HomeMy WebLinkAboutC300 Storm Water Pollution & Prevention DetailsTHIS SHEET TO BE USED FOR EROSION CONTROL ONLY. PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL: STEVE COOK TRINITY HOMES, L.L.C. Phone: (317)- 574 -7600 NOTE: ANY ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. NOTE: IF SITE REMAINS INACTIVE FOR A PERIOD OF 2 WEEKS, THEN STABILIZATION IS REQUIRED TO TAKE PLACE IN THE FORM OF TEMPORARY SEEDING, MULCH, OR SPRAY ON PALIMAR. Seedbed Preparation for Permanent Seeding 1. Test soil to determine pH and nutrient levels. (Contact you county SWCD or Cooperative Extension office for assistance and soils information, including available testing services.) 2. I so P If it H is unsuitable for P the species to be seeded, recommendations. to tes d apply lime according P PY 3. Fertilize as recommended by the soil test. If testing I acre of r 16n bs was not done consider applying Y 9 400 600 12 -12 -12 analysis, or equivalent, fertilizer. 4. Till the soil to obtain a uniform seedbed, working the fertilizer and lime into the soil 2 -4 in. deep with a disk or rake operated across the slope. The following is a list in sequence of construction activities to control soil erosion: 1. The contractor shall schedule a Pre construction meeting with the Hamilton County Soil and Water Conservation District prior to any construction on the site 9 bein started. 2 The construction entrance installed. 3 Perimeter Silt fencing f ncin to be installed. 4. Maintenance and 9 n Refueling area constructed 5. Concrete washout area constructed 6. Posting information area shall be constructed. All items, as outlined in the in the 0 &M manual for Post Constuction water quality measures shall be placed in this area. 7. Lake #3 to be constructed at this time. Install blankets and seeding immediately after lake is constructed. 8. Grade the site (sides of swales, mounds and ponds to be seeded and mulched immediately upon completion. If the site remains inactive for a period of 15 days ibilization is required to take place in the form of temporary seeding, mulch or spray on palimar. For temporary seeding, the contractor shall utilize a fast growing seed of either oats, annual ryegrass, wheat or rye depending on time of yea r. D isturbed areas should be kept to a minimum at all times. 9. Storm inlets are to be protected immediately after installation. on all r hall control mud accumulation 1 Cont actor s 0. streets surrounding stone project b installing g P J Y r surface at all locations where construction traffic leaves the site. Dust shall be kept to a minimum by utilizing sprinkling, Vegetative Chloride, g, g cover, spray on adhesives or other approved methods. 11. Maintain all filters and traps during construction to prevent any blockages from accumulated n raw bales may seeding straw sediment. Additional s 9 a Y be required during construction as specified by i Engineer or Soil and Water Conservation District. I I Craw bales s hall be at the Payment ent for additional s contractors expense. Payment for additional rip -rap (not shown on plans) and seeding shall be paid for on a unit basis. 12, Contractor shall install all sanitary sewers, storm sewers, subsurface drains, and water mains. Straw bale filters shall be installed at all storm inlets (including street inlets). 13. Seed all remaining disturbed areas and remove all BMP's when area is stabilized. fl-�ll "I =11 �.11$i`li 61 1i =11 �'llr II: II� -il. =11 =t .