Loading...
HomeMy WebLinkAboutC301 Storm Water Pollution & Prevention DetailsEROSION CONTROL MEASURE INSTALLATION SEQUENCE MAINTENANCE STONE ENTRANCE PRIOR TO CLEANING AND GRADING INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. TOPDRESS WITH CLEAN STONE AS NEEDED. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. SILT FENCE PRIOR TO CLEANING AND GRADING INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. TOPSOIL STOCKPILE PRIOR TO CLEANING AND GRADING DETERMINE DEPTH AND SUITABILITY OF TOPSOIL AT THE SITE. (FOR HELP, CONTACT YOUR LOCAL SWCD OFFICE TO OBTAIN A COUNTY SOIL SURVEY REPORT OR CONSULT WITH A SOIL SCIENTIST.) PRIOR TO STRIPPING TOPSOIL, INSTALL ANY SITE SPECIFIC DOWNSLOPE PRACTICES NEEDED TO CONTROL RUNOFF AND SEDIMENTATION. REMOVE THE SOIL MATERIAL NO DEEPER THAN WHAT THE COUNTY SOIL SURVEY DESCRIBES AS "SURFACE SOIL" (I.E., A OR AP HORIZON). STOCKPILE THE MATERIAL IN ACCESSIBLE LOCATIONS THAT NEITHER INTERFERE WITH OTHER CONSTRUCTION ACTIVITIES NOR BLOCK NATURAL DRAINAGE; AND INSTALL SILT FENCES, STRAW BALES, OR OTHER BARRIERS TO TRAP SEDIMENT (SEE EXHIBIT 3.02 -B). (SEVERAL SMALL PILES AROUND THE CONSTRUCTION SITE ARE USUALLY MORE EFFICIENT AND EASIER TO CONTAIN THAN ONE LARGE PILE.) IF SOIL IS STOCKPILED FOR MORE THAN 6 MO., IT SHOULD BE TEMPORARILY SEEDED OR COVERED WITH A TARP OR SURROUNDED BY A SEDIMENT BARRIER. TEMPORARY DIVERSIONS AFTER ROUGH GRADING INSPECT WEEKLY AND FOLLOWING EACH STORM EVENT. REMOVE SEDIMENT FROM THE CHANNEL AND REINFORCE THE RIDGE AS NEEDED. CHECK THE OUTLETS AND MAKE NECESSARY REPAIRS IMMEDIATELY. REMOVE SEDIMENT FROM TRAPS WHEN THEY ARE 50% FULL. WHEN THE WORK AREA HAS BEEN STABILIZED, REMOVE THE RIDGE, FILL THE CHANNEL TO BLEND WITH THE NATURAL GROUND, REMOVE TEMPORARY SLOPE DRAINS, AND STABILIZE ALL DISTURBED AREAS. ROCK DAM AFTER ROUGH GRADING INSPECT THE ROCK DAM AND BASIN FOLLOWING EACH STORM EVENT. REMOVE SEDIMENT WHEN IT ACCUMULATES TO HALF THE DESIGN VOLUME (MARKED BY STAKE) CHECK THE DAM AND ABUTMENTS FOR EROSION, PIPING, AND ROCK DISPLACEMENT, AND REPAIR IMMEDIATELY IF THE BASIN DOES NOT DRAIN BETWEEN STORMS, REPLACE THE STONE ON THE UPSTREAM FACE OF DAM IF THE BASIN DRAINS TO RAPIDLY FOLLOWING A STORM,(LESS THAN 6 HRS.), ADD INDOT CA NO. 5 GRAVEL ON THE UPSTREAM FACE OF THE DAM. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN PERMANENTLY STABILIZED, a. REMOVE WATER AND SEDIMENT FROM THE BASIN. b. REMOVE THE DAM, DISPOSING OF THE ROCK IN DESIGNATED DISPOSAL AREAS. c. SMOOTH THE SITE TO BLEND THE SURROUNDING AREA. d. STABILIZE TEMPORARY SEEDING AFTER ROUGH GRADING INSPECT PERIODICALLY AFTER PLANTING TO SEE THAT VEGETATIVE STANDS ARE ADEQUATELY ESTABLISHED; RE- SEED IF NECESSARY. CHECK FOR EROSION DAMAGE AFTER STORM EVENTS AND REPAIR; RESEED AND MULCH IF NECESSARY. TOPDRESS FALL SEEDED WHEAT OR RYE SEEDINGS WITH 50 LBS. /ACRE OF NITROGEN IN FEBRUARY OR MARCH IF NITROGEN DEFICIENCY IS APPARENT. (EXHIBIT 3.11 -B SHOWS ONLY WHEAT /RYE FALL SEEDED.) PERMANENT SEEDING AFTER FINISH GRADING INSPECT PERIODICALLY, ESPECIALLY STORM EVENTS, UNTIL THE STAND IS SUCCESSFULLY ESTABLISHED. (CHARACTERISTICS OF A SUCCESSFUL STAND INCLUDE: VIGOROUS DARK GREEN OR BLUISH -GREEN SEEDLINGS; UNIFORM DENSITY WITH NURSE PLANTS, LEGUMES, AND GRASSES WELL INTERMIXED; GREEN LEAVES; AND THE PERENNIALS REMAINING GREEN THROUGHOUT THE SUMMER, AT LEAST AT THE PLANT BASE.) PLAN TO ADD FERTILIZER THE FOLLOWING SEASON ACCORDING TO SOIL TEST RECOMMENDATIONS. REPAIR DAMAGED, BARE, OR SPARSE OR PATCHY, BY FILLING ANY GULLIES, RE- FERTILIZING, OVER OR RE- SEEDING AND MULCHING AFTER RE- PREPARING THE SEEDBED. IF VEGETATION FAILS TO GROW, CONSIDER SOIL TESTING TO DETERMINE ACIDITY OR NUTRIENT DEFICIENCY PROBLEMS. (CONTACT YOUR SWCD OR COOPERATIVE EXTENSION OFFICE FOR ASSISTANCE.) IF ADDITIONAL FERTILIZATION IS NEEDED TO GET A SATISFACTORY STAND, DO SO ACCORDING TO SOIL TEST RECOMMENDATIONS. EROSION CONTROL MATTING AFTER FINISH GRADING DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. STRAW BALES AFTER FINISH GRADING INSPECT THE DROP INLET PROTECTION AFTER EACH STORM EVENT, AND MAKE NEEDED REPAIRS IMMEDIATELY. REMOVE SEDIMENT FROM THE POOL AREA TO ENSURE ADEQUATE RUNOFF STORAGE FOR THE NEXT RAIN, TAKING CARE TO NOT DAMAGE OR UNDERCUT THE BALES. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL BALES, CONSTRUCTION MATERIAL, AND SEDIMENT AND DISPOSE OF PROPERLY, GRADE THE DISTURBED AREA TO THE ELEVATION OF THE TOP OF THE INLET AND STABILIZE. INLET PROTECTION AFTER EACH INLET IN PLACED INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR IF NEEDED. INSPECT AFTER EACH STORM EVENT. REMOVE SEDIMENT (BUT NOT BY FLUSHING) WHEN IT REACHES HALF THE HEIGHT OF THE BARRIER. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS. REMOVAL OF STRAW BALES AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED N/A REMOVAL OF INLET PROTECTION AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED N/A REMOVAL OF SILT FENCE AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED N/A THIS SHEET TO BE USED FOR EROSION CONTROL ONLY. STABILIZATION PRACTICE PERMANENT SEEDING DORMANT SEEDING SEEDING SODDING MULCHING G B F Seedbed Preparation for Permanent Seeding 1. Test soil to determine pH and nutrient levels. (Contact you county SWCD or Cooperative Extension office for assistance and soils information, including available testing services.) 2. If soil pH is unsuitable for the species to be seeded, apply lime according to test recommendations. 3. Fertilize as recommended by the soil test. If testing was not done, consider applying 400 -600 lbs. /acre of 12 -12 -12 analysis, or equivalent, fertilizer. 4. Till the soil to obtain a uniform seedbed, working the fertilizer and lime into the soil 2 -4 in. deep with a disk or rake operated across the slope. A KENTUCKY BLUE GRASS 40 lbs. /AC.: CREEPING RED FESCUE 40 lbs. /AC.: PLUS 2 TONS STRAW MULCH /AC. OR ADD ANNUAL RYEGRASS 20Ibs> /AC. B KENTUCKY BLUE GRASS 60 lbs. /AC.: CREEPING RED FESCUE 60 lbs. /AC.: PLUS 2 TONS STRAW MULCH /AC. OR ADD ANNUAL RYEGRASS 30Ibs /AC. C SPRING OATS 3 BUSHEL /ACRE D WHEAT OR RYE 2 BUSHEL /ACRE E ANNUAL RYEGRASS 40 lbs. /AC. (1 lb. /1000 sq. ft.) F SOD G STRAW MULCH 2 TONS /ACRE ANCHOR ALL MULCH BY CRIMPING OR TACK IFYING IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPT. IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD Rule 5 requires all disturbed areas likely to be idle for 15 day shall have surface stabilization applied. When weather conditions prevent rapid germination of grass, then 2t /ac mulch will be used to ensure ground stabilization requirements are met. Drop Inlet Protection Basket It is the intent of this device to detain water for the purpose of allowing suspended solids in the water to settle out before the water enters the storm structure. Some filtering will occur as water passes through the device. The bottom of this device is to seal against the flat outer part of the casting. The overall dimension of the basket shall be no smaller than the water inlet perforations in the casting and no larger than the outer dimensions of the casting. The height shall be 15" The basket frame shall be welded wire mesh rolled or bent and welded to itself to fit the ca'.ting. The wire size shall be no smaller than .149" dia. and openings no larger than 18 sq in. It is important that the bottom of the wire frame be smooth so as not to allow any leakage between the basket and casting. The top of the basket shall be open to prevent flooding during heavy storm events. Fabric shall be woven polypropylene allowing 15- 25gallmin /sq in. If non -woven fabric is used, the maintenance intervals should be increased to replace silt laden fabric. The fabric shall be attached to the frame and folded under the bottom to help seal against the casting. This device should be used in conjunction with other Best Management Practices to maximize the efficiency of the erosion control plan. Suppliers for this product include: Lakeside Supply Inc. (317) 281 -2661, Turfgrass Inc (317) 894 -3276. 3' JAN. FEB. MAR. APR. MAY JUN. JUL. AUG. SEPT. OCT. NOV. DEC. FENCE POST (2x2 HARDWOOD POST) SILT FENCE MATERIAL FENCE POST SHOULD SILT FENCE MATERIAL SHOULD BE BURIED ti 1' BELOW BE BURIED 6" BELOW GROUND GROUND SURF SURFACE. SEASONAL SOIL PROTECTION CHART Physical prnptrty 20% elongation:. Standard strength Extra strength Slurry flow mite Water flow rate j re i i4titlnce A E *2 SILT FENCE DETAIL NOT -TO -SCALE Exhibit 3,74 -C. Specifications Minimums for Silt Fence Fat c. Woven fabric Nun-woven fabric Filtering r..,f icienoy 85% 85% Tensile strength at 3(1 It /linear in. 50 IhS. /linutt i1?a. 0.3 gal. /rain. /s1.ft. 15 gtil, /!hill, /a}.t,ft., 70% 6' 8 GROUND SURFACE 50 1175. f lino:lr in. 70 lbs, /linear in. 4.5 gal. /min. /sq ft. no gal /IStin /sq>fL S5% B Al. A2. A3. 