The following is a list in sequence of construction
activities to control soil erosion:
1. The contractor shall schedule a Pre construction
meeting with the City of Carmel prior to any
construction on the site being started. Contractor
and /or Developer to notify IDEM and City of Carmel
48 hours prior to construction beginning.
2. The construction entrance installed.
3. Maintenance and Refueling area constructed
4. Concrete washout area constructed
5. Posting information area shall be constructed. All
items, as outlined in the in the O &M manual for
Post Constuction water quality measures shall be
placed in this area.
6. Perimeter Silt fencing to be installed.
7. Grade the site (sides of swales, mounds and
ponds to be stabilized with erosion control
blankets and to be seeded and mulched
immediately upon completion). If the site remains
inactive for a period of 15 days, stabilization is
required to take place in the form of temporary
seeding, mulch or spray on palimar. For
temporary seeding, the contractor shall utilize a
fast growing seed of either oats, annual
ryegrass, wheat or rye depending on time of
year. Disturbed areas should be kept to a
minimum at all times.
8. Storm inlets are to be protected immediately after
installation with Drop Inlet Protection'.
9. Contractor shall control mud accumulation on all
streets surrounding project by installing stone
surface at all locations where construction traffic
leaves the site. Dust shall be kept to a minimum
by utilizing sprinkling, Calcium Chloride, Vegetative
cover, spray on adhesives or other approved
methods.
10. Maintain all filters and traps for inlets during
constructio to prevent any blockages from
accumulated sediment. Additional seeding and
straw bales may be required during construction as
specifie by Engineer or City of Carmel. Payment for
additional straw bales shall be at the contractor's
expense.
11. Contractor shall install all sanitary sewers, storm
sewers, subsurface drains, curbs, pavement and
water mains. Disturbed areas will be stabilized
after the storm and sanitary are installed.
Disturbed areas will be stabilized after curbs, SSD
and pavement are completed unless utilities are
starting construction within 15 days of completing
the curbs. Stabilize disturbed areas after the
utilities are installed.
12. Complete Landscaping and sedding all remaining
disturbed areas and remove all BMP's when areas are
stabilized.
7—
goo vo
SF
4
3S
STREET F
STREET B
PROPOSED UNDERGROUND
RETENTION
JS AS
MIN 111111•1 =MN NNW
PROPOSED UNDERGROUND
RETENTION
4imil mow INEN mom
STREET F
AS
-4
m
_J
VIM
POS
SIGN
I LOCATION
I EARTHWORK CONTRACTOR SHALL`
REQUIRE ALL FUELING VEHICLE
MAINTENANCE TO BE CONFINED TO
THIS AREA ONLY. EQUIPMENT
I VEHICLES ARE REQUIRED TO BE PARKED
IN THIS LOCATION ONLY
EARTHWORK CONTRACTOR SHALL
INSTALL 20'x150' MIN. STONE ACCESS
DRIVE PRIOR TO CONSTRUCTION. IP
PROPOSED UNDERGROUND
RETENTION
<K,
v 0
0
NOTE:
1. ANY ADDITIONAL EROSION CONTROL MEASURES MAY
BE REQUIRED IN THE FIELD BY THE INSPECTOR.
2. IF SITE REMAINS INACTIVE FOR A PERIOD OF 2
WEEKS, THEN STABILIZATION IS REQUIRED TO TAKE
PLACE IN THE FORM OF TEMPORARY SEEDING, MULCH,
OR SPRAY ON PALIMAR.
3. CONTRACTOR TO CLEAN STREETS AT THE END OF
EACH DAY WHEN DIRT AND CONSTRUCTION DEBRIS IS
EVIDENT.
4. ALL POST CONSTRUCTION BMP'S SHOULD BE
CLEANDED AT THE END OF CONSTRUCTION OF
TOWNHOMES IN THE SUBDIVISION.
J
0
L
0)
(0
00
N
O
O
00
Q
(1)
L
0
f-
z
a_
0
Z
0
U
Z
O
(n
O
w
DRAWN BY:
BAH
O
W
D
J
0
z
0
z
w
Cr
0
CHECKED BY:
EEF
SHEET NO.
C300
S &A JOB NO.
52605CTX
NMI
MINN
NOM