HomeMy WebLinkAboutC801 Erosion Control DetailsSeedbed Preparation
Apply lime to raise the pH to the level needed for species being
seeded. Apply 23 pounds of 12 -12 -12 analysis fertilizer (or equivalent) per
1000 sq. ft. (approximately 1000 pounds per acre) or fertilize according to
Application of 150 lbs. of ammonium nitrate on areas low in organic
motter and fertility will greatly enhance vegetative growth.
Work the fertilizer and lime into the soil to a depth of 2 -3 inches
with o harrow, disk or rake operated across the slope as much as possible.
Seeding
Select a seed mixture based on projected use of the area (Figure 5 -2),
while considering best seeding dates. See Figure 5 -3 this sheet. If toler-
ances are a problem, such as salt tolerance of seedings adjacent to streets
and highways, see Figure 5 -4 this sheet before final selection.
Mulch Rate
Mulch is to be applied at 2,000 to 3,000 pounds per acre in areas not
covered by erosion control blanketing. Mulch must be anchored using a mulch
anchoring tool or form disk with dull, serrated, straight set blades, or bulldozer
cleats driven up and down slope.
Species
1. Tall Fescue
Level and Sloping, Open Areas
Steep Banks and Cuts
4. Toll Fescue
Kentucky Bluegrass 25 .6
5. Tall Fescue 35 .8 5.5 -8.3
Emerald Crownvetch 10 .25
Lawns and High Maintenance Areas
6. Kentucky Bluegrass 401 .9 5.8 -7.5
Creeping Red Fescue 40 .9
7. Perennial Ryegrass 170 4.0 5.0 -7.5
(Turf Type)
8. Tall Fescue 170 4.0 5.5 -8.3
1 Preferred 2 Will Tolerate inoculate with specific Inoculant.
Irrigated
Non irrigated*
Dormant
Seeding
Annual ryegrass
Figure 5 -2: Permanent Seed Mixtures
Seeding Rate Suitable pH
lbs /acre lbs/1000
sq. ft.
35 .8 5.5 -8.3
15 .4 5.8 -7.5
.6 5.5 -8.3
.12
.4 5.5 -7.5
.4
Temporary Seeding Dotes
Mar 1 Apr 1 May
Temporary Seedings
1000 Sq. Ft. Acre
Ranking:
1 Good
2 Medium
Not tolerant
Irrigation needed during'�'�i
erosion at times other than
use mulch.
Late summer seeding dates
if mulch is applied.
FIGURE 5 -3
Increase seeding application by 50%.
Remarks
2.3 lbs. 3 bu. Cover seed 1" deep
ieriod. To control
in the shaded areas,
may be extended 5 days
1 Ib, 40 lbs. Cover seed 1 /4 "deep*
FIGURE 5-4
SOIL 8 Salt
CONDITION Tolerance
Wet Vorrr Dry Gen. Soli Spray
Creeping Red Fescue 2 1 2 1
Festuco rubra 7 -21 S
Kentucky Bluegrass 2 1 2 1 1 1 Med. 1 25 -35 12 -18 10-20 MT
Poo pratlnsis
Tall Fescue 2 1 1 1 1 1 Low 1 24-35 24-36 5 -14 T
Festuco L orundinaceo
Perennial ryegrass 2 1 2 1 2 He 2 15 -20 12 -18 5-10 MT
Lolium perenne g
Crownvetch 1 1 2 Low 1 5 -10 24 14-21 T
Coronillo varia
Red Clover 1 2 Med. 1 7 -10 18 5-10 S S
Trifolium protense
Solt Tolerance (to both soil salts spray):
T Tolerance
MT Medium Tolerance
S Slight Tolerance
3
DE BLANKET SHOULD NOT BE
STRETCHED BUT ALLOWED TO LAY
LOOSELY ON THE SO L SURFACE 10
ACHIEVE 11001U11 BLANKET To SOB.
CONTACT.
5
IN HION VELOCITY CNANNa. APPUCAIIONS,
CHECK SLOTS SHOULD BE ESTABUSHED
EVERY 35 40'. THE SLOTS SHOULD BE
6' WIDE BY 6' DEEP WTH 1) BLANKET
STAPLED IN 1HE BOTTOM OF THE SLOT,
'MEN BACKFiUED AND SEEDED.
300
275
215
SLOPE i s
LENGTH 155
100
75•
25•
0•
SILT FENCE
Silt Fence Material
Fence Post
Fence Post Should
be Buried 1' Below
Ground Surface
GENERAL STAPLE RECOMMENDATIONS
4:1 3:1 21 1:1
SLOPE GRADIENT
1
THE EDGES OF RE
BLANKET s
BE BUTTED AGAINST EACH OTHER, 1HE
EDGES OF THE SCC225 SHOULD BE
OVERLAPPED 2'.
7
OOUT BLANICETS
D REC1�N
OF WATER FLOALL
ROLL BLJU6CETS
OUT N DUEC110N
OF WATER FLOW.
SEE CHART FOR MAINTENANCE REQUIREMENTS
ADDf)ONAL STAPLES AS
MOVED DIE 10 DEPTH OF FLOMt
4
ON LONG SU PES,, 'ME ENDS OF THE BLANKETS SHOULD BE OVERLAPPED
I NGL
4 6' IN A 'SFE EFFECY.
EROSION BLANKET INSTALLA11ON
SILT FENCE DETAIL
NTS
Silt Fence shall be a machine produced, non -woven geotextile of 100%
polypropylene meeting the physical properties below.
All stokes shall be 2" X 2" hardwood 36" tall with 24" tall lath stapled
to stakes over fabric as reinforcement.
All silt fence shall be prefabricated by the supplier. No field assembly
will be accepted.
Fabric Weight 4 oz /syd
Grab Strength Warp 125 lbs.
Elongation Worp 50
Trapezoidal Tear Strength 50 lbs.
Burst Strength 200 psi
UV Resistance 70
A.O.S 50 -80
Slurry Flow Rote 225 gpm /sq. ft
Sediment Retention 75
Ground Surface
Silt Fence Material Should
be Buried 6" Below Ground
Surface.
2:1 side
f slope (max.)
z+' •r 1 l�l 1 :1 side =hill I ,W
Y7. sl.oPe (maxj r
�t'7
EROSION CONTROL SCHEDULE
EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE
STONE ENTRANCE AS NEEDED PRIOR TO CLEARING AND GRADING
SILT FENCE WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING
EXISTING INLET PROTECTION WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING
TREE PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING
TEMPORARY DIVERSIONS WEEKLY. AFTER STORM EVENTS AND AS NEEDED ALONG WITH ROUGH 0#tADING
TEMPORARY SEDIMENT TRAP WEEKLY, AFTER STORM EVENTS AND AS NEEDED AL ONG WITH ROUGH GRADING.
TEMPORARY SEEDING WATER AS NEEDED AFTER ROUGH GRADING
PERMANENT SEEDING WATER AS NEEDED AFTER FINISH GRADING
r s N k li i M N I i AFTER FINISH GRADING
S TRAW. BALES WEEKLY, AFTER STORM EVENTS A AS NEEDED N A
INLET PROTECTION WEEKLY AFTER STORM EVENTS A AS NEEDED AFTER EACH INLET IS PLACED
SEED. SOD lie J.ANDSCAPE AROUND WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS
FINISHED UNITS
REMOVAL OF STRAW BALES N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF INLET PROTECTION N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE N /A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
EROSION CONTROL
MATTING DETAIL
z staves (cw)��
p0� bale
CROSSBARS
SEEDING
EXISTING GRADE
Plan
(n.t.s.)
Profile
(n.t.s.)
NOTE:
1. SEE SILT FENCE DETAIL
FOR MATERIAL SPECIFICATIONS.
2. SILT FENCE SHALL BE
PREASSEMBLED BY SUPPLIER.
6" HIGH, 12" WIDE GEOTECTILE FABRIC
FILLED WITH No. 2 STONE. (FABRIC -NUTEC
3NW SILT FENCE FABRIC OR APPROVED EQUAL)
ONE FOOT OVERLAP
ONTO THE CURB
straw bale
3"-6"undertoe
SEDIMENT FILTER DETAIL
BEEHIVE INLET OR
DRAINAGE COVER
<=i1==fa
LATHS
.•4 SILT FENCE MATERIAL SILT FENCE EXTEN S
6" BELOW FINISHED GRADE
INLET PROTECTION SILT FENCE
6" MIN. TURN DOWN
BLANKET
GREEN
PAVED AREA INLET SEDIMENT BARRIER
NO SCALE
CURB INLET SEDIMENT BARRIER
NO SCALE
PAVED AREA INLET
EROSION AND SEDIMENT CONTROL PLAN SUMMARY AND "RULE 5" DATA
Project: Hilton Garden Inn Hotel
Nature and Purpose: Hotel
Estimated Start: October 1, 2001
Estimated Completion of Site Development October 2002
Floodplains, Floodway Fringes, Floodways: None
Lakes, Streams, Channels, Ditches, Wetlands, etc.: None
Existing Soil Types Description (refer to sheet C100 for soils map):
Crosby Silt Loam, 0 to 3 percent slopes
Shoals silt loam
Receiving Waters: Williams Creek
Potential Areas Where Stormwater May Enter Groundwater. None known
Existing Vegetation: The site is covered with grass weeds.
Contact Person:
Tim Dora
Dora Brothers Hospitality Corp.
9780 North by Northeast Blvd.
Fishers, IN 46038
(317) 578 -9999
Adjacent Land Use:
North Commercial
South Commercial
East Commerical
West Commercial
Site Specific Sequence and Additional Notes:
The swales should be constructed and stabilized as early as practical to prevent
run -off from leaving the site. Erosion control for existing outlet structures must
be maintained Blanket installation to be done as soon as slopes are constructed.
SILT FENCE MAINTENANCE REQUIREMENTS
PUBLIC ROAD
0.0
/0.0 0
00 0
•O 0.O
0 O•
0'0
O•o 0•o 0•o 0 0•
0•o 0.0 0•o O•o
•o 0.0
°O
.0 0. °0.0
0 .0 o 0 °0 •O °0.O °0 °0.0
0 0 0.000.0 0 0,0 0 0e9 0 0•0 0 0.0 0 0•O
0•4" 0•0 0.9 0 1 0 0.0 0 .0
0.o.0.0 °0.0•0.0 •0•o•o.o °0.0.0.0°0.0°
5 p o 0 •0 p 0 p 0 p 0 p 0 0 Q 0 0 o
•O.0• a •�•O. 0. °O. °0.0• °0.
•p 0.0 0. 0.0 0.0 O• .0•9.0,0e000•0•0-1T., °0.0.0• •°..•o•••••o •0• °0.o
eO.0 0 O.O D.0 O.0 0
0. 0 0 p o 0 D e 0 D e 0• 0 0• 0 0
eato O.p O 0•p 0•o O.O 0•o%
O O•p o•p o•0 0.9 0
0
'0 io 0.0o0ioe0 0°
0 0 0ip o 0
;�o °o a0 °0!d
L o :o e 0 o
6 (MIN)
2 -3" COARSE
AGGREGATE
GEOTEXTILE FABRIC TO STABIUZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
TEMPORARY CONSTRUC11ON
ENTRANCE DETAIL
EROSiQN CONTROL MEASURES MAINTENANCE REQUIREMENTS
STRAW BALE DAM MAINTENANCE REQUIREMENTS
1. INSPECT STRAW BALE DAMS AFTER EACH S0RM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVIiiES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABIUZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABIUZE
1. ASPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
1 REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABIUZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING iF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIPRAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABIUZED, REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE SITE TO BLEND WITH ADJOINING AREAS, AND STABIUZE.
SANDBAG CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS
1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR iF
NECESSARY.
2. INSPECT AFTER EACH STORM EVENT.
3. REMOVE SEDIMENT, WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF THE
BARRIER.
4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS.
BLOCK AND GRAVEL CURB INLET PROTECTION MAINTENANCE REQUIREMENTS
1. AFTER EACH STORM EVENT, REMOVE THE SEDIMENT AND REPLACE THE GRAVEL;
REPLACE THE GEOTEXTiLE FABRIC, IF USED.
2, PERIODICALLY REMOVE SEDIMENT AND TRACKED -ON SOIL FROM THE STREET, WITHOUT
FLUSHING, TO REDUCE 1HE SEDIMENT LOAD ON THE CURB INLET PROTECTION.
3. INSPECT PERIODICALLY FOR DAMAGE AND REPAIR; KEEP GRATES FREE OF DEBRIS.
4. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE
GRAVEL, WIRE MESH, GEOTEX11LE FABRIC, AND ANY SEDIMENT, AND DISPOSE OF THEM
PROPERLY.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS
1. DURING VEGETATIVE ESTABUSHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF 1HE BLANKET COVERING
IT, ADD SOIL RE -SEED 1HE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABUSHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL
3. TOPDRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBUC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
onnullu
1 No.
PE19500260
STATE OF .•'iZi
AONAL
Iptlllml
DATE: Q L..
THIS DRAWING AND THE IDEAS, DESIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRITTEN CONSENT OF THE SCHNEIDER
CORPORATION.
COPYRIGHTED BY THE SCHNEIDER CORP. (2001)
Schneider
THE SCHNEIDER CORPORATION
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216 -1037
Telephone: 317.826.7100
Fax: 317.826.7200
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GiS LiS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering
DATE:
08/31/01
PROJECT NO.:
3781.001
DRAWN BY:
CWD
CHECKED BY:
JCZ
SHEET TITLE:
EROSION CONTROL
DETAILS
DRAWING FILES:
S: \3k \3781 \OO1 \dwgs \civil \C801.dwg
XREF: S: \3k \3781 \OO1 \dwgs \civil \Titlel.dwg
SHEET NO.:
i)
Mature
Height (inches)
00
P
Seedbed Preparation
Apply lime to raise the pH to the level needed for species being
seeded. Apply 23 pounds of 12 -12 -12 analysis fertilizer (or equivalent) per
1000 sq. ft. (approximately 1000 pounds per acre) or fertilize according to
Application of 150 lbs. of ammonium nitrate on areas low in organic
motter and fertility will greatly enhance vegetative growth.
Work the fertilizer and lime into the soil to a depth of 2 -3 inches
with o harrow, disk or rake operated across the slope as much as possible.
Seeding
Select a seed mixture based on projected use of the area (Figure 5 -2),
while considering best seeding dates. See Figure 5 -3 this sheet. If toler-
ances are a problem, such as salt tolerance of seedings adjacent to streets
and highways, see Figure 5 -4 this sheet before final selection.
Mulch Rate
Mulch is to be applied at 2,000 to 3,000 pounds per acre in areas not
covered by erosion control blanketing. Mulch must be anchored using a mulch
anchoring tool or form disk with dull, serrated, straight set blades, or bulldozer
cleats driven up and down slope.
Species
1. Tall Fescue
Level and Sloping, Open Areas
Steep Banks and Cuts
4. Toll Fescue
Kentucky Bluegrass 25 .6
5. Tall Fescue 35 .8 5.5 -8.3
Emerald Crownvetch 10 .25
Lawns and High Maintenance Areas
6. Kentucky Bluegrass 401 .9 5.8 -7.5
Creeping Red Fescue 40 .9
7. Perennial Ryegrass 170 4.0 5.0 -7.5
(Turf Type)
8. Tall Fescue 170 4.0 5.5 -8.3
1 Preferred 2 Will Tolerate inoculate with specific Inoculant.
Irrigated
Non irrigated*
Dormant
Seeding
Annual ryegrass
Figure 5 -2: Permanent Seed Mixtures
Seeding Rate Suitable pH
lbs /acre lbs/1000
sq. ft.
35 .8 5.5 -8.3
15 .4 5.8 -7.5
.6 5.5 -8.3
.12
.4 5.5 -7.5
.4
Temporary Seeding Dotes
Mar 1 Apr 1 May
Temporary Seedings
1000 Sq. Ft. Acre
Ranking:
1 Good
2 Medium
Not tolerant
Irrigation needed during'�'�i
erosion at times other than
use mulch.
Late summer seeding dates
if mulch is applied.
FIGURE 5 -3
Increase seeding application by 50%.
Remarks
2.3 lbs. 3 bu. Cover seed 1" deep
ieriod. To control
in the shaded areas,
may be extended 5 days
1 Ib, 40 lbs. Cover seed 1 /4 "deep*
FIGURE 5-4
SOIL 8 Salt
CONDITION Tolerance
Wet Vorrr Dry Gen. Soli Spray
Creeping Red Fescue 2 1 2 1
Festuco rubra 7 -21 S
Kentucky Bluegrass 2 1 2 1 1 1 Med. 1 25 -35 12 -18 10-20 MT
Poo pratlnsis
Tall Fescue 2 1 1 1 1 1 Low 1 24-35 24-36 5 -14 T
Festuco L orundinaceo
Perennial ryegrass 2 1 2 1 2 He 2 15 -20 12 -18 5-10 MT
Lolium perenne g
Crownvetch 1 1 2 Low 1 5 -10 24 14-21 T
Coronillo varia
Red Clover 1 2 Med. 1 7 -10 18 5-10 S S
Trifolium protense
Solt Tolerance (to both soil salts spray):
T Tolerance
MT Medium Tolerance
S Slight Tolerance
3
DE BLANKET SHOULD NOT BE
STRETCHED BUT ALLOWED TO LAY
LOOSELY ON THE SO L SURFACE 10
ACHIEVE 11001U11 BLANKET To SOB.
CONTACT.
5
IN HION VELOCITY CNANNa. APPUCAIIONS,
CHECK SLOTS SHOULD BE ESTABUSHED
EVERY 35 40'. THE SLOTS SHOULD BE
6' WIDE BY 6' DEEP WTH 1) BLANKET
STAPLED IN 1HE BOTTOM OF THE SLOT,
'MEN BACKFiUED AND SEEDED.
300
275
215
SLOPE i s
LENGTH 155
100
75•
25•
0•
SILT FENCE
Silt Fence Material
Fence Post
Fence Post Should
be Buried 1' Below
Ground Surface
GENERAL STAPLE RECOMMENDATIONS
4:1 3:1 21 1:1
SLOPE GRADIENT
1
THE EDGES OF RE
BLANKET s
BE BUTTED AGAINST EACH OTHER, 1HE
EDGES OF THE SCC225 SHOULD BE
OVERLAPPED 2'.
7
OOUT BLANICETS
D REC1�N
OF WATER FLOALL
ROLL BLJU6CETS
OUT N DUEC110N
OF WATER FLOW.
SEE CHART FOR MAINTENANCE REQUIREMENTS
ADDf)ONAL STAPLES AS
MOVED DIE 10 DEPTH OF FLOMt
4
ON LONG SU PES,, 'ME ENDS OF THE BLANKETS SHOULD BE OVERLAPPED
I NGL
4 6' IN A 'SFE EFFECY.
EROSION BLANKET INSTALLA11ON
SILT FENCE DETAIL
NTS
Silt Fence shall be a machine produced, non -woven geotextile of 100%
polypropylene meeting the physical properties below.
All stokes shall be 2" X 2" hardwood 36" tall with 24" tall lath stapled
to stakes over fabric as reinforcement.
All silt fence shall be prefabricated by the supplier. No field assembly
will be accepted.
Fabric Weight 4 oz /syd
Grab Strength Warp 125 lbs.
Elongation Worp 50
Trapezoidal Tear Strength 50 lbs.
Burst Strength 200 psi
UV Resistance 70
A.O.S 50 -80
Slurry Flow Rote 225 gpm /sq. ft
Sediment Retention 75
Ground Surface
Silt Fence Material Should
be Buried 6" Below Ground
Surface.
2:1 side
f slope (max.)
z+' •r 1 l�l 1 :1 side =hill I ,W
Y7. sl.oPe (maxj r
�t'7
EROSION CONTROL SCHEDULE
EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE
STONE ENTRANCE AS NEEDED PRIOR TO CLEARING AND GRADING
SILT FENCE WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING
EXISTING INLET PROTECTION WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING
TREE PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING
TEMPORARY DIVERSIONS WEEKLY. AFTER STORM EVENTS AND AS NEEDED ALONG WITH ROUGH 0#tADING
TEMPORARY SEDIMENT TRAP WEEKLY, AFTER STORM EVENTS AND AS NEEDED AL ONG WITH ROUGH GRADING.
TEMPORARY SEEDING WATER AS NEEDED AFTER ROUGH GRADING
PERMANENT SEEDING WATER AS NEEDED AFTER FINISH GRADING
r s N k li i M N I i AFTER FINISH GRADING
S TRAW. BALES WEEKLY, AFTER STORM EVENTS A AS NEEDED N A
INLET PROTECTION WEEKLY AFTER STORM EVENTS A AS NEEDED AFTER EACH INLET IS PLACED
SEED. SOD lie J.ANDSCAPE AROUND WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS
FINISHED UNITS
REMOVAL OF STRAW BALES N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF INLET PROTECTION N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE N /A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
EROSION CONTROL
MATTING DETAIL
z staves (cw)��
p0� bale
CROSSBARS
SEEDING
EXISTING GRADE
Plan
(n.t.s.)
Profile
(n.t.s.)
NOTE:
1. SEE SILT FENCE DETAIL
FOR MATERIAL SPECIFICATIONS.
2. SILT FENCE SHALL BE
PREASSEMBLED BY SUPPLIER.
6" HIGH, 12" WIDE GEOTECTILE FABRIC
FILLED WITH No. 2 STONE. (FABRIC -NUTEC
3NW SILT FENCE FABRIC OR APPROVED EQUAL)
ONE FOOT OVERLAP
ONTO THE CURB
straw bale
3"-6"undertoe
SEDIMENT FILTER DETAIL
BEEHIVE INLET OR
DRAINAGE COVER
<=i1==fa
LATHS
.•4 SILT FENCE MATERIAL SILT FENCE EXTEN S
6" BELOW FINISHED GRADE
INLET PROTECTION SILT FENCE
6" MIN. TURN DOWN
BLANKET
GREEN
PAVED AREA INLET SEDIMENT BARRIER
NO SCALE
CURB INLET SEDIMENT BARRIER
NO SCALE
PAVED AREA INLET
EROSION AND SEDIMENT CONTROL PLAN SUMMARY AND "RULE 5" DATA
Project: Hilton Garden Inn Hotel
Nature and Purpose: Hotel
Estimated Start: October 1, 2001
Estimated Completion of Site Development October 2002
Floodplains, Floodway Fringes, Floodways: None
Lakes, Streams, Channels, Ditches, Wetlands, etc.: None
Existing Soil Types Description (refer to sheet C100 for soils map):
Crosby Silt Loam, 0 to 3 percent slopes
Shoals silt loam
Receiving Waters: Williams Creek
Potential Areas Where Stormwater May Enter Groundwater. None known
Existing Vegetation: The site is covered with grass weeds.
Contact Person:
Tim Dora
Dora Brothers Hospitality Corp.
9780 North by Northeast Blvd.
Fishers, IN 46038
(317) 578 -9999
Adjacent Land Use:
North Commercial
South Commercial
East Commerical
West Commercial
Site Specific Sequence and Additional Notes:
The swales should be constructed and stabilized as early as practical to prevent
run -off from leaving the site. Erosion control for existing outlet structures must
be maintained Blanket installation to be done as soon as slopes are constructed.
SILT FENCE MAINTENANCE REQUIREMENTS
PUBLIC ROAD
0.0
/0.0 0
00 0
•O 0.O
0 O•
0'0
O•o 0•o 0•o 0 0•
0•o 0.0 0•o O•o
•o 0.0
°O
.0 0. °0.0
0 .0 o 0 °0 •O °0.O °0 °0.0
0 0 0.000.0 0 0,0 0 0e9 0 0•0 0 0.0 0 0•O
0•4" 0•0 0.9 0 1 0 0.0 0 .0
0.o.0.0 °0.0•0.0 •0•o•o.o °0.0.0.0°0.0°
5 p o 0 •0 p 0 p 0 p 0 p 0 0 Q 0 0 o
•O.0• a •�•O. 0. °O. °0.0• °0.
•p 0.0 0. 0.0 0.0 O• .0•9.0,0e000•0•0-1T., °0.0.0• •°..•o•••••o •0• °0.o
eO.0 0 O.O D.0 O.0 0
0. 0 0 p o 0 D e 0 D e 0• 0 0• 0 0
eato O.p O 0•p 0•o O.O 0•o%
O O•p o•p o•0 0.9 0
0
'0 io 0.0o0ioe0 0°
0 0 0ip o 0
;�o °o a0 °0!d
L o :o e 0 o
6 (MIN)
2 -3" COARSE
AGGREGATE
GEOTEXTILE FABRIC TO STABIUZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
TEMPORARY CONSTRUC11ON
ENTRANCE DETAIL
EROSiQN CONTROL MEASURES MAINTENANCE REQUIREMENTS
STRAW BALE DAM MAINTENANCE REQUIREMENTS
1. INSPECT STRAW BALE DAMS AFTER EACH S0RM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVIiiES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABIUZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABIUZE
1. ASPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
1 REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABIUZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING iF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIPRAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABIUZED, REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE SITE TO BLEND WITH ADJOINING AREAS, AND STABIUZE.
SANDBAG CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS
1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR iF
NECESSARY.
2. INSPECT AFTER EACH STORM EVENT.
3. REMOVE SEDIMENT, WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF THE
BARRIER.
4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS.
BLOCK AND GRAVEL CURB INLET PROTECTION MAINTENANCE REQUIREMENTS
1. AFTER EACH STORM EVENT, REMOVE THE SEDIMENT AND REPLACE THE GRAVEL;
REPLACE THE GEOTEXTiLE FABRIC, IF USED.
2, PERIODICALLY REMOVE SEDIMENT AND TRACKED -ON SOIL FROM THE STREET, WITHOUT
FLUSHING, TO REDUCE 1HE SEDIMENT LOAD ON THE CURB INLET PROTECTION.
3. INSPECT PERIODICALLY FOR DAMAGE AND REPAIR; KEEP GRATES FREE OF DEBRIS.
4. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE
GRAVEL, WIRE MESH, GEOTEX11LE FABRIC, AND ANY SEDIMENT, AND DISPOSE OF THEM
PROPERLY.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS
1. DURING VEGETATIVE ESTABUSHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF 1HE BLANKET COVERING
IT, ADD SOIL RE -SEED 1HE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABUSHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL
3. TOPDRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBUC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
onnullu
1 No.
PE19500260
STATE OF .•'iZi
AONAL
Iptlllml
DATE: Q L..
THIS DRAWING AND THE IDEAS, DESIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRITTEN CONSENT OF THE SCHNEIDER
CORPORATION.
COPYRIGHTED BY THE SCHNEIDER CORP. (2001)
Schneider
THE SCHNEIDER CORPORATION
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216 -1037
Telephone: 317.826.7100
Fax: 317.826.7200
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GiS LiS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering
DATE:
08/31/01
PROJECT NO.:
3781.001
DRAWN BY:
CWD
CHECKED BY:
JCZ
SHEET TITLE:
EROSION CONTROL
DETAILS
DRAWING FILES:
S: \3k \3781 \OO1 \dwgs \civil \C801.dwg
XREF: S: \3k \3781 \OO1 \dwgs \civil \Titlel.dwg
SHEET NO.:
i)
Mature
Height (inches)
00
Seedbed Preparation
Apply lime to raise the pH to the level needed for species being
seeded. Apply 23 pounds of 12 -12 -12 analysis fertilizer (or equivalent) per
1000 sq. ft. (approximately 1000 pounds per acre) or fertilize according to
Application of 150 lbs. of ammonium nitrate on areas low in organic
motter and fertility will greatly enhance vegetative growth.
Work the fertilizer and lime into the soil to a depth of 2 -3 inches
with o harrow, disk or rake operated across the slope as much as possible.
Seeding
Select a seed mixture based on projected use of the area (Figure 5 -2),
while considering best seeding dates. See Figure 5 -3 this sheet. If toler-
ances are a problem, such as salt tolerance of seedings adjacent to streets
and highways, see Figure 5 -4 this sheet before final selection.
Mulch Rate
Mulch is to be applied at 2,000 to 3,000 pounds per acre in areas not
covered by erosion control blanketing. Mulch must be anchored using a mulch
anchoring tool or form disk with dull, serrated, straight set blades, or bulldozer
cleats driven up and down slope.
Species
1. Tall Fescue
Level and Sloping, Open Areas
Steep Banks and Cuts
4. Toll Fescue
Kentucky Bluegrass 25 .6
5. Tall Fescue 35 .8 5.5 -8.3
Emerald Crownvetch 10 .25
Lawns and High Maintenance Areas
6. Kentucky Bluegrass 401 .9 5.8 -7.5
Creeping Red Fescue 40 .9
7. Perennial Ryegrass 170 4.0 5.0 -7.5
(Turf Type)
8. Tall Fescue 170 4.0 5.5 -8.3
1 Preferred 2 Will Tolerate inoculate with specific Inoculant.
Irrigated
Non irrigated*
Dormant
Seeding
Annual ryegrass
Figure 5 -2: Permanent Seed Mixtures
Seeding Rate Suitable pH
lbs /acre lbs/1000
sq. ft.
35 .8 5.5 -8.3
15 .4 5.8 -7.5
.6 5.5 -8.3
.12
.4 5.5 -7.5
.4
Temporary Seeding Dotes
Mar 1 Apr 1 May
Temporary Seedings
1000 Sq. Ft. Acre
Ranking:
1 Good
2 Medium
Not tolerant
Irrigation needed during'�'�i
erosion at times other than
use mulch.
Late summer seeding dates
if mulch is applied.
FIGURE 5 -3
Increase seeding application by 50%.
Remarks
2.3 lbs. 3 bu. Cover seed 1" deep
ieriod. To control
in the shaded areas,
may be extended 5 days
1 Ib, 40 lbs. Cover seed 1 /4 "deep*
FIGURE 5-4
SOIL 8 Salt
CONDITION Tolerance
Wet Vorrr Dry Gen. Soli Spray
Creeping Red Fescue 2 1 2 1
Festuco rubra 7 -21 S
Kentucky Bluegrass 2 1 2 1 1 1 Med. 1 25 -35 12 -18 10-20 MT
Poo pratlnsis
Tall Fescue 2 1 1 1 1 1 Low 1 24-35 24-36 5 -14 T
Festuco L orundinaceo
Perennial ryegrass 2 1 2 1 2 He 2 15 -20 12 -18 5-10 MT
Lolium perenne g
Crownvetch 1 1 2 Low 1 5 -10 24 14-21 T
Coronillo varia
Red Clover 1 2 Med. 1 7 -10 18 5-10 S S
Trifolium protense
Solt Tolerance (to both soil salts spray):
T Tolerance
MT Medium Tolerance
S Slight Tolerance
3
DE BLANKET SHOULD NOT BE
STRETCHED BUT ALLOWED TO LAY
LOOSELY ON THE SO L SURFACE 10
ACHIEVE 11001U11 BLANKET To SOB.
CONTACT.
5
IN HION VELOCITY CNANNa. APPUCAIIONS,
CHECK SLOTS SHOULD BE ESTABUSHED
EVERY 35 40'. THE SLOTS SHOULD BE
6' WIDE BY 6' DEEP WTH 1) BLANKET
STAPLED IN 1HE BOTTOM OF THE SLOT,
'MEN BACKFiUED AND SEEDED.
300
275
215
SLOPE i s
LENGTH 155
100
75•
25•
0•
SILT FENCE
Silt Fence Material
Fence Post
Fence Post Should
be Buried 1' Below
Ground Surface
GENERAL STAPLE RECOMMENDATIONS
4:1 3:1 21 1:1
SLOPE GRADIENT
1
THE EDGES OF RE
BLANKET s
BE BUTTED AGAINST EACH OTHER, 1HE
EDGES OF THE SCC225 SHOULD BE
OVERLAPPED 2'.
7
OOUT BLANICETS
D REC1�N
OF WATER FLOALL
ROLL BLJU6CETS
OUT N DUEC110N
OF WATER FLOW.
SEE CHART FOR MAINTENANCE REQUIREMENTS
ADDf)ONAL STAPLES AS
MOVED DIE 10 DEPTH OF FLOMt
4
ON LONG SU PES,, 'ME ENDS OF THE BLANKETS SHOULD BE OVERLAPPED
I NGL
4 6' IN A 'SFE EFFECY.
EROSION BLANKET INSTALLA11ON
SILT FENCE DETAIL
NTS
Silt Fence shall be a machine produced, non -woven geotextile of 100%
polypropylene meeting the physical properties below.
All stokes shall be 2" X 2" hardwood 36" tall with 24" tall lath stapled
to stakes over fabric as reinforcement.
All silt fence shall be prefabricated by the supplier. No field assembly
will be accepted.
Fabric Weight 4 oz /syd
Grab Strength Warp 125 lbs.
Elongation Worp 50
Trapezoidal Tear Strength 50 lbs.
Burst Strength 200 psi
UV Resistance 70
A.O.S 50 -80
Slurry Flow Rote 225 gpm /sq. ft
Sediment Retention 75
Ground Surface
Silt Fence Material Should
be Buried 6" Below Ground
Surface.
2:1 side
f slope (max.)
z+' •r 1 l�l 1 :1 side =hill I ,W
Y7. sl.oPe (maxj r
�t'7
EROSION CONTROL SCHEDULE
EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE
STONE ENTRANCE AS NEEDED PRIOR TO CLEARING AND GRADING
SILT FENCE WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING
EXISTING INLET PROTECTION WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING
TREE PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING
TEMPORARY DIVERSIONS WEEKLY. AFTER STORM EVENTS AND AS NEEDED ALONG WITH ROUGH 0#tADING
TEMPORARY SEDIMENT TRAP WEEKLY, AFTER STORM EVENTS AND AS NEEDED AL ONG WITH ROUGH GRADING.
TEMPORARY SEEDING WATER AS NEEDED AFTER ROUGH GRADING
PERMANENT SEEDING WATER AS NEEDED AFTER FINISH GRADING
r s N k li i M N I i AFTER FINISH GRADING
S TRAW. BALES WEEKLY, AFTER STORM EVENTS A AS NEEDED N A
INLET PROTECTION WEEKLY AFTER STORM EVENTS A AS NEEDED AFTER EACH INLET IS PLACED
SEED. SOD lie J.ANDSCAPE AROUND WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS
FINISHED UNITS
REMOVAL OF STRAW BALES N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF INLET PROTECTION N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE N /A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
EROSION CONTROL
MATTING DETAIL
z staves (cw)��
p0� bale
CROSSBARS
SEEDING
EXISTING GRADE
Plan
(n.t.s.)
Profile
(n.t.s.)
NOTE:
1. SEE SILT FENCE DETAIL
FOR MATERIAL SPECIFICATIONS.
2. SILT FENCE SHALL BE
PREASSEMBLED BY SUPPLIER.
6" HIGH, 12" WIDE GEOTECTILE FABRIC
FILLED WITH No. 2 STONE. (FABRIC -NUTEC
3NW SILT FENCE FABRIC OR APPROVED EQUAL)
ONE FOOT OVERLAP
ONTO THE CURB
straw bale
3"-6"undertoe
SEDIMENT FILTER DETAIL
BEEHIVE INLET OR
DRAINAGE COVER
<=i1==fa
LATHS
.•4 SILT FENCE MATERIAL SILT FENCE EXTEN S
6" BELOW FINISHED GRADE
INLET PROTECTION SILT FENCE
6" MIN. TURN DOWN
BLANKET
GREEN
PAVED AREA INLET SEDIMENT BARRIER
NO SCALE
CURB INLET SEDIMENT BARRIER
NO SCALE
PAVED AREA INLET
EROSION AND SEDIMENT CONTROL PLAN SUMMARY AND "RULE 5" DATA
Project: Hilton Garden Inn Hotel
Nature and Purpose: Hotel
Estimated Start: October 1, 2001
Estimated Completion of Site Development October 2002
Floodplains, Floodway Fringes, Floodways: None
Lakes, Streams, Channels, Ditches, Wetlands, etc.: None
Existing Soil Types Description (refer to sheet C100 for soils map):
Crosby Silt Loam, 0 to 3 percent slopes
Shoals silt loam
Receiving Waters: Williams Creek
Potential Areas Where Stormwater May Enter Groundwater. None known
Existing Vegetation: The site is covered with grass weeds.
Contact Person:
Tim Dora
Dora Brothers Hospitality Corp.
9780 North by Northeast Blvd.
Fishers, IN 46038
(317) 578 -9999
Adjacent Land Use:
North Commercial
South Commercial
East Commerical
West Commercial
Site Specific Sequence and Additional Notes:
The swales should be constructed and stabilized as early as practical to prevent
run -off from leaving the site. Erosion control for existing outlet structures must
be maintained Blanket installation to be done as soon as slopes are constructed.
SILT FENCE MAINTENANCE REQUIREMENTS
PUBLIC ROAD
0.0
/0.0 0
00 0
•O 0.O
0 O•
0'0
O•o 0•o 0•o 0 0•
0•o 0.0 0•o O•o
•o 0.0
°O
.0 0. °0.0
0 .0 o 0 °0 •O °0.O °0 °0.0
0 0 0.000.0 0 0,0 0 0e9 0 0•0 0 0.0 0 0•O
0•4" 0•0 0.9 0 1 0 0.0 0 .0
0.o.0.0 °0.0•0.0 •0•o•o.o °0.0.0.0°0.0°
5 p o 0 •0 p 0 p 0 p 0 p 0 0 Q 0 0 o
•O.0• a •�•O. 0. °O. °0.0• °0.
•p 0.0 0. 0.0 0.0 O• .0•9.0,0e000•0•0-1T., °0.0.0• •°..•o•••••o •0• °0.o
eO.0 0 O.O D.0 O.0 0
0. 0 0 p o 0 D e 0 D e 0• 0 0• 0 0
eato O.p O 0•p 0•o O.O 0•o%
O O•p o•p o•0 0.9 0
0
'0 io 0.0o0ioe0 0°
0 0 0ip o 0
;�o °o a0 °0!d
L o :o e 0 o
6 (MIN)
2 -3" COARSE
AGGREGATE
GEOTEXTILE FABRIC TO STABIUZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
TEMPORARY CONSTRUC11ON
ENTRANCE DETAIL
EROSiQN CONTROL MEASURES MAINTENANCE REQUIREMENTS
STRAW BALE DAM MAINTENANCE REQUIREMENTS
1. INSPECT STRAW BALE DAMS AFTER EACH S0RM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVIiiES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABIUZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABIUZE
1. ASPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
1 REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABIUZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING iF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIPRAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABIUZED, REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE SITE TO BLEND WITH ADJOINING AREAS, AND STABIUZE.
SANDBAG CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS
1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR iF
NECESSARY.
2. INSPECT AFTER EACH STORM EVENT.
3. REMOVE SEDIMENT, WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF THE
BARRIER.
4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS.
BLOCK AND GRAVEL CURB INLET PROTECTION MAINTENANCE REQUIREMENTS
1. AFTER EACH STORM EVENT, REMOVE THE SEDIMENT AND REPLACE THE GRAVEL;
REPLACE THE GEOTEXTiLE FABRIC, IF USED.
2, PERIODICALLY REMOVE SEDIMENT AND TRACKED -ON SOIL FROM THE STREET, WITHOUT
FLUSHING, TO REDUCE 1HE SEDIMENT LOAD ON THE CURB INLET PROTECTION.
3. INSPECT PERIODICALLY FOR DAMAGE AND REPAIR; KEEP GRATES FREE OF DEBRIS.
4. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE
GRAVEL, WIRE MESH, GEOTEX11LE FABRIC, AND ANY SEDIMENT, AND DISPOSE OF THEM
PROPERLY.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS
1. DURING VEGETATIVE ESTABUSHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF 1HE BLANKET COVERING
IT, ADD SOIL RE -SEED 1HE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABUSHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL
3. TOPDRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBUC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
onnullu
1 No.
PE19500260
STATE OF .•'iZi
AONAL
Iptlllml
DATE: Q L..
THIS DRAWING AND THE IDEAS, DESIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRITTEN CONSENT OF THE SCHNEIDER
CORPORATION.
COPYRIGHTED BY THE SCHNEIDER CORP. (2001)
Schneider
THE SCHNEIDER CORPORATION
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216 -1037
Telephone: 317.826.7100
Fax: 317.826.7200
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GiS LiS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering
I pose Mowing
to 2 -3 1 /2inches
0310.19101 I
buidwoal
howl
ISONSINDH
r
I',
(wC p) aouololoi
flWpoo u N
Mature
Height (inches)
00
Seedbed Preparation
Apply lime to raise the pH to the level needed for species being
seeded. Apply 23 pounds of 12 -12 -12 analysis fertilizer (or equivalent) per
1000 sq. ft. (approximately 1000 pounds per acre) or fertilize according to
Application of 150 lbs. of ammonium nitrate on areas low in organic
motter and fertility will greatly enhance vegetative growth.
Work the fertilizer and lime into the soil to a depth of 2 -3 inches
with o harrow, disk or rake operated across the slope as much as possible.
Seeding
Select a seed mixture based on projected use of the area (Figure 5 -2),
while considering best seeding dates. See Figure 5 -3 this sheet. If toler-
ances are a problem, such as salt tolerance of seedings adjacent to streets
and highways, see Figure 5 -4 this sheet before final selection.
Mulch Rate
Mulch is to be applied at 2,000 to 3,000 pounds per acre in areas not
covered by erosion control blanketing. Mulch must be anchored using a mulch
anchoring tool or form disk with dull, serrated, straight set blades, or bulldozer
cleats driven up and down slope.
Species
1. Tall Fescue
Level and Sloping, Open Areas
Steep Banks and Cuts
4. Toll Fescue
Kentucky Bluegrass 25 .6
5. Tall Fescue 35 .8 5.5 -8.3
Emerald Crownvetch 10 .25
Lawns and High Maintenance Areas
6. Kentucky Bluegrass 401 .9 5.8 -7.5
Creeping Red Fescue 40 .9
7. Perennial Ryegrass 170 4.0 5.0 -7.5
(Turf Type)
8. Tall Fescue 170 4.0 5.5 -8.3
1 Preferred 2 Will Tolerate inoculate with specific Inoculant.
Irrigated
Non irrigated*
Dormant
Seeding
Annual ryegrass
Figure 5 -2: Permanent Seed Mixtures
Seeding Rate Suitable pH
lbs /acre lbs/1000
sq. ft.
35 .8 5.5 -8.3
15 .4 5.8 -7.5
.6 5.5 -8.3
.12
.4 5.5 -7.5
.4
Temporary Seeding Dotes
Mar 1 Apr 1 May
Temporary Seedings
1000 Sq. Ft. Acre
Ranking:
1 Good
2 Medium
Not tolerant
Irrigation needed during'�'�i
erosion at times other than
use mulch.
Late summer seeding dates
if mulch is applied.
FIGURE 5 -3
Increase seeding application by 50%.
Remarks
2.3 lbs. 3 bu. Cover seed 1" deep
ieriod. To control
in the shaded areas,
may be extended 5 days
1 Ib, 40 lbs. Cover seed 1 /4 "deep*
FIGURE 5-4
SOIL 8 Salt
CONDITION Tolerance
Wet Vorrr Dry Gen. Soli Spray
Creeping Red Fescue 2 1 2 1
Festuco rubra 7 -21 S
Kentucky Bluegrass 2 1 2 1 1 1 Med. 1 25 -35 12 -18 10-20 MT
Poo pratlnsis
Tall Fescue 2 1 1 1 1 1 Low 1 24-35 24-36 5 -14 T
Festuco L orundinaceo
Perennial ryegrass 2 1 2 1 2 He 2 15 -20 12 -18 5-10 MT
Lolium perenne g
Crownvetch 1 1 2 Low 1 5 -10 24 14-21 T
Coronillo varia
Red Clover 1 2 Med. 1 7 -10 18 5-10 S S
Trifolium protense
Solt Tolerance (to both soil salts spray):
T Tolerance
MT Medium Tolerance
S Slight Tolerance
3
DE BLANKET SHOULD NOT BE
STRETCHED BUT ALLOWED TO LAY
LOOSELY ON THE SO L SURFACE 10
ACHIEVE 11001U11 BLANKET To SOB.
CONTACT.
5
IN HION VELOCITY CNANNa. APPUCAIIONS,
CHECK SLOTS SHOULD BE ESTABUSHED
EVERY 35 40'. THE SLOTS SHOULD BE
6' WIDE BY 6' DEEP WTH 1) BLANKET
STAPLED IN 1HE BOTTOM OF THE SLOT,
'MEN BACKFiUED AND SEEDED.
300
275
215
SLOPE i s
LENGTH 155
100
75•
25•
0•
SILT FENCE
Silt Fence Material
Fence Post
Fence Post Should
be Buried 1' Below
Ground Surface
GENERAL STAPLE RECOMMENDATIONS
4:1 3:1 21 1:1
SLOPE GRADIENT
1
THE EDGES OF RE
BLANKET s
BE BUTTED AGAINST EACH OTHER, 1HE
EDGES OF THE SCC225 SHOULD BE
OVERLAPPED 2'.
7
OOUT BLANICETS
D REC1�N
OF WATER FLOALL
ROLL BLJU6CETS
OUT N DUEC110N
OF WATER FLOW.
SEE CHART FOR MAINTENANCE REQUIREMENTS
ADDf)ONAL STAPLES AS
MOVED DIE 10 DEPTH OF FLOMt
4
ON LONG SU PES,, 'ME ENDS OF THE BLANKETS SHOULD BE OVERLAPPED
I NGL
4 6' IN A 'SFE EFFECY.
EROSION BLANKET INSTALLA11ON
SILT FENCE DETAIL
NTS
Silt Fence shall be a machine produced, non -woven geotextile of 100%
polypropylene meeting the physical properties below.
All stokes shall be 2" X 2" hardwood 36" tall with 24" tall lath stapled
to stakes over fabric as reinforcement.
All silt fence shall be prefabricated by the supplier. No field assembly
will be accepted.
Fabric Weight 4 oz /syd
Grab Strength Warp 125 lbs.
Elongation Worp 50
Trapezoidal Tear Strength 50 lbs.
Burst Strength 200 psi
UV Resistance 70
A.O.S 50 -80
Slurry Flow Rote 225 gpm /sq. ft
Sediment Retention 75
Ground Surface
Silt Fence Material Should
be Buried 6" Below Ground
Surface.
2:1 side
f slope (max.)
z+' •r 1 l�l 1 :1 side =hill I ,W
Y7. sl.oPe (maxj r
�t'7
EROSION CONTROL SCHEDULE
EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE
STONE ENTRANCE AS NEEDED PRIOR TO CLEARING AND GRADING
SILT FENCE WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING
EXISTING INLET PROTECTION WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING
TREE PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING
TEMPORARY DIVERSIONS WEEKLY. AFTER STORM EVENTS AND AS NEEDED ALONG WITH ROUGH 0#tADING
TEMPORARY SEDIMENT TRAP WEEKLY, AFTER STORM EVENTS AND AS NEEDED AL ONG WITH ROUGH GRADING.