1 STAPLE PER SQ. YD. A6. See Sheet C200. A22. See Sheet C100 300 275 250 225 200 175 150 125 100 75 50 25 FT. Assessment of Construction Plan Elements See Sheets C390 See Attachment. B A C B A C B C B C D STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN EROSION CONTROL BLANKETS. STAPLE PATTERNS WILL VARY DEPENDING UPON SLOPE LENGTH, SLOPE GRADE, SOIL TYPE AND AVERAGE ANNUAL RAINFALL. 4:1 A7. Hydrologic Unit Code: A23. See Sheet C200 thru C202 3` 3:1 1 -1/2 STAPLES PER SQ. YD. A4. See map included on this sheet. 2:1 SLOPE GRADIENT 1:1 4' THE RIDGE AT HAYDEN RUN SECTION THREE A8. State or Federal Water Quality Permits: None A15. Adjacent Land use Including Upstream Watershed: West: agricultural East: residential North: residential South: residential A16. See Sheets C200 thru C202 A17. Identification of existing vegetative cover: This site is enitrely covered by crop residue. A18. See Map descriptions included on this sheet. A19. See Sheets C200 thru C202 A20. See Sheets C500 -0501 and C700 LOW MED /HIGH FLOW FLOW CHANNEL CHANNEL AND SHORELINE 2' 2 STAPLES PER SQ. YD. EROSION CONTROL BLANKET STAPLE PATTERN GUIDE NOT -TO -SCALE I, the undersigned Registered Land Surveyor hereby certify that the included plat correctly represents a subdivision of part of the Southwest Quarter of Section 20, Township 18 North, Range 3 East, Hamilton County, Indiana, more particularly described as follows: Beginning at the Southeast Corner of the said Quarter Section; thence South 89 degrees 40 minutes 15 seconds West along the South line of the said Quarter Section 1,323.77 feet; thence North 00 degrees 05 minutes 53 seconds East 1,19537 feet to the Southwest corner of The Ridge at Hayden Run Section Two, recorded as Instrument #200400029937 in Plat Cabinet #3 on Slide #394 in the Office of the Recorder of Hamilton Coutny, Indiana; the following eleven (11) courses being on and along the Southern Boundary of The Ridge of Hayden Run Section Two; 1) South 89 degrees 56 minutes 52 seconds East 159.62 feet to a point on a curve concave northeasterly, the radius point of said curve being North 72 degrees 24 minutes 59 seconds East 225.00 feet from said point; 2) southeasterly along said curve 182.91 feet to the point of tangency of said curve, said point being South 25 degrees 50 minutes 21 seconds West 225.00 feet from the radius point of said curve, said point also being the point of curvature of a curve concave southwesterly, the radius point of said curve being South 25 degrees 50 minutes 21 seconds West 20.00 feet from said point; 3) southeasterly along said curve 27.72 feet to the point of tangency of said curve, said point being South 74 degrees 44 minutes 41 seconds East 20.00 feet from the radius point of said curve; 4) South 74 degrees 44 minutes 41 seconds East 50.00 feet to a point on a curve concave southeasterly, the radius point of said curve being South 74 degrees 44 minutes 41 seconds East 20.00 feet from said point; 5) northeasterly along said curve 27.72 feet to the point of tangency of said curve, said point being North 04 degrees 40 minutes 17 seconds East 20.00 feet from the radius point of said curve, said point also being the point of curvature of a curve concave northerly, the radius point of said curve being North 04 degrees 40 minutes 17 seconds East 225.00 feet from said point; 6) easterly along said curve 32.47 feet to the point of tangency of said curve, said point being South 03 degrees 35 minutes 50 seconds East 225.00 feet from the radius point of said curve; 7) North 86 degrees 24 minutes 10 seconds Ease 35:'.16 feet to the point of curvature of a curve concave southwesterly, the radius point of said curve being South 03 degrees 35 minutes 50 sewn' .s East 20.00 feet from said point; 8) southeasterly along said curve 28.35 feet to the point of tangency of said curve, said point being North 77 degrees 37 minutes 43 seconds East 20.00 feet from the radius point of said curve; 9) North 77 degrees 37 minutes 43 seconds East 50.00 feet to a point on a curve concave easterly, the radius point of said curve being North 77 degrees 37 minutes 43 seconds East 225.00 feet from said point; 10) southerly along said curve 61.30 feet to the point of tangency of said curve, said point being South 62 degrees 01 minutes 09 seconds West 225.00 feet from the radius point of said curve;!!) North 61 degrees 37 minutes 34 seconds East 140.00 feet to a points on the Southern boundary of The Ridge at Hayden Run Section One recorded as Instrument #200300121756 in Plat Cabinet #3 on Slide #306 in the Office of the Recorder of Hamilton County, Indiana; the following two (2) courses being on and along the Southern Boundary of said The Ridge of Hayden Run Section One; 1) South 28 degrees 22 minutes 26 seconds East 270.00 feet; 2) South 89 degrees 34 minutes 15 seconds East 240.99 feet to a point on the East line of the said Southwest Quarter section; thence South 00 degrees 09 minutes 06 seconds West along the said East line 818.03 feet to the place of beginning. Containing 30.853 acres, more or less, subject to all legal highways, rights -of -ways, easements, and restrictions of record. Narrative Dt cribing Project Nature and Purpose: This project is The Ridge at Hayden Run Section 3, Residential subdivision. The purpose of this project is for future residential construction. A5. Legal Description of the Project Site: Legal description is shown on this sheet. The latitude is 39 58' -30" and longitude is 86 12' -30 A9. Specific Points Where Stormwater Discharge WM Leave This Site: The storm water will leave the site through the Lake outlet pipe and into existing lake. See sheets C200 for locations. A10. Location and Name of All Wetlands, Lakes, and Water Courses on And Adjacent to the Site: None All. Identity All Receiving Waters: This site outlets into an existing lake, which outlets to the Long Branch, Eagle Creek. Al2. Identification of Potential Discharges to Groundwater: Potential discharges into the groundwater may occur in Lakes. This should be addressed with clay bottoms to prevent pollutants from entering the groundwater. A13. 100 Year Floodplains, Floodways and Floodway Fringes: There are no floodplains,00dways or flood way fringes on this site. A14. Pre Construction and Post Construction Estimate of Peak Discharge: Pre Developed: 2 year N/A Post Developed: 2 year 9.08 cis. 100 year 20.80 c.fs. 10 year 17.18 c.fs. 3.5 STAPLES PER SQ. YD. A21. Locations of proposed soil stockpiles, borrow and/or disposal areas: All topsoil is to be relocated to non building areas. Non building areas would be considered common areas, rear yards, etc.. Their will be NO borrow areas associated with this project. 20' CONSTRUCTION SEQUENCE FOR BUILDING SITE EROSION CONTROL PRACTICES SUBSOIL PS STOCKPILE AREA TO BE TOP SOILED, SEEDED, AND MULCHED BY OWNER AT COMPLETION OF CONSTRUCTION. PALIMAR IS TO BE USED IF GRASS GROWTH IS NOT POSSIBLE. SIDE YARD DRAINAGE SWALE SIDE- WALK DROP INLET PROTECTION BASKET O O REAR YARD SWALE /DRAINAGE 0< 0 0 0< TOPSOIL HOUSE 1111111111111111•1111211111•111111111111111111,10111111111111/ w STREET CURB INLET PROTECTION GARAGE NOTES: 1. EROSION/ SEDIMENT CONTROL MEASURES MUST BE FUNCTIONAL AND BE MAINTAINED THROUGHOUT CONSTRUCTION. 2. MAINTAIN POSITIVE DRAINAGE AWAY FROM THE STRUCTURE. STOCKPILE EXISTING CURB AND GUTTER STORM WATER POLLUTION PREVENTION NOTES: (A) All storm water quality measures, including erosion and sediment control, necessary to comply with this rule must be implemented in accordance with the plan and sufficient to satisfy subsection (b). (B) Provisions for erosion and sediment control on individual building lots regulated under the original permit of a project site owner must include the following requirements: (1) The individual lot operator, whether owning the property or acting as the agent of the property owner, shall be responsible for erosion and sediment control requirements associated with activities on individual lots. (2) Installation and maintenance of a stable construction site access. (3) Installation and maintenance of appropriate perimeter erosion and sediment control measures prior to land disturbance. (4) Sediment discharge and tracking from each lot must be minimized throughout the land disturbing activities on the lot until permanent stabilization has been achieved. (5) Clean-up of sediment must be redistributed or disposed of in a manner that is in compliance with all applicable statutes and rules. (6) Adjacent lots disturbed by and individual lot operator must be repaired and stabilized with temporary or permanent surface stabilization. (7) For individual residential lots, final stabilization meeting the criteria in section 7(b)(20) or this rule will be achieved when the individual lot operator: (A) completes final stabilization; or (B) has installed appropriate erosion and sediment control measures for an individual lot prior to occupation of the home by the homeowner and has informed the homeowner of the requirement for, and benefits of, final stabilization. 7(b)(20) Final stabilization of a project site is achieved when: (A) all land disturbing activities have been completed and a uniform (for example, evenly distributed, without large bare areas) perennial vegetative cover with a density of seventy percent (70 has been established on all unpaved areas and areas not covered by permanent structures, or equivalent permanent stabilization measures have been employed; and (B) construction projects on land used for agricultural purposes are returned to its preconstruction agricultural use or disturbed areas, not previously used for agricultural production, such as filter strips and areas that are not being returned to their preconstruction agricultural use, meet the final stabilization requirements in clause (A). INDIVIDUAL LOT STORM WATER POLLUTION PREVENTION DETAIL NOT -TO -SCALE Assessment of Stormwater Pollution Prevention Plan Construction Component Bl. Description of Potential Pollutant Sources Associated with the Construction Activities: Potential Pollutants during construction includes: Concrete waste water, trash, fossil fuels, oil, grease, paint. Exposure of these pollutants to storm water runoff should be minimized by performing activities such as, equipment storage, refueling, maintenance and port-a -let placement in designated areas as shown on sheet C300 -C301. B2. Sequence Describing Stormwater Quality measure Implementation Relative to Land Disturbing Activities: See Construction Sequence on Sheets C300 -C301 B3. Stable Construct on Entrance Locations and Specifications: The construction entrance is shown on sheet C300 along with the details of installation and specification of maintenance on this sheet. B4. Sediment Control Measures for Sheet Flow: The areas of runoff in a sheet flow condition are shown on sheet C300. Silt fence is the primary measure used to eliminate this type of erosion. Silt fence details are shown on this sheet. B5. Sediment Control Measures For Concentrated Flow Areas: The concentrated flow areas are the proposed swales. Erosion control blankets and drop inlet protection baskets will be installed. Details are shown on this sheet. B6. Storm Sewer Inlet Protection Measure Locations and Specifications: Baskets and stone bags are shown to be placed at inlets. Locations are shown on sheet C300 and details are shown on this sheet. B7. Runoff Control Measures: The lake area is to be utilized for temporary sediment trap. B8. Stormwater Outlet Protection Specifications: All end sections of an outlet are shown to be rip rapped to prevent scour erosion. Rip Rap is shown on the site development plans and storm water pollution prevention plans. See detail shown on this sheet and C801. B9. Grade Stabilization Structure Locations and Specifications: Not necessary B10. Location, Dimensions, Specifications and Construction Details of Each Stormwater Quality Measure: Each measure is shown on the plans along with the appropriate details and specifications. B11. Temporary Surface Stabilization Methods Appropriate for Each Season: The storm water pollution prevention plans along with the detail sheet provides different methods and sequences for each measure to be utilized. (See seasonal soil protection chart on this sheet.) B12. Permanent Surface Stabilization Specifications: The permanent stabilization methods are specified on the storm water pollution prevention plans. The sequencing is specified on this sheet.(See seasonal soil protection chart on this sheet). B13. Material Handling and Spill Prevention Plan: In order to minimize the release of potential pollutants during construction the Contractor shall implement this material handling and spill prevention plan. The Contractor shall review this plan with all subcontractors and require that they implement the plan as well. 1. Construction Equipment a. Fueling, lubrication and fluids: All operations involving the addition of fluids to equipment should be done in one location, as designated on Sheets C300 -C301, so that spills are limited to one location on the site, which will facilitate the cleanup of spills. If an onsite fueling tank is planned to be on site, it shall be double walled and stored in this designated area. This location is an area that will not allow spilled fluids to migrate into subsurface soils. In the event of a spill, the fluid shall immediately be cleaned up by removing the contaminated soil or stone which shall be disposed of in an acceptable manner. Spills on hard surfaces shall be soaked up by an acceptable material such as Oil Dry and the absorbent material disposed of in a proper manner. The spill shall also be reported immediately to the Contractor's superintendent. b. Equipment repair, especially when fluids must be removed from the equipment or the possibility of fluid spills is high, should always be done offsite at a facility that is more suitable than a construction site to handle spills. When equipment must be repaired onsite it should be moved to the maintenance and fueling area if possible. Otherwise, suitable on site containers should be placed under the equipment during repair to catch any spilled fluids and these fluids should be disposed of in a proper manner. c. All reusable fluid containers, such as gasoline cans, shall be inspected for leaks each time they are used. If leaks are found, the fluid shall be removed from the container in a proper manner and the container disposed of in an acceptable manner. Empty disposable containers, such as grease tubes and lubricating oil and brake fluid containers, and their packaging, shall be disposed of in a proper manner and shall not be left on the ground or in the open on the construction site. CONSTRUCTION ENTRANCE/ EXIT B13 cont. EROSION CONTROL PLAN LEGEND EXISTING DRAINAGE FINISHED DRAINAGE TREE CONSERVATION 1i II PROPERTY LINE/ DRAINAGE SWALE SILT FENCING GRAVEL ENTRANCE/ EXIT PAD CURB INLET PROTECTION DROP INLET PROTECTION SOIL SALVAGE AND UTILIZATION PERMANENT SEEDING A4. C4. Location, Dimensions, Specifications and Construction Details of Each Stormwater Quality Measures: Catch basins, swales, and lake locations are provided on the site development plans. Details are provided on the Construction Plan Detail sheets. C5. Description of Maintenance Guidelines for Proposed Post Construction Water Quality Measures: Maintenance of all Stormwater pollution prevention measures will be the responsibility of the project owner, Trinity Homes. L.L.C. until a point in time in which the Home Owners Association is established, utilizing procedures outline in the O &M manual for Post Construction water quality measures. At that point said association shall assume all maintenance responsibilities. The maintenance guidelines consist mostly of good housekeeping measures. Any grassed or vegetated areas that experience erosion from rainfall events should be repaired and revegetated as soon as possible. Trash or litter should be picked up and properly disposed to prevent it from getting into the storm drainage system and downstream waterways. Erosion of the detention pond banks should be addressed as soon as it becomes visible by filling the eroded area with suitable soil and establishing vegetation immediately, preferably by sodding, or by seeding and mulching and monitoring until suitable vegetation is established. The same measure should be used for steep banks of any earth berm or any other steep area. The detention pond should also be monitored for sediment coming from the storm drainage system. If the bottom of the pond receives sediment, indicated by the sediment markers, it should be cleaned out and the source found and repaired. The elevation of the pond bottom should be checked every 8 to 10 years and, if significant sediment is encountered, it should be removed from the basin. This should be done during periods of low rainfall to allow soil stirred up by excavation to settle out before a rain event. The detention pond outlet should also be protected by adequate filtration (rip -rap, shown on these plans) to prevent soil from entering the offsite storm drainage system. Pavement areas should also be monitored for pollutants. Any large quantity of fluids such as oil, antifreeze, brake fluid, etc. found on the pavement should be reported to the Home Owner Association and the source determined, if possible, and removed from the site for maintenance or repair. Pavements should also be monitored for sediment coming from vegetated areas that drain onto the pavement. If sediment is found it should be cleaned off the pavement, and the source of the soil found and repaired as discussed above. LOCATION MAP 2. Construction Materials and Practices a. Erosion control measures shown on these plans shall be implemented prior to and during construction in the proper sequencing to minimize soil erosion. Erosion controls shall be inspected and maintained as described elsewhere in these plans. Excessive dusting of soil on the site shall be minimized by reducing construction traffic across bare soil during dry and/or windy weather, and by applying water or other acceptable dust control measures to the soil. Upon completion of construction and suitable establishment of permanent vegetation, temporary erosion control measures such as silt fence, check dams and inlet protection devices shall be removed in a manner to minimize additional land disturbance. Any areas disturbed by these operations shall be properly revegetated. b. Large waste materials created by cutting, sawing, drilling, or other operations shall be properly disposed of in suitable onsite waste containers. The site shall o be checked at the end of the day, as a minimum, and all waste materials, including those blown across or off the site by wind, shall be picked up and disposed of in suitable containers. Where possible, operations such as sawing that create small particles should be performed in one spot in an area protected from wind, and waste particles collected and disposed of frequently to minimize wind dispersal. Packaging used to transport materials to the site for construction of the facility shall be disposed of properly, whether the material is taken out of its package and incorporated into the project immediately or stored onsite for future use. Packaged materials stored onsite shall be inspected regularly and any loose packaging shall be repaired or disposed of properly. c. All dewatering of activities shall be done in accordance to good erosion control practices. These practices should include the use of dirt bags such as Dandy Dirt Bags. The use of these types of dewatering devices will remove large quantities of silt, sediment and dirt and prevent these materials to enter the storm sewer system. d. If the use of lime is used to stabilize the soil of the site then all construction equipment used shall be cleaned of all excess material with water in the maintenance and refueling area as shown within these plans. e. Nutrients and fertilizers shall only be used to establish rapid vegetation. When these products are utilized, the user should pay strict attention to the products recommended usage. 3. Concrete Waste Water a. All concrete waster water shall be disposed of in the designated area as shown on Sheets C300 -C301. This area is a 4' high, 10' diameter doughnut type mulch berm which shall be constructed over a geotextile fabric. This area shall be inspected on a daily basis as a minimum. When this area becomes full, the pollutants shall be excavated, placed in an acceptable container and disposed of in a proper manner. 4. Paint Products a. All excess paint and there related products shall be disposed of in the manner at which the manufacturer suggest. Under NO circumstances will paint or their related products be cleaned or disposed of in soil, sanitary sewers, storm sewers, detention basins or burned. Any violation of this shall be reported to the job superintendent. 5. Spill Response Directions In the event of small spills please contact the construction supervisor. In the event of spills that require removal of soils or other materials, please contact the construction supervisor, developer, County Surveyor's Office and the Local Fire Department. In the event of spills that have potential groundwater or surface water contamination, please contact the construction supervisor, developer, County Surveyor's Office, Local Fire Department and IDEM. See 0 M Manual for all Emergency Numbers. B14. Monitoring and Maintenance Guidelines for Each Proposed Pollution Prevention Mea sure: Person in charge of and knowledgeable about erosion and sediment control shall inspect the site for stormwater pollution prevention deficiencies at least daily and again within 24 hours of every 1/2 inch rain event. See Erosion Crontrol Notes on this sheet for specifications. B15. Erosion and Sediment Control Specifications For Individual Building Lots: Construction sequence for individual building lots is shown on this sheet. Stormwater Pollution Prevention Plan Post Construction Component Cl. Description of Pollutants and Their Sources Associated with the Proposed Land Use: Proposed site will be a multifamily subdivision. Potential pollutants from this type of development include, but are not limited to: fluids and debris from parked vehicles vehicular traffic which could include: fossil fuels, oil, grease, antifreeze, brake fluid, window washer fluid, rubber, plastic, metal fragments, grit (sediment) from wearing of the road surface, trash (including bacteria and other biological agents contained in the trash) from littering and other types of improper disposal or storage, and elevated receiving water temperatures from stormwater runoff contact with impervious surfaces. C2. &C3. Sequence Describing Stormwater Quality Measure Implementation: Description of Proposed Post Construction Stormwater Quality Measures: The post construction measures used to minimize sedimentation in waterways include swales and detention ponds. The swales will collect runoff from the homes. The design of the swales will allow sediment to be partially infiltrated before storm water enters the designed storm sewer system. Beehive inlets will prevent large items from entering the storm pipes and leaving the site. The detentions basins, which is designed to have water in it at all times, will also help reduce sediment and trash by allowing it to drop out prior to leaving the site. 3: 1 LINE WITH GEOTEXTILE WOVEN FABRIC #53 STONE VIP 11110 7 T L.-J .r X17 4�� +��e".. ■■dio FUELING VEHICLE MAINTENANCE AREA SECTION "Z -"Z" NOT -TO -SCALE TOP VIEW 10' DIA. A18. NOT -TO -SCALE (3) 12" MULCH FILLED EROSION CONTROL LOGS 6 EXCAVATED KEYWAY 6" EXCAVATED KEYWAY /N R p tumour =AL BOTTOM OVER GEOTEXTILE CQE er E 1AASHOUT =AL WOVEN FABRIC NOT -TO -SCALE SOILS MAP CrA OUTLET PIPE Upstream gravel teeing t ft. thick ROCK HORSE SHOE DAM DETAIL EROSION CONTROL NOTES 2 -3" WASHED STONE (INDOT CA. #2) 1. At a position downslope of the lot and upslope of the inlet, attach log around upslope of curb and away from inlet. 2. Set up safety /traffic barriers to keep vehicles from hitting logs, causing possible injury. 3. Inspect and repair as needed, and remove any accumulated sediments after every storm. CONSTRUCTION ENTRANCE DETAIL 2O' -0" MIN. WIDTH NOT -TO -SCALE r Runoff CURB INLET PROTECTION DETAIL NOT- TO-SCALE 01131 11111 111 1/4 4S TE T G No. 10200495 L. -o STATE OF Q wit Br Brookston silty clay loam- this soil is dark colored, silty in texture and on depressional uplands. It is deep and very poorly drained with moderate permeability. It has high available water for plant growth and high organic matter content. It has compact till starting at a depth of 40 to 60 inches. The main soil features that affect the urban development uses are seasonal high water table, high potential frost action, moderate shrink -swell potential, moderate permeability and ponded surface water. Crosby silt loam, 0 -3 percent slopes- this soil is light colored, silty in texture and on sloping uplands. It is deep and somewhat poorly drained with slow permeability. It has high available water for plant growth and medium organic matter content. The soil has compact till starting at a depth between 20 -40 inches. The main soil features that affect urban development uses are seasonal high water table, moderate shrink -swell potential, high potential frost action and slow permeability. MIN. MmB2 Miami silt loam, 2 -6 percent slopes- this soil is light colored, silty in texture and on sloping uplands. It is deep and well drained with moderate permeability. It has moderate available water for plant growth and a medium organic matter content. It has compact till starting at a depth between 20 -40 inches. The main soil features that adversely affect urban development uses are moderate potential frost action, moderate shrink -swell potential, moderately slow permeability, low strength and erosion during construction. COCONUT FIBER EROSION CONTROL LOGS m J W D Z 0 F Z W Z 0 F -J 0 a. cc 0 m Li LLl 0 LLJ W Q z 0 O z N) z z w 0 >-1•0 o Q <0 W Led D W Z H SHEET NO. C301 JOB NO.42480 0 rn co W I- Q Q z Q z