HomeMy WebLinkAbout06120001 Large Plan for Old Meridian Place, Sec. 1 pg. 05THIS SHEET TO BE USED
FOR EROSION CONTROL ONLY.
PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL:
TODD SCHAEFER
CENTEX HOMES
PHONE (317) 806 -2920 EX.249
0
SCALE: 1 50'
1/1 IIIIIII 111111 MI Denotes Construction Limits
Temporary 'Drop Inlet Protection Basket "Sediment
"Curb Inlet Proctection"
Denotes permanent seeding areas
Seeding rate: 130# /acre or 3# /1000 S.F.
Seeding mixture: 25% creeping red fescue
35% perennial rye
40% Kentucky bluegrass
Denotes temporary seeding.
Seeding rate: 50# /acre
Seeding mixture: 100% perennial rye.
A9. Specific Points Where Stormwater Discharge Will Leave this Site:
An existing 24" pipe to the east.
Control Devices
Seedbed Preparation for Permanent Seeding
1. Test soil to determine pH and nutrient levels.
(Contact you county SWCD or Cooperative Extension
office for assistance and soils information, including
available testing services.)
2. If soil pH is unsuitable for the species to be
seeded, apply lime according to test recommendations.
3. Fertilize as recommended by the soil test. If testing
was not done, consider applying 400 -600 lbs. /acre of
12 -12 -12 analysis, or equivalent, fertilizer,
4. Till the soil to obtain a uniform seedbed, working
the fertilizer and lime into the soil 2 -4 in. deep with
a disk or rake operated across the slope.
I
1
1 as"
0
I
1
1{-
4
1
1
7 3 /7
STREET F
M►
allow
4-
allame
■1111 EMI 11•111111 MIN NM= MIMI MIN
MINN
allar
STREET B
NMI
PROPOSED UNDERGROUND
RETENTION
I
w —oi
w I T t 'i,
/0 0
I
130TH STREET
1
1
STREET
1
--//011±±0±±L--',7±,171±,//7/4-77-+-
//2,
t
7
a
6
r
l//
7 +0
Ft�TURL AMLNITI'�
5
„e±
+e
PROPOSEDI- UNDERGROUND
RETEK11ON
o,++
X
4
4-
f
4
Th 4
j 4
4
i+
4
O y
x�y x ®by0
I+
vow
l �i
/ij
N M
e i E
J
MIN
MINN
T r
-4-
MEN —110
1
..O
N
+0
lo■
loos
M.B.
ti
x� op
x %by xe"
S
7
1 x°
/0
S. 7,10
s
F
IIMM MEIN
+I
MINN
-W IMP
NOTE:
1. ANY ADDITIONAL EROSION CONTROL MEASURES MAY
BE REQUIRED IN THE FIELD BY THE INSPECTOR.
2. IF SITE REMAINS INACTIVE FOR A PERIOD OF 2
WEEKS, THEN STABILIZATION IS REQUIRED TO TAKE
PLACE IN THE FORM OF TEMPORARY SEEDING, MULCH,
OR SPRAY ON PALIMAR. NOTE:
3. CONTRACTOR TO CLEAN STREETS AT THE END OF
THE DAY WHEN DIRT AND CONSTRUCTION DEBRIS IS
EVIDENT.
4. ALL POST CONSTRUCTION BMP'S SHOULD BE
CLEANDED AT THE END OF CONSTRUCTION OF
TOWNHOMES IN THE SUBDIVISION.
G1STEq� ••�c��
Q No. .s:
19358
STATE OF sz:--
y N DIAN•
S S IONAL EN' 0
V
v
0
O
X
O
U
LC)
0)
u7
0)
ao
N)
a)
C
0
a_
0
F-
z
J
0
Z
0
U
Z
0
(n
O
w
z
w
W
V!
DRAWN B
BAH
S A JOB NO.
52605CTX
I-
I—
D
Y.
w
U
J
Z
O
W
D
J
0
CHECKED BY:
EEF
z
0
z
LLJ
U
SHEET NO.
C301