TEMPORARY SEEDING WATER AS NEEDED AFTER ROUGH GRADING
PERMANENT SEEDING WATER AS NEEDED AFTER FINISH GRADING
r s N k li i M N I i AFTER FINISH GRADING
S TRAW. BALES WEEKLY, AFTER STORM EVENTS A AS NEEDED N A
INLET PROTECTION WEEKLY AFTER STORM EVENTS A AS NEEDED AFTER EACH INLET IS PLACED
SEED. SOD lie J.ANDSCAPE AROUND WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS
FINISHED UNITS
REMOVAL OF STRAW BALES N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF INLET PROTECTION N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE N /A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
EROSION CONTROL
MATTING DETAIL
z staves (cw)��
p0� bale
CROSSBARS
SEEDING
EXISTING GRADE
Plan
(n.t.s.)
Profile
(n.t.s.)
NOTE:
1. SEE SILT FENCE DETAIL
FOR MATERIAL SPECIFICATIONS.
2. SILT FENCE SHALL BE
PREASSEMBLED BY SUPPLIER.
6" HIGH, 12" WIDE GEOTECTILE FABRIC
FILLED WITH No. 2 STONE. (FABRIC -NUTEC
3NW SILT FENCE FABRIC OR APPROVED EQUAL)
ONE FOOT OVERLAP
ONTO THE CURB
straw bale
3"-6"undertoe
SEDIMENT FILTER DETAIL
BEEHIVE INLET OR
DRAINAGE COVER
<=i1==fa
LATHS
.•4 SILT FENCE MATERIAL SILT FENCE EXTEN S
6" BELOW FINISHED GRADE
INLET PROTECTION SILT FENCE
6" MIN. TURN DOWN
BLANKET
GREEN
PAVED AREA INLET SEDIMENT BARRIER
NO SCALE
CURB INLET SEDIMENT BARRIER
NO SCALE
PAVED AREA INLET
EROSION AND SEDIMENT CONTROL PLAN SUMMARY AND "RULE 5" DATA
Project: Hilton Garden Inn Hotel
Nature and Purpose: Hotel
Estimated Start: October 1, 2001
Estimated Completion of Site Development October 2002
Floodplains, Floodway Fringes, Floodways: None
Lakes, Streams, Channels, Ditches, Wetlands, etc.: None
Existing Soil Types Description (refer to sheet C100 for soils map):
Crosby Silt Loam, 0 to 3 percent slopes
Shoals silt loam
Receiving Waters: Williams Creek
Potential Areas Where Stormwater May Enter Groundwater. None known
Existing Vegetation: The site is covered with grass weeds.
Contact Person:
Tim Dora
Dora Brothers Hospitality Corp.
9780 North by Northeast Blvd.
Fishers, IN 46038
(317) 578 -9999
Adjacent Land Use:
North Commercial
South Commercial
East Commerical
West Commercial
Site Specific Sequence and Additional Notes:
The swales should be constructed and stabilized as early as practical to prevent
run -off from leaving the site. Erosion control for existing outlet structures must
be maintained Blanket installation to be done as soon as slopes are constructed.
SILT FENCE MAINTENANCE REQUIREMENTS
PUBLIC ROAD
0.0
/0.0 0
00 0
•O 0.O
0 O•
0'0
O•o 0•o 0•o 0 0•
0•o 0.0 0•o O•o
•o 0.0
°O
.0 0. °0.0
0 .0 o 0 °0 •O °0.O °0 °0.0
0 0 0.000.0 0 0,0 0 0e9 0 0•0 0 0.0 0 0•O
0•4" 0•0 0.9 0 1 0 0.0 0 .0
0.o.0.0 °0.0•0.0 •0•o•o.o °0.0.0.0°0.0°
5 p o 0 •0 p 0 p 0 p 0 p 0 0 Q 0 0 o
•O.0• a •�•O. 0. °O. °0.0• °0.
•p 0.0 0. 0.0 0.0 O• .0•9.0,0e000•0•0-1T., °0.0.0• •°..•o•••••o •0• °0.o
eO.0 0 O.O D.0 O.0 0
0. 0 0 p o 0 D e 0 D e 0• 0 0• 0 0
eato O.p O 0•p 0•o O.O 0•o%
O O•p o•p o•0 0.9 0
0
'0 io 0.0o0ioe0 0°
0 0 0ip o 0
;�o °o a0 °0!d
L o :o e 0 o
6 (MIN)
2 -3" COARSE
AGGREGATE
GEOTEXTILE FABRIC TO STABIUZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
TEMPORARY CONSTRUC11ON
ENTRANCE DETAIL
EROSiQN CONTROL MEASURES MAINTENANCE REQUIREMENTS
STRAW BALE DAM MAINTENANCE REQUIREMENTS
1. INSPECT STRAW BALE DAMS AFTER EACH S0RM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVIiiES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABIUZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABIUZE
1. ASPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
1 REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABIUZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING iF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIPRAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABIUZED, REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE SITE TO BLEND WITH ADJOINING AREAS, AND STABIUZE.
SANDBAG CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS
1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR iF
NECESSARY.
2. INSPECT AFTER EACH STORM EVENT.
3. REMOVE SEDIMENT, WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF THE
BARRIER.
4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS.
BLOCK AND GRAVEL CURB INLET PROTECTION MAINTENANCE REQUIREMENTS
1. AFTER EACH STORM EVENT, REMOVE THE SEDIMENT AND REPLACE THE GRAVEL;
REPLACE THE GEOTEXTiLE FABRIC, IF USED.
2, PERIODICALLY REMOVE SEDIMENT AND TRACKED -ON SOIL FROM THE STREET, WITHOUT
FLUSHING, TO REDUCE 1HE SEDIMENT LOAD ON THE CURB INLET PROTECTION.
3. INSPECT PERIODICALLY FOR DAMAGE AND REPAIR; KEEP GRATES FREE OF DEBRIS.
4. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE
GRAVEL, WIRE MESH, GEOTEX11LE FABRIC, AND ANY SEDIMENT, AND DISPOSE OF THEM
PROPERLY.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS
1. DURING VEGETATIVE ESTABUSHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF 1HE BLANKET COVERING
IT, ADD SOIL RE -SEED 1HE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABUSHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL
3. TOPDRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBUC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
onnullu
1 No.
PE19500260
STATE OF .•'iZi
AONAL
Iptlllml
DATE: Q L..
THIS DRAWING AND THE IDEAS, DESIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRITTEN CONSENT OF THE SCHNEIDER
CORPORATION.
COPYRIGHTED BY THE SCHNEIDER CORP. (2001)
Schneider
THE SCHNEIDER CORPORATION
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216 -1037
Telephone: 317.826.7100
Fax: 317.826.7200
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GiS LiS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering