HomeMy WebLinkAboutC9.1 Site SpecificationsNa
DATE
REVISION DESCRIPTION
CLIENT
tai
B ANQUET CONFERENCE CENTER
the
CONFIDENTIALITY STATEMENT
understands that
owned by IEI, and also,
and confidential
Accordingly, the recipient
in strict confidence and
materials to any other
to make copies of the
to use the materials
for which IEl has made the
agrees to retum all
completion of the intended
of IEI, whichever comes
The recipient of these materials
copyright in the materials is
that the materials contain priviledged
business information of IEI.
agrees to retain these materials
agrees not to disclose these
party and further agrees riot
materials. The recipient agrees
only for the limited purpose
materials available, and recipient
materials to IEI either upon
purpose or upon the request
first.
SITE ADDRESS:
FOUNTAINS
DRIVE
DRIVE AND MA WAY
INDIANA
THE
502 CARMEL
CARMEL
CARMEL,
SCALE:
DATE: 7/28/04
DESIGNEDBY.: DWF
DRAWN BY: HWR
CHECKED BY: BAW
FIELD BOOK N/A
FILE NAME: 0424-SPEC .dwg
DRAWING TITLE:
SITE
SPECIFICATIONS
SHEET NO:
09
GENERAL NOTES
1. REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION INDOT) STANDARD
SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION
METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT
OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF
THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE.
2. CONTRACTORS SHALL CHECK WITH ENGINEER PRIOR TO START OF CONSTRUCTION TO
VERIFY DATE OF PLANS. MINOR CHANGES MAY BE MADE IF ALL REVIEWING AGENCY
APPROVALS ARE NOT GRANTED BEFORE BIDDING. CHANGES IN COST SHALL BE
NEGOTIATED PRIOR TO PHYSICAL CONSTRUCTION AND BASED ON UNIT PRICES
SUBMITTED ON THE CONTRACT.
3. CONTRACTORS SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE ALL MAINS,
CONDUITS, SERVICE LINES, ETC. IN THE AFFECTED CONSTRUCTION AREA.
EXISTING UTILITY STRUCTURES ARE SHOWN HERE IN ACCORDANCE WITH AVAILABLE
INFORMATION. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES AND
FACILITIES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION
(IN COOPERATION WITH APPLICABLE UTILITY), IS THE EXPRESSED
RESPONSIBILITY OF THE CONTRACTOR IN THE PERFORMANCE OF THE CONTRACT
AND IN PREPARATION OF THE BID.
4. BACKFILL AROUND ALL STRUCTURES AND IN ALL TRENCHES BENEATH PAVED AREAS
SHALL BE COMPACTED GRANULAR MATERIAL IN ACCORDANCE WITH INDOT SECTION 211.
5. FILL MATERIAL SHALL CONSIST OF EARTH OBTAINED FROM CUT AREAS, BORROW
PITS OR OTHER APPROVED SOURCES. EARTH SHALL BE FREE FROM ORGANIC MATTER
AND OTHER DELETERIOUS SUBSTANCES AND LARGE ROCKS. THE FILL MATERIAL SHALL
BE PLACED IN LAYERS NOT TO EXCEED SIX INCHES FOLLOWING COMPACTION, PROPER
MOISTURE CONTENT OF FILL MATERIAL WILL BE SUCH TO ACHIEVE SPECIFIED
COMPACTION DENSITY. ALL FILL BENEATH PAVED AREAS, FLOOR SLABS AND FUTURE
BUILDINGS SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY
PER ASTM D -1557.
FIELD COMPACTION TEST SHALL BE RUN ON EACH LIFT, IN FILL SECTIONS, AND
THE REQUIRED COMPACTION ON EACH LIFT SHALL BE ATTAINED PRIOR TO PLACING
THE NEXT LIFT. COMPACTION TESTS SHALL BE IN ACCORDANCE WITH INDOT
SECTION 211.
CLEARING AND GRUBBING
1. CLEARING AND GRUBBING SHALL CONSIST OF CUTTING, REMOVING AND SATISFACTORY
DISPOSING OF ALL TREES, DOWNED TIMBER, BRUSH, PROJECTING ROOTS, STUMPS,
RUBBISH, BOULDERS, BROKEN CONCRETE, FENCING (AS DESIGNATED), AND OTHER
MATERIAL ON THE PROJECT SITE AND WITHIN THE BOUNDARY AS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND /OR AS DESIGNATED BY "CONSTRUCTION LIMITS
2. ALL "UNSUITABLE MATERIAL" FROM CLEARING OPERATIONS SHALL BE REMOVED TO
DISPOSAL AREA(S) OFF OF THE PROJECT SITE; NO "BURY PITS" SHALL BE USED
FOR ONSITE DISPOSAL.
3. MATERIALS SHALL NOT BE DISPOSED OF BY BURNING UNLESS APPROVED BY THE LOCAL
FIRE MARSHAL.
TREE REMOVAL AND PROTECTION
1. TREES SHALL BE REMOVED FROM THE PROJECT ONLY WHERE THE AREA IS TO BE
OCCUPIED BY ROAD AND SURFACED AREAS.
2. TREES SHALL BE REMOVED FROM THE PROJECT SITE AS DIRECTED BY THE DEVELOPER.
3. TREES SHALL BE REMOVED FROM THE PROJECT SITE WHERE THEY INTERFERE DIRECTLY
WITH THE PLACEMENT OF STORM OR SANITARY SEWERS, AND THAT SUCH EXCAVATION
IS OR WILL BE FATAL TO SUCH ADJACENT TREES.
4. THE CONTRACTOR SHALL ENDEAVOR TO SAVE AND PROTECT TREES OF VALUE AND
WORTH WHICH DO NOT IMPAIR CONSTRUCTION OF IMPROVEMENTS AS DESIGNATED.
IN THE EVENT CUT OR FILL EXCEEDS 0.5 FEET OVER THE ROOT AREA, THE
DEVELOPER SHALL BE CONSULTED WITH RESPECT TO PROTECTIVE MEASURES TO BE
TAKEN, IF ANY, TO PRESERVE SUCH TREES.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE METHOD FOR
PROTECTION OF TOPS, TRUNKS AND ROOTS OF EXISTING TREES ON THE PROJECT SITE
THAT ARE TO REMAIN. EXISTING TREES SUBJECT TO CONSTRUCTION DAMAGE SHALL
BE BOXED, FENCED OR OTHER MATERIAL AND EQUIPMENT SHALL NOT BE STOCKPILED
OR STORED WITHIN THE SPREAD OF BRANCHES. BRANCHES WHICH NEED TO BE
REMOVED OR ARE BROKEN SHALL BE NEATLY TRIMMED AND SCARS SHALL BE COVERED
WITH TREE PAINT.
STRIPPING OF TOPSOIL
1. THE CONTRACTOR SHALL VERIFY THAT ALL TOPSOIL HAS BEEN REMOVED IN THE AREAS
TO BE OCCUPIED BY ROAD, WALKS AND DESIGNATED BUILDING AREAS. TOPSOIL
SHALL BE REMOVED TO A DEPTH OF SIX (6) INCHES OR DEEPER, IF NECESSARY, TO
REMOVE ORGANIC MATTER WHERE REQUIRED.
2. TOPSOIL SHALL BE KEPT SEPARATED FROM SUITABLE FILL MATERIALS AND SHALL NOT
BE USED AS FILL UNDER PAVEMENT, BUILDING AREAS AND /OR FUTURE STRUCTURAL
AREAS.
3. TOPSOIL SHALL BE STORED AT A LOCATION WHERE IT DOES NOT INTERFERE WITH
CONSTRUCTION OPERATIONS. EXCESS TOPSOIL SHALL BE REMOVED FROM THE SITE.
4. TOPSOIL SHALL BE REASONABLY FREE FROM SUBSOIL DEBRIS AND STONES.
PAVEMENT CONSTRUCTION
1. THE INDIANA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, LATEST
EDITION SHALL APPLY TO WORKMANSHIP AND MATERIALS IN CONSTRUCTION OF
SUBGRADE, PAVEMENT, CURBS AND WALKS.
a. PREPARE THE SUBGRADE IN ACCORDANCE WITH INDOT SECTION 207. NO TRAFFIC
WILL BE PERMITTED ON THE PREPARED SUBGRADE PRIOR TO PAVING.
b. BITUMINOUS PAVEMENT IN ACCORDANCE WITH INDOT SECTION 402.
c. FINISHING EARTH GRADED SHOULDERS, DITCHES AND SLOPES IN ACCORDANCE
WITH INDOT SECTION 208.
CONCRETE CURB AND WALKS
SEE DETAIL SHEET FOR TYPE AND DETAILS.
2. CONCRETE SHALL BE READY MIXED PORTLAND CEMENT AND WATER CONFORMING TO
A.S.T.M C -150. AGGREGATES SHALL CONFORM TO A. S.T.M. C -33. COMPRESSIVE
STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 4000 P.S.I. WHERE REQUIRED,
REINFORCEMENT SHALL BE WELDED STEEL WIRE FABRIC CONFORMING TO A.S.T.M.
A -185.
3. ALL EXTERIOR CONCRETE SHALL CONTAIN 3% TO 6% AIR ENTRAINMENT.
4. APPLICATION
a. PLACE CONCRETE ONLY ON A MOIST, COMPACT SUBGRADE OR BASE FREE FROM
LOOSE MATERIAL. PLACE NO CONCRETE ON MUDDY OR FROZEN SUBGRADE IN
ACCORDANCE WITH INDOT SECTION 604 AND 605.
b. CONCRETE SHALL BE DEPOSITED SO AS TO REQUIRE AS LITTLE REHANDLING AS
PRACTICAL. WHEN CONCRETE IS TO BE PLACED AT AN ATMOSPHERIC
TEMPERATURE OF 35 DEGREES F OR LESS, PARAGRAPH 702.11 OF THE INDOT
SPECIFICATIONS SHALL APPLY.
c. EXCEPT AS OTHERWISE SPECIFIED, CURE ALL CONCRETE BY ONE OF THE METHODS
DESCRIBED IN INDOT SECTION 501.17.
5. TOP OF CASTING ELEVATIONS REFER TO THE CASTING'S RIM OR TOP OF CURB. THE
CURB CONTRACTOR SHALL INSURE THAT CURB INLET CASTINGS ARE SET AT PROPER
ELEVATION PRIOR TO CONSTRUCTION OF ADJACENT CURB.
DEMOLITION
THE CONTRACTOR SHALL EXCAVATE, DEMOLISH, REMOVE AND DISPOSE OF THE DEBRIS
FROM THE AREAS SHOWN ON THE SITE DEVELOPMENT PLAN.
a. BUILDING WALLS.
b. FOUNDATIONS.
c. PAVEMENT (CONCRETE, ASPHALT AND BRICK).
d. CONCRETE SLABS.
2. ALL MATERIAL AS A RESULT OF THE GENERAL DEMOLITION SHALL BE THE PROPERTY
OF THE CONTRACTOR. THE CONTRACTOR'S LUMP SUM BID PRICE FOR THE DEMOLITION
SHALL TAKE INTO ACCOUNT THE SALVAGEABLE VALUE OF MATERIALS AND SAID BID
PRICE SHALL REFLECT SAID SAVINGS.
3. THE CONTRACTOR SHALL BE REQUIRED TO DEMOLISH AND REMOVE DESIGNATED
FOUNDATION WALLS, RETAINING WALLS, CURBING, CONCRETE SLABS, PAVING, TANKS,
STRUCTURES, PIPES, MANHOLES AS SHOWN ON THE CONTRACT DOCUMENTS. ALL
EXISTING BASEMENT FLOOR SLABS THAT ARE NOT REMOVED SHALL BE BROKEN UP
SUFFICIENTLY TO PERMIT DRAINAGE THROUGH THE SLAB. ALL EXISTING BASEMENT
WALLS, FOUNDATIONS, FLOOR SLABS, AND ETC. SHALL BE REMOVED TO AN ELEVATION
SUCH THAT THEY WILL NOT SUPPORT PROPOSED FLOOR SLABS OR PAVEMENTS.
4. THE CONTRACTOR SHALL OBTAIN FROM THE CITY OF INDIANAPOLIS, AND ALL OTHER
APPLICABLE GOVERNMENTAL AUTHORITIES, NECESSARY PERMITS REQUIRED, A COPY
OF SUCH PERMITS TO BE FURNISHED TO THE OWNER PRIOR TO COMMENCEMENT OF ANY
WORK REQUIRED HEREIN. THE CONTRACTOR SHALL FURTHER FURNISH TO THE OWNER
PROOF THAT HE HAS COMPLIED WITH THE PROVISIONS OF THE MUNICIPAL CODE OF
INDIANAPOLIS, INDIANA.
UTILITIES
1. CONDUIT SHALL BE REQUIRED FOR ALL ELECTRICAL AND TELEPHONE LINES UNDER
PAVED AREAS.
2. COMPACTED GRANULAR BACKFILL SHALL BE REQUIRED FOR ALL CROSSINGS OF PAVED
AREAS PER INDIANAPOLIS DEPARTMENT OF TRANSPORTATION SPECIFICATIONS.
SOIL EROSION CONTROL SUMMARY
1. CONTRACTOR SHALL INSTALL SEDIMENT TRAPS AND STRAW BALE FILTERS AS SHOWN.
2. MASS GRADE THE SITE (SIDES OF SWALES, MOUNDS AND PONDS TO BE SODDED OR
SEEDED AND MULCHED IMMEDIATELY UPON COMPLETION). TEMPORARY SEEDING SHALL
BE RECOMMENDED FOR ALL SWALES AND DISTURBED AREAS THAT CANNOT BE FINAL
SEEDED WITHIN A TIME PERIOD THAT WILL PREVENT SOIL EROSION, FOR TEMPORARY
SEEDING THE CONTRACTOR SHALL UTILIZE A FAST GROWING SEED OF EITHER OATS,
ANNUAL RYEGRASS, WHEAT OR RYE DEPENDING UPON TIME OF YEAR. DISTURBED
AREAS SHOULD BE KEPT TO A MINIMUM AT ALL TIMES.
3. CONTRACTOR SHALL CONTROL MUD ACCUMULATION ON ALL STREETS SURROUNDING THE
PROJECT BY INSTALLING STONE SURFACE AT ALL LOCATIONS WHERE CONSTRUCTION
TRAFFIC LEAVES THE SITE. DUST SHALL BE KEPT TO A MINIMUM BY UTILIZING
SPRINKLING, CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY ON ADDITIVES OR
OTHER APPROVED METHODS.
4. MAINTAIN ALL FILTERS AND TRAPS DURING CONSTRUCTION TO PREVENT ANY
BLOCKAGES FROM ACCUMULATED SEDIMENT. ADDITIONAL SEEDING AND STRAW
BALES MAY BE REQUIRED DURING CONSTRUCTION AS SPECIFIED BY ENGINEER OR
SOIL CONSERVATION SERVICE. RIP RAP SHALL BE PLACED IN AREAS OF HIGH
VELOCITY STREAM FLOW (MINIMUM SIZE 1/3 CU.FT.). PAYMENT FOR ADDITIONAL
STRAW BALES AND RIP RAP NOT SHOWN ON PLANS AND SEEDING SHALL BE ON A UNIT
BASIS.
5. CONTRACTOR SHALL INSTALL ALL STORM SEWER INLET FILTERS AS STORM SEWER
SYSTEM IS INSTALLED.
6. ALL PROPOSED STREET AREAS TO BE PAVED AS SOON AS POSSIBLE AFTER SUBGRADE
IS PREPARED.
7. CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROLS ONLY
WHEN THERE IS A SUFFICIENT GROWTH OF GROUND COVER TO PREVENT FURTHER
EROSION.
8. ALL SWALES SHALL BE SEEDED IMMEDIATELY AFTER FINAL GRADING.
SEEDING SPECIFICATIONS
1. SWALES /GRASSED WATERWAYS: PERMANENT SEEDING SHALL TAKE PLACE BETWEEN
MARCH 1 AND MAY 15 OR FROM AUGUST 10 TO OCTOBER 15 WITH THE FOLLOWING
PER ACRE:
25 LBS. KENTUCKY 31 FESQUE
15 LBS. KENTUCKY BLUE GRASS
1000 LBS. 12 -12 -12 FERTILIZER
3000 LBS. MULCH (STRAW)
2. IF GRADES ARE ESTABLISHED BETWEEN MAY 15 AND AUGUST 10, A TEMPORARY
SEEDING CONSISTING OF 40 LBS. OF ANNUAL RYEGRASS SHALL BE PLANTED
PER ACRE.
3. IF GRADES ARE ESTABLISHED BETWEEN OCTOBER 15 AND DECEMBER 30, EITHER RYE
(GRAIN) OR WHEAT MAY BE USED AT THE RATE OF 2 BUSHELS /AC. OATS MAY BE
USED FOR EARLY SPRING PLANTING AT THE RATE OF 3 BUSHELS /AC. ALL GRAINS
SHOULD BE CUT AT TIME OF PERMANENT SEEDING_ ALL GRAINS SHOULD BE CUT
PRIOR SEED MATURING.
4. IF TEMPORARY SEEDING IS ESTABLISHED PRIOR TO PERMANENT SEEDING, THE MULCH
MAY BE ELIMINATED EXCEPT IN "BARE" AREAS.
5. IF GRADING OCCURS DURING DECEMBER, JANUARY OR FEBRUARY, NO SEEDING TO
TAKE PLACE TILL SPRING PLANTING; HOWEVER, IT IS IMPERATIVE THAT ALL
SEDIMENT FILTERS AND TRAPS ARE IN PLACE PRIOR TO BULK EARTH MOVING OR
CLEARING.
EROSION PROTECTION DURING CONSTRUCTION AND SEEDING
1. THE CONTRACTOR SHALL PROVIDE ADEQUATE EROSION PROTECTION MEASURE DURING
CONSTRUCTION SUCH AS, BUT NOT LIMITED TO:
A.
B.
C.
D.
E.
F.
G.
SILTATION BASINS
SILT TRAPS
STRAW BALE DAMS
SOIL CEMENT
MULCH AND SEEDING
SOIL STABILIZATION FABRIC
JUTE NETTING
2. DETAILS AND PLACEMENT SPECIFICATION FOR THE ABOVE ITEMS ARE AVAILABLE ON
REQUEST FROM THE ENGINEER.
3. ALL CONSTRUCTION AREAS ARE TO BE SEEDED IMMEDIATELY FOLLOWING GRADING.
4. SWALE AND LAKE SLOPE SEEDING: SEED AND FERTILIZE WITHIN CONSTRUCTION
LIMITS IMMEDIATELY AFTER CONSTRUCTION WITH 5# /ACRE "RED TOP" GRASS, 20
ACRE "RYE GRASS 20# /ACRE "BLUE GRASS 25# /ACRE "TALL FESCUE" GRASS AND
600# /ACRE 12/12/12 FERTILIZER. CUT AND FILL SEEDING ALONG STREETS:
25# /ACRE "TALL FESCUE" GRASS, 20# /ACRE "RYE GRASS 15# /ACRE "BLUE GRASS"
AND 600# /ACRE 12/12/12 FERTILIZER. (APPROXIMATELY 25 FEET BEHIND CURB FOR
SEEDING ALONG STREET). PAD AND PARKING AREAS SHALL BE SEEDED WITH
40# /ACRE OF ANNUAL RYE GRASS.
5. WOOD CELLULOSE FIBER, STRAW OR MULCH SHALL BE APPLIED AT A RATE OF 3/4
TONS PER ACRE AND SHALL BE REQUIRED FOR ALL SWALE, LAKE SLOPE AND STREET
SEEDING.
6. STONE RIP RAP (MINIMUM 1/3 CUBIC FOOT) IS TO BE UTILIZED IN AREAS OF HIGH
VELOCITY STREAM FLOW.
PARKING LOT STRIPING
PAINT MATERIAL SHALL COMPLY WITH FEDERAL SPECIFICATION TT- P -115A FOR
TRAFFIC PAINT WITHOUT GLASS SPHERES. (COLOR BY OWNER SELECTION).
2. STRIPE PARKING LINES AS SHOWN ON DRAWINGS WITH STRIPING PAINT.
SUBCONTRACTOR TO PERFORM ALL FIELD LAYOUT WORK NECESSARY TO ACHIEVE
STRAIGHT AND TRUE LINES. ASPHALT MUST BE CLEANED WITH POWER BROOM AND
HAND BROOM TO REMOVE ALL LOOSE MATERIAL BEFORE STRIPING. THE
SUBCONTRACTOR TO PROVIDE BARRIERS TO PREVENT MARRING OF LINES BY VEHICLES
UNTIL PAINT HAS DRIED. STRIPING PAINT SHALL BE APPLIED AT THE MINIMUM
RATE OF ONE GALLON PER 100 SQUARE FEET OF PAINT (BASED ON 39% SOLIDS) AT A
WIDTH OF FOUR INCHES.
C3)
C
m C U
O c
CU CO
CO o
C.7_i O
a)
Cl)
•L
(3)
4-0 w
co
O O
c°
as as
O
CL aD a
cM-�
N
C.0 d'
Z
E
O
U
O)
C
a)
C
C
a)
0)
U)
C