HomeMy WebLinkAbout09020016 Landscaping for Primrose School, Carmel Science & Tech Park Blk7 Lot 3 pg. 02DATE:
04/17/09
PROJECT NO.:
7425.001
DRAWN BY:
DCC
CHECKED BY:
BTB
SHEET TITLE:
LANDSCAPE
DETAILS
DRAWING FILES:
T: \7k \7425 \001 \dwgs \L101— L901.dwg
XREF: T: \7k \7425 \001 \dwgs \Title1.dwg
XREF: T: \7k \7425 \001 \dwgs \7425001— BS.dwg
XREF: T: \7k \7425 \001 \dwgs \001s— R- 2004.dwg
XREF: F: \TSC —LDT6 \Blocks \Seal btb.dwg
XREF: F: \TSC —LDT6 \Blocks \SIG— BTB.dwg
SHEET NO.:
Is80
iL
0
0
0
m
0
0
J
0
0
.J
a)
E
0
z
a)
L�
E
0
CO
0)
0
0
0
U)
0
0
NOTE: FOR DETAILED
REQUIREMENTS RELATED TO
THE PLANTING OF THE TREE IN
THE IMPROVED SOIL, SEE "TREE
PLANTING DETAIL."
LOAMY SOIL
TAMP SOIL AROUND
ROOT BALL BASE
FIRMLY WITH FOOT
PRESSURE SO THAT
ROOT BALL DOES NOT
SHIFT.
NOTE:
STAKE TREES ONLY UPON THE APPROVAL
OF THE LANDSCAPE ARCHITECT
NOTE:
WRAP TREE TRUNKS ONLY UPON THE
APPROVAL OF THE LANDSCAPE ARCHITECT.
MARK THE NORTH SIDE OF THE TREE IN
THE NURSERY, AND ROTATE TREE TO FACE
NORTH AT THE SITE WHEN EVER POSSIBLE.
SET TOP OF ROOT BALL FLUSH TO
GRADE OR 25 -50 MM (1 -2 IN.)
HIGHER IN SLOWLY DRAINING SOILS.
75 MM (3 IN.) MULCH. DO NO PLACE
MULCH IN CONTACT WITH TREE
TRUNK. MAINTAIN THE MULCH
WEED —FREE FOR A MINIMUM OF
THREE YEARS AFTER PLANTING.
NOTE: FOR DIMENSIONS OF PLANTING AREAS,
TYPES OF SOIL AMENDMENTS, OR SOIL
REPLACEMENT, SEE "SOIL IMPROVEMENT DETAILS."
3" SAUCER FILLED WITH
3" SHREDDED BARK
MULCH EXTENDED 6"
FROM PIT
2 TIMES THE ROOT BALL
DIAMETER
REMOVE ANY TWINE OR SYNTHETIC
TAPES FROM SHRUB TRUNK
BACKFILL PER
SPECIFICATIONS
200 MM (8 IN.)
tdfu uuu Flit
NOTE: THIS DETAIL ASSUMES THAT THE PLANTING SPACE IS LARGER THAN AN 8' SQUARE OPEN TO THE SKY, AND NOT COVERED
BY ANY PAVING OR GRATING.
TREE PLANTING DETAIL FOR 8 &B IN ALL SOIL TYPES 1
LOAMY SOILS INCLUDE THE FOLLOWING USDA TEXTURAL CLASSIFICATIONS AND HAVE A CLAY CONTENT
OF BETWEEN 15 TO 27 LOAM, SANDY LOAM AND SILT LOAM. NOTE THAT SOILS AT THE OUTER
LIMITS OF THE LOAM CLASSIFICATIONS MAY PRESENT SPECIAL PLANTING PROBLEMS NOT ANTICIPATED
BY THIS DETAIL.
LOAMY SOILS ARE DEFINED AS GRANULAR OR BLOCKY FRIABLE SOILS, A MIXTURE OF SAND, SILT AND
CLAY PARTICLES WITH A MINIMUM OF 1.5% BY DRY WEIGHT ORGANIC MATTER. THE SOIL MUST NOT BE
SO COMPACTED AS TO IMPEDE ROOT GROWTH OR DRAINAGE. THE SOIL STRUCTURE SHALL NOT BE
PLATY OR MASSIVE. THE SOIL MUST BE TESTED FOR TEXTURE, DRAINAGE CAPABILITY, PH, AND
NUTRIENT VALUES PRIOR TO DETERMINING ANY ADDITIONAL SOIL IMPROVEMENTS. CONTRACTOR SHALL
CONSULT LANDSCAPE ARCHITECT IN POOR SOIL CONDITIONS.
