HomeMy WebLinkAbout06120001 Large Plan for Old Meridian Place, Sec. 1 pg. 04THIS SHEET TO BE USED N CONTROL ONLY. MI M (SF) SCALE: 1"= 80' Denotes Silt Fence Denotes Construction Limits Selijize The following is a list in sequence of construction activities to control soil erosion: 1. The contractor shall schedule a Pre construction meeting with the City of Carmel prior to any construction on the site being started. Contractor and /or Developer to notify IDEM and City of Carmel 48 hours prior to construction beginning. 2. The construction entrance installed. 3. Maintenance and Refueling area constructed 4. Concrete washout area constructed 5. Posting information area shall be constructed. All items, as outlined in the in the O &M manual for Post Constuction water quality measures shall be placed in this area. 6. Perimeter Silt fencing to be installed. 7. Grade the site (sides of swales, mounds and ponds to be stabilized with erosion control blankets and to be seeded and mulched immediately upon completion). If the site remains inactive for a period of 15 days, stabilization is required to take place in the form of temporary seeding, mulch or spray on palimar. For temporary seeding, the contractor shall utilize a fast growing seed of either oats, annual ryegrass, wheat or rye depending on time of year. Disturbed areas should be kept to a minimum at all times. 8. Storm inlets are to be protected immediately after installation with Drop Inlet Protection'. 9. Contractor shall control mud accumulation on all streets surrounding project by installing stone surface at all locations where construction traffic leaves the site. Dust shall be kept to a minimum by utilizing sprinkling, Calcium Chloride, Vegetative cover, spray on adhesives or other approved methods. 10. Maintain all filters and traps for inlets during constructio to prevent any blockages from accumulated sediment. Additional seeding and straw bales may be required during construction as specifie by Engineer or City of Carmel. Payment for additional straw bales shall be at the contractor's expense. 11. Contractor shall install all sanitary sewers, storm sewers, subsurface drains, curbs, pavement and water mains. Disturbed areas will be stabilized after the storm and sanitary are installed. Disturbed areas will be stabilized after curbs, SSD and pavement are completed unless utilities are starting construction within 15 days of completing the curbs. Stabilize disturbed areas after the utilities are installed. 12. Complete Landscaping and sedding all remaining disturbed areas and remove all BMP's when areas are stabilized. 7— goo vo SF 4 3S STREET F STREET B PROPOSED UNDERGROUND RETENTION JS AS MIN 111111•1 =MN NNW PROPOSED UNDERGROUND RETENTION 4imil mow INEN mom STREET F AS -4 m _J VIM POS SIGN I LOCATION I EARTHWORK CONTRACTOR SHALL` REQUIRE ALL FUELING VEHICLE MAINTENANCE TO BE CONFINED TO THIS AREA ONLY. EQUIPMENT I VEHICLES ARE REQUIRED TO BE PARKED IN THIS LOCATION ONLY EARTHWORK CONTRACTOR SHALL INSTALL 20'x150' MIN. STONE ACCESS DRIVE PRIOR TO CONSTRUCTION. IP PROPOSED UNDERGROUND RETENTION <K, v 0 0 NOTE: 1. ANY ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. 2. IF SITE REMAINS INACTIVE FOR A PERIOD OF 2 WEEKS, THEN STABILIZATION IS REQUIRED TO TAKE PLACE IN THE FORM OF TEMPORARY SEEDING, MULCH, OR SPRAY ON PALIMAR. 3. CONTRACTOR TO CLEAN STREETS AT THE END OF EACH DAY WHEN DIRT AND CONSTRUCTION DEBRIS IS EVIDENT. 4. ALL POST CONSTRUCTION BMP'S SHOULD BE CLEANDED AT THE END OF CONSTRUCTION OF TOWNHOMES IN THE SUBDIVISION. J 0 L 0) (0 00 N O O 00 Q (1) L 0 f- z a_ 0 Z 0 U Z O (n O w DRAWN BY: BAH O W D J 0 z 0 z w Cr 0 CHECKED BY: EEF SHEET NO. C300 S &A JOB NO. 52605CTX NMI MINN NOM