Loading...
HomeMy WebLinkAbout13 C406 Traffic Maintenance PlanC D 500' ONE "FLAGMAN AHEAD" SIGN REQUIRED ONE "ROAD CONSTRUCTION AHEAD" SIGN REQUIRED END CONSTRUCTION ROAD CONSTRUCTION NEXT MILES XG20 —I 60 "x36" 500' O G FLAGMAN XW20 —I XW20 -4 48 "x48" 48 "x48" 205' 141ST STREET XW20 -7 48 "x48" 18 TYPE II BARRICADES w/ "STEADY BURNING LIGHTS" 25' O —C= 425' XW20 -4 48 "x48" XW20 —I 48 "x48" G DETAIL IS NOT TO SCALE r-- XW20 -7 XW20 -4 XW20 —I 48 "x48" 48 "x48" 48 "x48" TYPICAL APPLICATIONS OF TRAFFIC CONTROL DEVICES FOR ONE -WAY TRAFFIC WITH FLAGGER CONTROL 205' FLAGMAN O ROAD CONSTRUCTION NEXT MILES XG20 -1 60%3 9" 500' ONE "FLAGMAN AHEAD" ONE "ROAD CONSTRUCTION AHEAD" SIGN REQUIRED 500' D C SIGN REQUIRED NOTE: 1. EXISTING TRAVEL LANE PAVEMENT ALONG HAZEL DELL PARKWAY MUST BE PROTECTED DURING CONSTRUCION OF THE ENTRANCE. PROTECTION METHODS TO BE COORDINAGED WITH THE CITY OF CARMEL DEPARTMENT OF ENGINEERING. 2. CONSTRUCTION METHODS SHALL MINIMIZE TREE REMOVAL WITHIN THE RIGHT OF WAY OF HAZEL DELL PARKWAY. 3. DEMOLITION, RELOCATION AND REINSTALLATION TO EXISTING ASPHALT PATH SHALL BE COORDINATED IN A MANNER TO MINIMIZE NO— ACCESSIBILITY TO THE PUBLIC FOR A TIME PERIOD OF TWO WEEKS, WEATHER PERMITTING. 4. A "PATH CLOSED" SIGN OR EQUIVALENT SHALL BE PLACED ON THE EXISTING PATH AT THE FOLLOWING LOCATIONS: NE CORNER OF CHERRY TREE AND HAZEL DELL PARKWAY (PATH CLOSED AHEAD). SOUTH LIMITS OF CONSTRUCTION NORTH LIMITS OF CONSTRUCTION SE CORNER OF 146TH STREET 146TH STREET AND HAZEL DELL PARKWAY (PATH CLOSED AHEAD). 5. AT NO TIME SHALL VEHICLES BE PARKED WITHIN THE HAZEL DELL PARKWAY RIGHT —OF —WAY. MOTOR VEHICLES ARE PROHIBITED FROM DRIVING OR PARKING ON THE ASPHALT PATH. 1 0 FLAGMAN A FLAGMAN AHEAD SIGN DRUMS FORMS /TRAFFIC LEGEND ROAD CONSTRUCTION AHEAD SIGN /END CONSTRUCTION SIGN GENERAL NOTES SCALE: 1"= 100' See Standard Detour Signs sheet 2 —A for vertical and horizontal clearances to Construction Signs, spacing of channelizing devices and details of barricades, cones, drums, markers and Typical Sign Standard. 2) Construction Warning Lights shall be required in accordance with the Standard Specifications. 3) Additional signs and barricades shall be required as directed. 4) Spacing of drums and Barricades Type I and II at this location shall be 10 feet for a 50 foot taper or 20 feet for a 100 foot taper. 5) For temporary lane closures during daylight hours, cones or tubular markers may be used in lieu of drums or Barricades Type I and II. 6) For un— numbered routes, street signs or county road signs shall be used in lieu of the route marker in the Detour Route Marker Assembly. 7) Advance Turn Detour Route Marker Assemblies shall be located as shown, or after the last cross street prior to the beginning of the detour, as directed. 8) Directional Detour Route Marker Assemblies shall be located 10 to 20 feet in advance of all required turns within the detour limits. 9) Confirming Detour Route Marker Assemblies shall be spaced at a maximum of mile, and shall also be located 50 to 100 feet past all major intersections, as directed. Confirming Detour Route Marker Assemblies shall be placed after a required turn when directed. 10) End Detour Route Marker Assemblies shall be located at the point at which traffic is returned to the original route. The Advance Turn Marker (MS -1) shall be included in the assembly when traffic is required to turn to access the original route. 