NOTE: TREES PLANTED IN NON RESTRICTED SOIL CONDITIONS. THIS DETAIL ASSUMES THAT THE
AREA OF LOAMY SOIL AVAILABLE TO EACH TREE IS A MINIMUM OF 500 SQUARE FEET.
SOIL IMPROVEMENT D
NOT TO SCALE
1:1 SLOPE ON SIDES OF
PLANTING HOLE.
UNEXCAVATED OR
REMOVE BURLAP FROM TOP 1/3 _p
OF ROOTBALL
12' MIN.
SHRUB DETAIL
NOT TO SCALE
NOT TO SCALE
BACK FILL WITH EXISTING
SOIL. IN SANDY LOAM
SOILS, ADD 20% MAX. BY
VOLUME COMPOSTED
ORGANIC MATERIAL TO THE
EXISTING SOIL.
COMPACTED MOUND UNDER
THE ROOT BALL TO PREVENT
SETTLEMENT.
L8�
t~FINISH GRADE
EXISTING SUBSOIL OR
COMPACTED BACKFILL
MULCH RING 1800 MM (6 FT.) DIA
MIN. 2400 MM (8FT.) DIAM.
PREFERRED
11" 1
5 Sal Sr—l= II I I
NOT TO SCALE
TAMP SOIL AROUND ROOT BALL BASE
FIRMLY WITH FOOT PRESSURE SO THAT
ROOT BALL DOES NOT SHIFT.
VERTICAL EDGE
3" SHREDDED BARK MULCH
BACKFILL PER
SPECIFICATIONS
LAWN AREA
NOTE:
DO NOT HEAVILY PRUNE THE TREE AT PLANTING.
PRUNE ONLY CROSSOVER LIMBS, CO— DOMINANT
LEADERS, AND BROKEN OR DEAD BRANCHES. SOME
INTERIOR TWIGS AND LATERAL BRANCHES MAY BE
PRUNED; HOWEVER, DO NOT REMOVE THE
TERMINAL BUDS OF BRANCHES THAT EXTEND TO
THE EDGE OF THE CROWN.
NOTE:
STEEL LAWN tDGING SHALL BE USED AT
ALL LAWN EDGES AND AT EDGES OF
MULCHED AREAS (FOR CONTAINMENT).
EACH TREE MUST BE PLANTED SUCH THAT THE
TRUNK FLARE IS VISIBLE AT THE TOP OF THE
ROOT BALL. TREES WHERE THE TRUNK FLARE IS
NOT VISIBLE SHALL BE REJECTED. DO NOT
COVER THE TOP OF THE ROOT BALL WITH SOIL.
IF PLANT IS SHIPPED WITH A WIRE BASKET AROUND THE
ROOT BALL, CUT THE WIRE BASKET IN FOUR PLACES AND
FOLD DOWN 200 MM (8 IN.) INTO PLANTING HOLE.
PLACE ROOT BALL ON UNEXCAVATED
OR TAMPED SOIL.
100 MM (4 IN.) HIGH EARTH SAUCER
BEYOND EDGE OF ROOT BALL.
REMOVE ALL TWINE, ROPE AND WIRE, AND
BURLAP FROM TOP HALF OF ROOT BALL
PLANING OR MULCHED AREA
NOT TO SCALE
TYPICAL SPACING
EXISTING GRADE OR
GRADE OF PLANTING AREA
NOT TO SCALE
NOTE:
TRENCH EDGE SHALL CREATE A
CLEAN SEPERATION BETWEEN AREAS;
AND SHALL CREATE SMOOTH AND
EVEN LINES (AS INDICATED ON THE
PLANS).
FINISH GRADE
EXISTING SUBSOIL OR
COMPACTED BACKFILL
GROUNDCOVER DETAIL
MULCH AS SPECIFIED
p KotiAiRy
DATE: 04/17/09
THIS DRAWING AND THE IDEAS, DESIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRITTEN CONSENT OF THE SCHNEIDER
CORPORATION,
COPYRIGHTED BY THE SCHNEIDER CORP. (2008)
tZ
Schneider
THE SCHNEIDER CORPORATION
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216 -1037
Telephone: 317.826.7100
Fax: 317.826.7200
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GIS LIS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering