HomeMy WebLinkAbout34 C802 Site DetailsSITE ENGINEER:
3
7/23/04
PER CITY OF CARMEL HAMi. TON
COUNTY SURVEYOR, AND SCS
COMMENTS
2
6/30/04
PER CIE /CL AY WASTE COMMENTS
1.
6/30/04
PER SCS COMMENTS
NO.
DAM
REP1S/ON DESCRIP110N
\MIlitilo i/
G. PA /1
E.• T RE. sr
0-
c
90( i i 9
.5, c...- AT, C 4.i
I
44k.
!1 t, c
1/4' ON A L CC--
1/1 /111111\"
Cr.- OM 0-3SL,
CLIENT:
PLATINUM
PROPERTIES,
LLC
9551 DELEGATES ROW
INDIANAPOLIS, INDIANA 46250
PHONE: 317- 818 2900
FAX: 317-818-2910
CONHOENTIALRY STATEMENT
The recipient of these materials understands that
copyright in the materials is owned by 1E1, and also,
that the materials contain priviledged and confidential
business information of 1E1. Accordingly, the recipient
agrees to retain these materials in strict confidence
and agrees not to disclose these materials to any
other party and further agrees not to make copies of
the materials. The recipient agrees to use the
materials only for the limited purpose for which 1E1
has made the materials available, and recipient agrees
to return all materials to 1E1 either upon completion of
the intended purpose or upon the request of 1E1,
whichever comes first.
SITE ADDRESS:
BELLEWOOD SUBDIVISION
131st STREET WEST ROAD
CARMEL, INDIANA
SCALE.
N T S
DA1E
7/23/04
DESIGNED 13r. DGP
MOW dr. HwR
CHECKED BY
DGP
112° 8" 03-03
f7LE NAME 0327C801.dwg
0M/Y//IC IEL
SITE
DETAILS
MOPLASTIC TRAFFIC MARKING THROUGH ARROW
'EMENT MARKINGS SHALL BE PER INDOT SPECIFICATIONS FOR THERMOPLASTIC TRAFFIC MARKINGS.)
TOP OF BANK
UPPER EXISTING CHANNEL
I OF EXISTING TOP OF
DCATED TOP OF BANK
f BANK OF
D CHANNEL
NORMAL POOL
:LEV. 872.00-
0
2-1O
6
SAFETY LEDGE1
RMOPLASTIC TRAFFIC MARKING LEFT TURN ARROW
\VEMENT MARKINGS SHALL BE PER INDOT SPECIFICATIONS FOR THERMOPLASTIC TRAFFIC MARKINGS.)
CHANNEL STEEP PLAN VIEW
CHANNEL STEEP ELEVATION VIEW
OUTLET CONTROL STRUCTURE
(SEE DETAIL)--\ EMERGENCY SPILLWAY
ELEV. 876.5
1'
cj
Ft)
TOP OF DAM
ELEV. 878.5
-COMPACTED APPROVED FILL
(ML-CL OR CL SOIL TYPES)
(6" MIN. TOPSOIL. ON FACE)
x 5'-O" x 0'-6"
CONC. ANITSEEP COLLAR
TOP OF BANK
UPPER EXISTING CHANNEL
CHANNEL
FLOWLINE
X 6' X 9" RENO MATTRESS
TRANSITION OF EXISTING TOP OF
BANK TO RELOCATED TOP OF BANK
7 2-12' X 6' X 9" RENO MATTRESSES AND
2-12' X 3' X 1'--6" GABIONS
TOP OF BANK OF
LOWER RELOCATED CHANNEL
X 6' X 9" RENO MATTRESSES AND
EMERGENCY SPILLWAY
100 YR. ELEV.
13'
c_ CHANNEL FLOWLINE
FLOWLINE UPPER CHANNEL
RELOCATED CHANNEL SIDESLOPES
RIPRAP GABIONS
CHANNEL STEEP W/ RIPRAP GABIONS AND RENO MATTRESS DETAILS
NOT TO SCALE
RCP OUTLET
PIPE W/ WATER
TIGHT JOINTS
NJ
10'
DETENTION POND DAM SECTION
0.30'
SPILLWAY CREST ELEVATION 876.50
THERMOPLASTIC TRAFFIC MARKING RIGHT TURN ARROW
(ALL PAVEMENT MARKINGS SHALL BE PER INDOT SPECIFICATIONS FOR THERMOPLASTIC TRAFFIC MARKINGS.)
EMERGENCY SPILLWAY SECTION
NOTES:
6"
FLOWLINE OF LOWER CHANNEL
CHANNEL STEEP CENTERLINE SECTION
1. GABION BASKETS AND RENO MATTRESSES SHALL BE
FILLED W/ INDOT APPROVED RIPRAP MATERIAL PER SECTION
904.04.
2. GABION BASKETS AND RENO MATTRESSES MANUFACTURE
TO BE BY "MACCAFERRI GABIONS" AND SHALL BE PVC
COATED.
COMPACTED APPROVED FILL
MATERIAL
(ML-CL OR CL SOIL TYPES)
x 5'--0" x
CONC. ANITSEEP COLLAR
COMPACTED TOPSOIL ON FACE
(6" MIN. TOPSOIL ON FACE)
-MIN. COMPACTED
CLAY CORE CUT OFF TRENCH
TO IMPERVIOUS SOIL LAYER
ON COMPACTED FILL, VERIFY IN FIELD
10' MAINTENANCE LEDGE
CONCRETE END
SECTION
RELOCATED
CHANNEL
FLOWLINE OF UPPER CHANNEL
PREPARED SUBGRADE
0.30'
18" MIN. DEPTH RIPRAP
O
0
0
THERMOPLASTIC PAVEMENT STANDARD MARKINGS DETAIL
(ALL PAVEMENT MARKINGS SHALL BE PER INDOT SPECIFICATIONS FOR THERMOPLASTIC TRAFFIC MARKINGS.)
100
TRANSVERSE
EXPANSION
JOINTS
CURB JOINT DETAIL
SCORE
CONCRETE CRACK SEALER
(DOW)
CONTRACTION JOINT
CONCRETE CRACK SEALER
(DOW)
EXPANSION JOINT
1"- INDOT SECTION 403
HOT ASPHALTIC
CONCRETE SURFACE #11
110#/SYD
5" #53 COMPACTED AGGREGATE
BASE INDOT SECTION 303
3/8"
CONCRETE JOINT DETAILS
1111111
10' I 30'
COMPACT SUBGRADE
TO 95% STANDARD PROCTOR (ASTM D 698)
TYPICAL MULTI—USE PATH
PAVEMENT SECTION
ON SITE
10' 30'
SOLID YELLOW LINES
STOP LINE
SOLID WHITE LINE
CROSSWALK LINE
SOLID WHITE LINE
SCORE
0
1/8" RADIUS
1/8" RADIUS
NON-EXTRUDING
MATERIAL
2"- INDOT SECTION 403
HOT ASPHALTIC
CONCRETE #9
BINDER 3301//SYD
DASHED WHITE LANE LINE
DASHED YELLOW LANE LINE
CENTER LINE 4—LANE UNDIVIDED
0
10'
30'
30'
10'
10'
TRANSVERSE CONTRACTION JOINTS
4"
t
BOTTOM OF CURB
PLANTING AREA
2' CONC. ROLL
CURB GUTTER
CO 't
Pavement Surface
\\1\\\
TO MATCH EXISTING
PAVEMENT GRADE
TOPSOIL
6"
BACKFILL
RETURNED CURB HANDICAP RAMP
Co
NOTE: 1) SUBGRADE TO BE A FREE DRAINING MATERIAL
COMPACTED TO 90% OF MAXIMUM AS DETERMINED
BY ASTM 0-698.
2) CONCRETE TO BE 4000 PSI 28 DAYS WITH
5 TO 7% AIR ENTRAINMENT.
LOW
POINT
COMPACTED
SUB BASE #53
AGGREGATE
24" OR MATCH EXISTING CURB
4 1/2"
CO
NOTES:
1. FOR CONSTRUCTION ADJACENT TO CONCRETE PAVEMENT,
EXPANSION CONTRACTION JOINTS SHALL. BE PLACED AT
THE SAME LOCATIONS AS IN THE PAVEMENT SLAB. THE
CURB GUTTER SHALL BE TIED TO THE PAVEMENT BY
1/2" ROUND DEFORMED BARS AT 3' INTERVALS.
2. FOR CONSTRUCTION ADJACENT TO ASPHALT PAVEMENT,
EXPANSION CONTRACTION JOINTS SHALL BE PLACED AT
THE LOCATIONS AS SHOWN ON JOINT DETAIL.
2' CONCRETE ROLL CURB GUTTER
BACKFILL REQUIREMENT
FOR RESIDENTIAL STREETS ONLY
The following Typical Sections apply to Residential Streets.
Granular backfill will not be required when entire trench area is
5'-0" or more beyond the edge of roadway surface.
5-0"
TYPICAL SECTION, CURB GUTTER STREETS
Granular backfill will not be required when entire trench area is 5'--O"
or more beyond the back edge of the existing curb.
All excavated areas under paved roadways, or within 5-0" of the pavement
edge, or back edge of curb shall be backfilled with granular material to within
3 inches of the top of the trench (or to final grade under pavement). This
granular backfill shall be placed in 12 inch lifts and each layer shall be required to match existing
compacted by mechanical means to at least 95% of its maximum dry density.
however, granular backfill may be placed in 24 inch lifts provided each layer
is compacted by a combination of saturation and mechanical means to at least
95% of its maximum dry density.
If any portion of trench area is nearer than 5-0" from the edge of the
roadway surface, the entire trench must be backfilled with granular material.
This compaction procedure is not required for unimproved area or where
problems related to trench settlement is negligible.
All seeding and sodding shall conform to the latest edition of the
ISHC Standard Specifications.
f-4"
CONCRETE WALK
DETECTABLE MARKINGS,
TACTILE WARNING
SURFACE REQUIRED
PAVEMENT
VERIES
I
Existin Grade
Compacted earth
backfill, using mechanical
compaction equipment.
12:1 MAX. SLOPE, 4.0' MIN. LENGTH
FOR TRANSITION TO 4" ROLL CURB
OR 6' MIN. LENGTH FOR TRANSITION TO
6" CHAIRBACK CURB.
1.0' MINIMUM
-4' SIDEWALK
Top soil, seed or sod as
SECTION AA
3) CONTRACTOR TO COMPLY WITH AMERICANS WITH DISABILITIES
ACT REQUIREMENTS WHEN CONSTRUCTING FACILITIES FOR
HANDICAP ACCESSIBILITY.
4) APPLY IPATOP-ARC ABRASION RESISTANT COATING TO ALL
SLOPED SURFACES WITH ADA YELLOW COLOR ADDED.
INSTALL PER MANUFACTURERS REQUIREMENTS.
5) WIDTH SHALL MATCH APPROACH WALK WIDTH.
Cr)
C
4=-7
C C
ci c
C> CD
a L E E
v 0-
v-) 0
c
0 0 a>
-J -J
0)
1-
C
0
a)
(f)
10
(0
Cr)
C)
00
C`J
CO
0
E
0
ci)
C
Q.)
C
SHEET NO:
C802
a>
E.