION ���CONTROL BLANKET INSTALLATION NOTE: HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF NECESSARY TO ALLOW STAPLES TO SECURE THE CRITICAL POINTS ALONG THE CHANNEL SURFACE. IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 cm) MAY BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. 12" (30 cm 6 (15 cm) (15 cm) FABRIC AMOCO 4535 NONWOVEN EX. SUBGRADE SEASONAL SOIL PROTECTION CHART 0 1. FOR EASIER INSTALLATION, LOWER WATER FROM LEVEL A TO LEVEL B BEFORE INSTALLATION. 2. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED NOTE: WHEN USING CELL -O -SEED, DO NOT SEED PREPARED AREA. CELL -O -SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 3. BEGIN AT THE TOP OF THE SHORELINE BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES /STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES /STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. 4. ROLL BLANKETS EITHER (A.) DOWN THE SHORELINE FOR LONG BANKS, (TOP TO BOTTOM) OR (B.) HORIZONTALLY ACROSS THE SHORELINE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES /STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM' STAPLES /STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 5. THE EDGES OF ALL HORIZONTAL AND VERTICAL BLANKET SEAMS MUST BE STAPLED WITH APPROXIMATELY 2 -5" (5cm- 12.5cm) OVERLAP. TO ENSURE PROPER SEAM ALIGNMENT BETWEEN ADJACENT BLANKETS, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH'"ON THE PREVIOUSLY INSTALLED BLANKET. SECURE ALL OVERLAPS WITH STAPLES SPACED 12" (30cm) APART. NOTE: SEAM OVERLAP SHOULD BE SHINGLED ACCORDING TO PREDOMINANT EROSIVE ACTION. 6. THE EDGE OF THE BLANKET AT OR BELOW NORMAL WATER LEVEL MUST BE ANCHORED BY PLACING THE BLANKET IN A 12" (30cm) DEEP X 6" (15cm) WIDE ANCHOR TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES /STAKES SPACED APPROXIMATELY 12" (30cm) APART IN THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING (STONE OR SOIL MAY BE USED AS BACKFILL.) NOTE: IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. EROSION CONTROL BLANKET INSTALLATION COMPACTED SOIL r SEDIMENT CONTROL FENCE 6" EXCAVATED KEYWAY 4 ALONG A SHORELINE 2 "X2" HARDWOOD I POSTS SPACED 6' O.C. NOT TO SCALE 12" (30 cm) 2 -5" 5cm- 12.5cm) 10' DIA. 2X4 IN. WOOD FRAME (3) 12" MULCH FILLED EROSION CONTROL LOGS 6" MULCH BOTTOM OVER GEOTEXTILE WOVEN FABRIC CONCRETE WASHOUT DETAIL BURIED FABRIC COMPACTED FILL --'I OVERFLOW LEVEL SET TO PREVENT BY -PASS FLOW BURIED FABRIC APPROACH 170 FABRIC DROP INLET PROTECTION 6" EXCAVATED KEYWAY InmwInnmmnuuumum S 6' -0" EROSION CONTROL ©END SECTION INLETS SEEDING SPECIFICATIONS 1. SWALES /GRASSED WATERWAYS: PERMANENT SEEDING SHALL TAKE PLACE BETWEEN MARCH 1 AND MAY 15 OR FROM AUGUST 10 TO OCTOBER 15 WITH THE FOLLOWING PER ACRE: 25 LBS. KENTUCKY 31 FESQUE 15 LBS. KENTUCKY BLUE GRASS 1000 LBS. 12-12-12 FERTILIZER 3000 LBS. MULCH (STRAW) 2. IF GRADES ARE ESTABLISHED BETWEEN MAY 15 AND AUGUST 10, A TEMPORARY SEEDING CONSISTING OF 40 LBS. OF ANNUAL RYEGRASS SHALL BE PLANTED PER ACRE. 3. IF GRADES ARE ESTABLISHED BETWEEN OCTOBER 15 AND DECEMBER 30, EITHER RYE (GRAIN) OR WHEAT MAY BE USED AT THE RATE OF 2 BUSHELS /AC. OATS MAY BE USED FOR EARLY SPRING PLANTING AT THE RATE OF 3 BUSHELS/AC. ALL GRAINS SHOULD BE CUT AT TIME OF PERMANENT SEEDING. ALL GRAINS SHOULD BE CUT PRIOR SEED MATURING. 4. IF TEMPORARY SEEDING IS ESTABLISHED PRIOR TO PERMANENT SEEDING, THE MULCH MAY BE ELIMINATED EXCEPT IN "BARE" AREAS. 5. IF GRADING OCCURS DURING DECEMBER, JANUARY OR FEBRUARY, NO SEEDING TO TAKE PLACE TILL SPRING PLANTING; HOWEVER, IT IS IMPERATIVE THAT ALL SEDIMENT FILTERS AND TRAPS ARE IN PLACE PRIOR TO BULK EARTH MOVING OR CLEARING. EROSION PROTECTION DURING CONSTRUCTION AND SEEDING 1. THE CONTRACTOR SHALL PROVIDE ADEQUATE EROSION PROTECTION MEASURE DURING CONSTRUCTION SUCH AS, BUT NOT LIMITED TO: A. B. C. D. E. F. G. SILTATION BASINS SILT TRAPS STRAW BALE DAMS SOIL CEMENT MULCH AND SEEDING SOIL STABILIZATION FABRIC JUTE NETTING 2. DETAILS AND PLACEMENT SPECIFICATION FOR THE ABOVE ITEMS ARE AVAILABLE ON REQUEST FROM THE ENGINEER. 3. ALL CONSTRUCTION AREAS ARE TO BE SEEDED IMMEDIATELY FOLLOWING GRADING. 4. SWALE AND LAKE SLOPE SEEDING: SEED AND FERTILIZE WITHIN CONSTRUCTION LIMITS IMMEDIATELY AFTER CONSTRUCTION WITH 5# /ACRE "RED TOP" GRASS, 20 ACRE "RYE GRASS 20# /ACRE "BLUE GRASS 25# /ACRE "TALL FESCUE" GRASS AND 600# /ACRE 12/12/12 FERTILIZER. CUT AND FILL SEEDING ALONG STREETS: 25# /ACRE "TALL FESCUE" GRASS, 20# /ACRE "RYE GRASS 15# /ACRE "BLUE GRASS" AND 600# /ACRE 12/12/12 FERTILIZER. (APPROXIMATELY 25 FEET BEHIND CURB FOR SEEDING ALONG STREET). PAD AND PARKING AREAS SHALL BE SEEDED WITH 40# /ACRE OE ANNUAL RYE GRASS. 5. WOOD CELLULOSE FIBER, STRAW OR MULCH SHALL BE APPLIED AT A RATE OF 3/4 TONS PER ACRE AND SHALL BE REQUIRED FOR ALL SWALE, LAKE SLOPE AND STREET SEEDING. 6. STONE RIPRAP (MINIMUM 1/3 CUBIC VELOCITY STREAM FLOW. FLOW 6" STONE DEPTH (MIN) SEE PLAN PLAN SILT FENCE, SEE DETAIL C206 FOR ADDITIONAL INFORMATION. KEEP SILT FENCE IN PLACE UNTIL GRASS IS WELL ESTABLISHED. 0 EROSION CONTROL BLANKET NORTH AMERICAN GREEN S150 OR EQUAL. FOR SECURING THE BLANKET USE A STAPLE PATTERN OF 3.5 STAPLES PER SQ. YD. FOOT) IS TO BE UTILIZED IN AREAS OF HIGH 0 GRADE 1% OR AS SHOWN BELOW e,' NOTE: 1. SOUTH ENTRANCE TO 131ST STREET TO BE USED FOR TEMPORARY CONSTRUCTION ENTRANCE. 2. STONE SIZE SHALL CONFORM TO ASTM D48 SIZE #1 (1 1/2" TO 3 1/2" DIA.). (INDOT CA. #2) 3. PERIODIC 2" STONE TOP DRESSING WASHING AS REQUESTED BY COUNTY /CITY. TEMPORARY CONSTRUCTION ENTRANCE DETAIL (HAMILTON CO.) rn C (I) C 0 U as c C CL) 0 U J C a) E 0 0 a a) U a) C,) a) v C 0 cc) h- a) E 0 v o 0) 0o x c N 0 i. a.) a) C Cr) C a) rn C a 3 0 ._.�3 v) •O o0 °o co C7 rn I CO CO CD 0 U M o .cu 3Nd O �O C L W N N N) (n U SN N in W 0 f 0 F-W 0_ 0CL0