•1: 11��i ,i i1: 11:� 1 11 �II' 1E. =11= III! IIl I =i.= e II.�II. 1=11= ll 1[�li.•: I 1111 I ll:� l II' I:� 11=y11 I' =11p1. 4II4f IIr-11 JLiF r i =11'�i IIll I l a l ==11- wail.= ���i' lim[I�l[ =ii::f III -1t =i 1= (E�•�ii�ll�ll. =�ir =l1= II: a� -�agte �'[1�11 l ,ll�ll. Il�li Ir 1 1 1[` Il =11= 1Il. li it =II 1[..11. :loll` 1111: i1=11 n =11=1: V _q �0 .(L .il. �11=11- I�[A�II II�11 =1 ll .11. r=ill I I1 =11 iL• -11. 11 llilp al.= 1f� 1� 11�11e it -uil =1 �ll�ll -;11' 1== 11=°11.= I II llli�--1 �E I. II: =l1. llil. ,le= -ilr= -11= J II llr:ll. ,Il, .il; l..II it II:- II�II..II .IC IJ•=1 t 1t. t II 1 t t t t t• t t/ ,�ola� IIn71 T 4:: I I- .11:•.11• 1 -1+ I I..II. II =1 t.. t I-il ,II 14 1�-4- II -III 1. =1i�: ''a 1= aa1(' ;.I. 4. -11- t t t t t t t t [L I li II ll !I il• .II. 11. (1 I i: m- +.::...,F +.....f... 4...._..t 4 t r 4 i 4 4 4 4 4 4.': 4 14 4 4 t 4 +H t+ 4. t t ...4 11,=11 Ll li�-1['�I! 1 X11= 11 =i,.. t ':4 4 4 ,4. :i t 4 4 i; 4 t 4 4 4 4 4 4 4... ..4......4, t 2 YEAR ELEV.= 10 YEAR ELEV.= 100 YEAR ELEV.= BOTTOM ELEV.= t 4'' ::4 t II li l e' t t t 4 t 4 t t t t t t 4 t ak t t 4 i> 4 t 4 ••+4. ,;4 t t +l- 4 4 4 4 4 4 4 ..4 4 4..... '4 4 4l .4 4 i::•' 4 :4 4 4 f... 4 4.4 t t 4 '4. 4. 4 ..4 t 4.4 t t k t i t •4 t': t t t t it -I. 4 4 t t t 4+ t t: �k f .4 t 4. .4.> +i 4 t 4 +i t 4. i+ t t i i t t t t t t 4'`�:: t '+'i• i 4 4 k 4 4 i 4 i'. t t 4 4 t i v I..I1..11. _IL .1111 -1[ -11 II..II..II�IE�II'= 11 ®11: =1(' 11= 1( .1(. •11' ,11. J!�(I. 11 .1. i r• (1 °9 I.. Ii. �ll.� °I!°°°°(i:°°� #i. !i 11. it 11. ii..!!. lip-: il- li- ii�ll- •�It- �II.�[I..!I -II. i! 1- I .11�11. aI1 =1= 111!`- (1- •II11. -[I- 1.- 11= ii =i1= L. 4 4' 44 F .4 t 4 ..4 t t' 1 t f 47///+ 4 t k: .4 p. 4 4 4' /fir /t`r/ 4 t i t 4 4 4 4 is 4 t t 4 4 ..t......+. +.....4..._ t 4.....4.:_:- 4- 4. 4•,•••4,... -.4 4 4 4 t t .4-.: f t t 4. t: 4 t 4 i 4 4 4 t t. t 4 4 t: t 4 4 4 t tj t [1 =I[.= ill ll�= •�°II al :.1 �.I 1. =i =1 ='I[ =71 -1 11 11 I( 1[ 11 -11 11.= 11= IE- IE�Ii°®il. IE= 11.:1- .11. I 1. -,ems r,,: m.a E..li _::1tls r 1 '..4 4 4: 74 4 4 :4 t t 4 4 7 .4 4: 4 4 4:: ,/i� 4 4 t t 4 .4 •CIE 4 III: 4/ t 4 t .'7//+ i•. 4: t 'l- 4 ..4 f �.:....4 :..4. 4 t V 2+ 4- 4- 1- -4 1 444 ....1 4:..:.. t 4 1 f RH3RK CCNTRACTOIe. SPIALt TFNS AREA +CNEY +OQ JIPMD4T it ARE 'In eE EX. :..:LAKE 2 N.P.= 2 YEAR ELEV. 10 YEAR ELEV:= 100 YEAR ELEV, BOTTOM ELEV•`:: 1STIN TI PORT -o-LET 8 roN T AREA EARTHMIORK CONTRACTOR SHALL INSTALL 36'x150' MIN. STONE ACCESS DIE PRIOR TO CONSTRUCTION. O Denotes Construction Limits U Denotes Silt Fence Temporary "Drop Inlet Protection Basket" or Coconut Fiber Erosion Control Logs Denotes permanent seeding mulch areas Seeding rate: 130 acr e or 3 S.F. 000 Seeding mixture: mixt e creeping 25% cree in red fescue 35% perennial rye 40% Kentucky bluegrass Denotes seeding w /fiber blanket #5150 by North Seeding rate: IIO# /acre or 2.5 /l000 S.F. Seeding mixture: 38% Kentucky 31 fescue 19% perennial rye 19% annual rye 14% orchard grass 10% Kentucky bluegrass Denotes temporary seeding mulching. Seeding rate: 50# /acre Seeding mixture: 100% perennial rye. A9. Specific Points e D ec c P o s Where Storm at r Discharge P ischar a Will Leave this Site: ttII h u h STOEPp,. No. -G\ STATE OF �v American Green 19358 m Q DJ m LU 0 Lv Q Lt JOB N O. 42480 Q m SHEET NO. m Y Q W F- 4: 0 Q z Q 0 z C300 Q z Q 0 z