0 I Q m 0 m LLI z CL 0 Z Z W F-- Z S 0 J N II JOB No•45370EQU m 0 F- o 0 N. N) z 0 z z z 0 z C� J H W I HEET NO. 406 z 0 z U 500' 1000' 500' 500' 500' 50' TO 100' 300' WORK AREA 100` 50' TO 100 500' 500' 500' 500' 500' 500' 50' TO 100' 300' WORK AREA 100' 50' TO 100' 500' 500' 500' 1000' 500' C D 500' ONE "FLAGMAN AHEAD" SIGN REQUIRED ONE "ROAD CONSTRUCTION AHEAD" SIGN REQUIRED END CONSTRUCTION ROAD CONSTRUCTION NEXT MILES XG20 —I 60 "x36" 500' O G FLAGMAN XW20 —I XW20 -4 48 "x48" 48 "x48" 205' 141ST STREET XW20 -7 48 "x48" 18 TYPE II BARRICADES w/ "STEADY BURNING LIGHTS" 25' O —C= 425' XW20 -4 48 "x48" XW20 —I 48 "x48" G DETAIL IS NOT TO SCALE r-- XW20 -7 XW20 -4 XW20 —I 48 "x48" 48 "x48" 48 "x48" TYPICAL APPLICATIONS OF TRAFFIC CONTROL DEVICES FOR ONE -WAY TRAFFIC WITH FLAGGER CONTROL 205' FLAGMAN O ROAD CONSTRUCTION NEXT MILES XG20 -1 60%3 9" 500' ONE "FLAGMAN AHEAD" ONE "ROAD CONSTRUCTION AHEAD" SIGN REQUIRED 500' D C SIGN REQUIRED NOTE: 1. EXISTING TRAVEL LANE PAVEMENT ALONG HAZEL DELL PARKWAY MUST BE PROTECTED DURING CONSTRUCION OF THE ENTRANCE. PROTECTION METHODS TO BE COORDINAGED WITH THE CITY OF CARMEL DEPARTMENT OF ENGINEERING. 2. CONSTRUCTION METHODS SHALL MINIMIZE TREE REMOVAL WITHIN THE RIGHT OF WAY OF HAZEL DELL PARKWAY. 3. DEMOLITION, RELOCATION AND REINSTALLATION TO EXISTING ASPHALT PATH SHALL BE COORDINATED IN A MANNER TO MINIMIZE NO— ACCESSIBILITY TO THE PUBLIC FOR A TIME PERIOD OF TWO WEEKS, WEATHER PERMITTING. 4. A "PATH CLOSED" SIGN OR EQUIVALENT SHALL BE PLACED ON THE EXISTING PATH AT THE FOLLOWING LOCATIONS: NE CORNER OF CHERRY TREE AND HAZEL DELL PARKWAY (PATH CLOSED AHEAD). SOUTH LIMITS OF CONSTRUCTION NORTH LIMITS OF CONSTRUCTION SE CORNER OF 146TH STREET 146TH STREET AND HAZEL DELL PARKWAY (PATH CLOSED AHEAD). 5. AT NO TIME SHALL VEHICLES BE PARKED WITHIN THE HAZEL DELL PARKWAY RIGHT —OF —WAY. MOTOR VEHICLES ARE PROHIBITED FROM DRIVING OR PARKING ON THE ASPHALT PATH. 1 0 FLAGMAN A FLAGMAN AHEAD SIGN DRUMS FORMS /TRAFFIC LEGEND ROAD CONSTRUCTION AHEAD SIGN /END CONSTRUCTION SIGN GENERAL NOTES SCALE: 1"= 100' See Standard Detour Signs sheet 2 —A for vertical and horizontal clearances to Construction Signs, spacing of channelizing devices and details of barricades, cones, drums, markers and Typical Sign Standard. 2) Construction Warning Lights shall be required in accordance with the Standard Specifications. 3) Additional signs and barricades shall be required as directed. 4) Spacing of drums and Barricades Type I and II at this location shall be 10 feet for a 50 foot taper or 20 feet for a 100 foot taper. 5) For temporary lane closures during daylight hours, cones or tubular markers may be used in lieu of drums or Barricades Type I and II. 6) For un— numbered routes, street signs or county road signs shall be used in lieu of the route marker in the Detour Route Marker Assembly. 7) Advance Turn Detour Route Marker Assemblies shall be located as shown, or after the last cross street prior to the beginning of the detour, as directed. 8) Directional Detour Route Marker Assemblies shall be located 10 to 20 feet in advance of all required turns within the detour limits. 9) Confirming Detour Route Marker Assemblies shall be spaced at a maximum of mile, and shall also be located 50 to 100 feet past all major intersections, as directed. Confirming Detour Route Marker Assemblies shall be placed after a required turn when directed. 10) End Detour Route Marker Assemblies shall be located at the point at which traffic is returned to the original route. The Advance Turn Marker (MS -1) shall be included in the assembly when traffic is required to turn to access the original route. 0 I Q m 0 m LLI z CL 0 Z Z W F-- Z S 0 J N II JOB No•45370EQU m 0 F- o 0 N. N) z 0 z z z 0 z C� J H W I HEET NO. 406 z 0 z U