HomeMy WebLinkAbout03100016 Tom Wood Subaru Construction Drawings pg. 05EROSION CONTROL SCHEDULE
EROSION CONTROL MEASURE
MAINTENANCE
INSTALLATION SEQUENCE
STONE ENTRANCE
WEEKLY, REMOVE EXCESS DIRT ON STONE
INSTALL FIRST
SILT FENCE
y
WEEKLY, AFTER STORM EVENTS MO AS NEEDED
PRIOR TO CLEARING AND GRAM
OUSTING INLET PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
TREE PROTECTION
WEEKLY, AFTER STORM EVENTS NM) AS NEEDED
PRIOR TO CLEARING AND GRADING
TEMPORARY DIVERSIONS
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
ALONG WITH ROUGH GRADING
G
TEMPORARY SEEDING
WATER AS
AFTER ROUGH GRADING
PERMANENT SEEDING
WATER AS NEEDED
AFTER FINISH GRADING
EROSION CONTROL MATTING
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER FINISH GRADING
stAw BALES
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER FINISH GRAM
INLET PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER EACH INLET IS PLACED
SEED, SOD LAMCAPE AROUND
WATER AS NEEDED
AFTER FINED GRADING AROUND FINISHED UNITS
UMTS FINSHED
REMENAL OF STRAW BALES
N/A
AFTER AU. AREAS DRAINING TO THESE AREAS ME STARVED
REMOVAL OF INLET PROTECTION
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE
N/A
AFTER ALL AREAS�ING TO THESE AREAS ARE STABILIZED
PHYSICAL PROPERTY
REQUIREMENTS
FILTER EFFICIENCY
75% (MIN)
TENSILE STRENGTH AT
20% (MAX) ELONGATION
EXTRA STRENGTH
50 Ibs. /lin. in. (MIN)
STANDARD STRENGTH
30 ibs. /Tin. in.
FLOW RATE
0.3 gal. /sq. ft. /min. (min)
20
1
07
Construction Entrance
Gmv- lor '3
GRAPHIC SCALE
20
40
1 W4We+
brimplaturigiii
SF
IN FEET
1 inch 20 ft.
LECIEND
AREAS TO BE SEEDED BLANKETED OR HYDRO SEEDED
(NOT USED)
AREAS TO BE SODDED OR SEEDED W/ PERMANENT SEED
GRAVEL ENTRANCE
SILT FENCE
INLET SEDIMENT PROTECTION (SEE DETAIL)
END SECTION SEDIMENT PROTECTION (SEE DETAIL)
EROSION CONTROL UEAUJFEB AID► ScHEDU.E
1 CONTRACTOR SHALL INSTALL ALL REQUIRED SILT FENCES
SILT TRAPS AND INLET PROTECTION FOR EXISTING INLETS
PRIOR TO THE START OF ANY EARTH MOVING OR STRIPPING.
2. CONTRACTOR SHALL INSTALL SAND BAGS ALONG THE
BUILDING OR SOME OTHER APPROVED EROSION CONTROL
PRIOR TO THE START OF EARTHWORK AS NECESSARY TO
PREVENT SOIL FROM BEING TRACKED OR WASHED ONTO
EXISTING ROADWAYS OR PAVEMENTS.
3. LAND ALTERATIONS WHICH STRIP THE LAND OF
VEGETATION, INCLUDING REGRADING, SHALL BE DONE
IN A WAY THAT WILL MINIMIZE EROSION, WHENEVER
POSSIBLE, NATURAL VEGETATION SHALL BE RETAINED
AND PROTECTED. WHEN GRADING IS COMPLETED, INSTALL
SILT TRAPS, SILT FENCES, SLOPE DRAINS, TEMPORARY
DIVERSIONS AND OTHER RUNOFF CONTROL MEASURES
AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT
CONTAINED ON SITE.
4. ALL DISTURBED AREAS SHALL BE SEEDED AND STRAW
MULCHED AS SHOWN ON THE PLANS IMMEDIATELY AFTER
COMPLETION OF GROUND ACTIVITY.
5. PERMANENT AND FINAL VEGETATION EROSION CONTROL
DEVICES SHALL BE INSTALLED AS SOON AS PRACTICAL.
6. THE DURATION OF TIME WHICH AN AREA REMAINS
EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM
DEPENDING UPON THE WEATHER. IF CONSTRUCTION
ACTIVITY IS TO CEASE FOR MORE THAN TWO WEEKS,
THE DISTURBED AREAS SHALL BE TEMPORARILY SEEDED.
7. ALL STORM SEWER INLET PROTECTION DEVICES SHALL
BE PUT IN PLACE AT THE TIME EACH INLET IS CONSTRUCTED.
8. CONTRACTOR SHALL MAINTAIN EROSION CONTROL
MEASURES AND DEVICES DURING CONSTRUCTION AND
UNTIL SILTATION OF THE STREETS AND STORM SEWERS
WILL NO LONGER OCCUR.
9. ONCE ONSITE EROSION AND SILTATION OF THE STREETS
AND STORM SEWERS WILL NO LONGER OCCUR. THE
CONTRACTOR SHALL REMOVE AND DISPOSE OF THE
TEMPORARY EROSION CONTROL DEVICES.
10. THESE GENERAL PROCEDURES MAY NOT COVER ALL
SITUATIONS. REFER TO EROSION CONTROL PLANS FOR
SPECIFIC NOTES AND ADDITIONAL DETAILS.
11. EROSION CONTROL IS TO COMPLY WITH INDIANA 327
IAC AND RULE 5, AND INDIANA HANDBOOK FOR EROSION
CONTROL IN DEVELOPING AREAS.
12. THE CITY ENGINEER HAS THE AUTHORITY TO REQUEST
ADDITIONAL EROSION CONTROL MEASURES OR AMEND EROSION
CONTROL PLANS SUBJECT TO ACTUAL. SITE CONDITIONS.
ti
1 IV(
,,A. 0 44
44k$ dis
44, 4t
i*
40011001
*Atoka
'111/ 111/1110 4 117.N., /0 4
ii;
vino
4
tot 4ifri
4‘
.1 4
r'�III!
j r i4llOO,MMIKA IYlaMINI
wre-mor
r 44; 4/
K .4‘
OP ..4.
Velifrk **/744-
r l e
4 t
41/41044
1 4 04 0?
issa
lim
80
Silt Fence
Silt Fence
EROSION CONTROL MEASURES LIAII IANC E REQ
Existing Conditions
Developed Car Lot
\At11 1 kk11i /i
E. S
d� r -i
No.
y 880573
STATE OF
SS /ON A .S 1 2/29/03
�lllkli{1
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS
1. INSPECT TEMPORARY SEDIMENT TRAP AFTER EACH STORM EVENT.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. PROMPTLY REPLACE ANY DISPLACED RIPRAP.
6. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE
AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS
1. INSPECT CURB INLET SEDIMENT BARRIER PERIODICALLY AND AFTER EACH STORM
EVENT AND REPAIR IF NEEDED.
2. REMOVE SEDIMENT WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF
THE BARRIER.
3. DEPOSIT SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS.
STRAW BALE DAM MAINTENANCE REQUIREMENTS
1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
/-2
SILT FENCE MAINTENANCE REQUIREMENTS
1. INSPECT SILT FENCE AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS OR BECOMES INEFFECTIVE, REPLACE THE AFFECTED AREA
IMMEDIATELY.
3. REMOVE SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST
POINT OR IS CAUSING THE FABRIC TO BULGE.
4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
FENCE AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
EROSION CONTROL BLANKET MAINTENANCE REQUIREMENTS
1. INSPECT EROSION CONTROL BLANKET PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF ANY AREA SHOWS EROSION, ADD SOIL AND RE -SEED THE AREA, RE -LAY AND STAPLE
THE BLANKET.
3. AFTER VEGETATIVE COVER IS ESTABLISHED, CHECK THE AREA PERIODICALLY.
TEMPORARY CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE WEEKLY AND AFTER EACH STORM EVENT OR HEAVY USE.
2. RESHAPE ENTRANCE AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. ADD CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY
BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED
INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
Existing Conditions
Developed Car Lot
Existing Conditions
Developed Car Lot
TEMPORARY:
WHEAT OR RYE
OR, SPRINS OATS
DORMANT SEEDING:
TO BE USED DURING PERIODS WHEN
SOIL TEMPERATURES ARE TOO LOW
FOR SEED GERMINATION, (±50° F.
APPROX. NOV 15 THRU FEB IN IND.)
DURING THIS PERIOD, IF SOIL TEMP.
IS BELOW 50', APPLY SEED
MULCH AS USUAL. IF SOIL TEMP IS
ABOVE 50`, MULCH, THEN APPLY
SEED OVER MULCH WHEN SOIL TEMP
IS BELOW 50'. INCREASE SEEDING
RATES 50
2 -3" WASHED STONE
(INDOT CA. #2)
MINIMUM LENGTH 50'
n
STONE DFIVE ENTRANCE DET'AL
SEED IuIXTURE'E
2 BU /AC
3 BU /AC
12' MIN.
SYNTHETIC FLIER F I C FECNI1313118
PERMANENT:
LAWN AND HIGH MAINTENANCE
KENTUCKY BLUEGRASS
CREEPING RED FESCUE
OR, PERENNIAL RYEGRASS
(TURF TYPE)
AND, WHEAT OR RYE
ALTERNATE SEED MIXTURE FOR
KENTUCKY BLUEGRASS
SMOOTH BROME GRASS
SWITCH GRASS
TIMOTHY
PERENNIAL RYEGRASS
(TURF TYPE)
WHITE OR LADINO CLOVER
RYE, WHEAT OR OATS
AREAS:
40 LB /AC
40 LB /AC
170 LB /AC
2 BU /AC
DRAINAGE AREAS:
20 LB /AC
10
4
10
1 -2
2 BU /AC
FERTILIZE W /1000 LB 12 -12 -12 /ACRE MULCH WITH 1 1/2 TO 2 TONS STRAW PER ACRE
MATERIALS
1. SYNTHETIC FILTER FABRIC SHOULD BE A PERIVOUS SHEET OF PROPYLENE,
NYLON, POLYESTER OR ETHYLENE YARN AND SHOULD BE CERTIFIED BY THE
MANUFACTURER OR SUPPLIER AS CONFORMING TO THE FOLLOWING REQUIREMENTS:
2. BURLAP SHOULD BE 10 OUNCE PER SQUARE YARD FABRIC.
3. POSTS FOR FILTER FENCES SHOULD BE EITHER 4" DIAMETER WOOD OR 1.33 POUNDS
PER LINEAR FOOT STEEL WITH A MINIMUM LENGTH OF 5'. STEEL POSTS SHOULD
HAVE PROJECTIONS FOR FASTENING WIRE TO THEM.
4. STAKES FOR FILTER FENCES SHOULD BE 1 "X2" WOOD (PREFERRED) OR EQUIVALENT
METAL WITH A MINIMUM LENGTH OF 3'.
5. WIRE FENCES REINFORCEMENT FOR SILT FENCES USING STANDARD STRENGTH FILTER
CLOTH SHOULD BE A MINIMUM OF 42" IN HEIGHT, A MINIMUM OF 14 GAUGE AND
SHOULD HAVE A MAXIMUM MESH SPACING OF 6
CONSTRUCTION
1. THE HEIGHT OF THE BARRIER SHOULD NOT EXCEED 36" (HIGHER BARRIERS MAY
IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE).
2. THE FABRIC SHOULD BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH
OF THE BARRIER TO AVOID THE USE OF JOINTS. WHEN JOINTS ARE NECESSARY,
FILTER CLOTH SHOULD BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A
MINIMUM 6" OVERLAP, AND SECURELY SEALED.
3. POSTS SHOULD BE SPACED A MAXIMUM OF 10' APART AT THE BARRIER LOCATION
AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 12 WHEN EXTRA STRENGTH
FABRIC IS USED WITHOUT THE WIRE SUPPORT FENCE, POST SPACING SHALL NOT
EXCEED 6'.
4. A TRENCH SHOULD BE EXCAVATED APPROXIMATELY 4" WIDE AND 4" DEEP ALONG
THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER.
5. WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE
SHOULD BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY
DUTY 1" WIRE STAPLES, TIE WIRES OR HOG RINGS. THE WIRE SHOULD EXTEND INTO
THE TRENCH A MINIMUM OF 2" AND SHOULD NOT EXTEND MORE THEN 36" ABOVE THE
ORIGINAL GROUND SURFACE.
6. THE STANDARD STRENGTH FILTER FABRIC SHOULD BE STAPLED OR WIRED TO THE
FENCE, AND 8" OF THE FABRIC SHOULD BE EXTENDED INTO THE TRENCH. THE FABRIC
SHOULD NOT EXTEND MORE THAN 36" ABOVE THE ORIGINAL GROUND SURFACE. FILTER
FABRIC SHOULD NOT BE STAPLED TO EXISTING TREES.
7. WHEN EXTRA STRENGTH FILTER FABRIC OR BURLAP AND CLOSER POST SPACING ARE
USED, THE WIRE MESH SUPPORT FENCE MAY BE ELIMINATED. IN SUCH A CASE, THE
FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE POSTS WITH ALL OTHER
PROVISIONS OF ITEM NO. 6 APPLYING.
8. THE TRENCH SHALL BE BACKFILLED AND THE SOIL COMPACTED OVER THE FILTER FABRIC.
9. FILTER BARRIERS SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE,
BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED.
No.
Date
Revision
11 /19 /O,EVISION PER HCSWCD
TRENCH
4 "X4"
w BOSON CONTROL NARRATIVE
1 B. THE SITE PRESENTLY IS A CAR DEALERSHIP. THE
PROPERTY TO THE NORTH IS A CAR DEALERSHIP, THE
PROPERTY TO THE SOUTH IS A CAR DEALERSHIP, AND
A BANK. THE PROPERTY TO THE WEST IS A CAR
DEALERSHIP. THIS PROJECT WILL BE A CAR
DEALERSHIP
2A. THE EXISTING VEGETATION IS A MAINTAINED LAWN.
28. THIS PROJECT DRAINS THROUGH A ON SITE PIPE
SYSTEM TO THE EAST 96TH STREET ROAD SIDE DITCHES
AND FINALLY INTO THE HEAD WATER OF WHITE RIVER
WHICH IS THE RECEIVING WATER FOR THIS PROJECT.
2C. THERE ARE NO 100 YEAR FLOODPLAINS,
FLOODWAY FRINGES OR FLOODWAYS ON THIS SITE.
20. THE SOILS ON SITE CONSIST OF A DEEP MIAMI
COMPLEX WITH MISCULANIOUS ENGINEERING FILL ON
TOP. THE SITE WILL BE FILLED DURRING THE
CONSTRUCTION OF THE NEW BUILDING.
POS
FILTER
FABRIC
BENCHMARK
HAM G -30
A BRONZE PLATE SET IN SOUTH END OF THE %EST PARAPET OF
AN 18 FOOT SLAB TOP CULVERT. ALSO. 0.8 MILE NORTH OF
MARION- HAMILTON COUNTY LINE ON SR -431. 2.8 MILES SOUTH
OF SR -234. GREENFIELD DISTRICT. ELEVATION Cr 773.50
TBM #1
5/8" REBAR WITH ORANGE CAP, STAMPED "TRAVERSE LOCATED
3.9 FEET NORTH OF NORTH CURB LINE OF E. 96114 STREET AND
3.5 FOOT EAST OF A POWERPOLE GENERALLY ALONG THE
SUBJECT EAST LINE ELEVATION OF 756.88'.
TBM #2
MAG NAIL 39.7 FEET SOUTH OF 8" BLOCK WALL AND 21.5 FEET
EAST OF 8" BLOCK WALL CORNER. ELEVATION OF 756.04'.
SET POSTS AND
EXCAVATE A
4 "X4" TRENCH
UPSLOPE ALONG
THE LINE OF
THE POSTS.
ATTACH THE
FILTER FABRIC
TO THE WIRE
FENCING AND
EXTEND IT INTO
THE TRENCH
ELEVATION
OCT USED)
SILT FENCE
WIRE
FENCING
11
N u=1 4 u
•1 ..if':
10
1
FILTER
FABRIC
I Pri r 4 4 4 .4 4 17 P g. jo g' r cc i
i kika. !kir 4M 1,
EROSION CONTROL FIGHT-OF-WAY
1 THE AREA BEHIND THE CURB WILL BE SEEDED
FOR A DISTANCE OF 25 FEET ONCE THE CURB
HAS BEEN BACKFILLED.
Design BY
MFH
EROSION CONTROL PLAN
TOM WOOD SUBARU
City of CerrneL Clay TownsNp
Drawn By
MFH
1WW 11.
tI Z it
He mSon Coun
Checked By
AES
2H. THERE ARE NO KNOWN LOCATIONS WHERE
SURFACE WATER CAN ENTER THE GROUNDWATER. NO
HYDRIC SOILS ARE ON SITE.
3A. THE DISTURBED AREA OF THE PROJECT IS
APPROXIMATELY 500 FEET LONG BY 100 FEET WIDE.
THE SITE IS LOCATED IN CARMEL, IN. ON THE NORTH
SIDE OF EAST 96TH STREET BETWEEN THE CURRENT
TOM WOOD SUBARU DEALERSHIP AND THE PENSKE CAR
DEALERSHIP.
3B. THERE ARE NO STOCKPILE AREAS NOR BORROW
AREAS.
4A. SEE TABLE ON THIS SHEET FOR SEQUENCE OF
WORK.
4E. TEMPORARY EROSION AND SEDIMENT CONTROL
MEASURES ARE SHOWN IN THE PLAN VIEW (SEE LEGEND
THIS SHEET).
STAPLE THE
WIRE MESH
FENCING TO
EACH POST
BACKFILL THE
TRENCH AND
COMPACT THE
EXCAVATED SOIL.
Approved By
AES
PAVE>I ENT PREVENT
FLOW
V
SECTION
1. FILL GEOTEXTILE BAGS APPROXIMATELY HALF FULL
WITH 2 TO 3 INCH STONE OR GRAVEL.
2. OVERLAP BAGS AROUND INLET AND EXTEND A MIN-
IMUM OF 3 FEET AWAY FROM CASTING.
3. FOR ADDITIONAL LAYERS, OVERLAP BAGS WITH THE
ROW BENEATH, AND LEAVE A ONE -BAG GAP IN THE
MIDDLE OF THE TOP ROW TO SERVE AS A SPILLWAY.
4. PLACE BAGS IN AN ARC AROUND INLETS THAT
ARE IN A SUMP POSITION.
5. SET UP SAFETY /TRAFFIC BARRIERS TO KEEP VEHICLES
FROM HITTING BAGS, CAUSING POSSIBLE INJURY.
6. INSPECT AND REPAIR AS NEEDED, AND REMOVE ANY
ACCUMULATED SEDIMENTS AFTER EVERY STORM.
INLET PROTECTION DETAIL
EROSION CONTROL BLANKET
WITH AMERICAN GREEN S150
OR EQUAL FOR SECURING THE
BLANKET. USE USE EROSION
CONTROL BLANKET.
DETAIL E /C204
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING
APPLICATION OF LIME, FERTILIZER AND SEED.
2 BEGIN AT THE TOP aF THE CHANNEL BY ANCHORING THE
BLANKET IN A 6" DEEP x 6" WIDE TRENCH BACKFILL AND
COMPACT THE 7RENCN AFTER STAPUNG.
3. ROLL CEAITER BLANKET IN DIRECTION OF WATER FLOW ON
BOTTOM OF CHANNEL
4. PLACE BLANKETS END OVER END (SHINGLE STYLE) IITH
A 5" OVERLAP. USE A DOUBLE ROW OF STAGGERED STAPLES
4" APART TO SECURE BLANKETS.
"DON'T DIG BLIND"
"IT'S THE LAW"
VARIES, SEE GRADING PLAN
Atftie
140111111111116 .41111
INDIANA INIMOIQIQAO PIe01EC11ON sun= INC.
CaII 1
NOTES FOR INSTALLATION
(sWALE)
TYPICAL SECTION
falcon
ENGINEERING, INC.
13110 Promise Road, Noblesville, IN 46060
Phone: (317) 841 -3141 Fax: (317) 841 9951
2 Working Days
Before You Dig.
FABRIC OVER 7NE CASTING INLET
SAND BAGS
's,' v
"s,' v
vv \/vv
v v v v v v
vvvv No" v
v v v v
vv�v
v v
PROPOSED GRADE
TOP VIEW
Job No.
SAND BAGS
CONTRACTOR SMALL SURROUND ALL E)USTIVG
DRAINAGE STRUCTURES W/ SAND BAGS
THESE SILT CONTROL DEWCES WILL BE
MAINTAINED BY 7HE CONTRACTOR UNTIL
EN( ER AUTHORIZES REMOVAL.
WHERE STRUCTURE'S ARE PLACED IN PAVED
SURFACE AREAS, EROSION CONTROL MEASURES
CAN BE REMOVED WHEN PAVING IS STARTED IN
THE AFFECTED AREA.
5. FULL LENGTH OF BLANKETS AT TOP OF SIDE SLOPES
MUST BE ANCHORED IN 6" DEEP x 6" WIDE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
6. BLANKETS ON SIDE SLOPES MUST BE OVERLAPPED 4"
OVER THE CENTER BLANKET AND STAPLED.
7. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED
IN A 6 DEEP x 6" WIDE TRENCH. BACKFILL AND COMPACT THE
TRENCH AFTER STAPUNG.
Date October 13, 2003
03-15
1" 20'
Sheet No' 5 OF 10
NOTE: DRAWING IS FOR EROSION CONTROL ONLY
20
1
07
Construction Entrance
Gmv- lor '3
GRAPHIC SCALE
20
40
1 W4We+
brimplaturigiii
SF
IN FEET
1 inch 20 ft.
LECIEND
AREAS TO BE SEEDED BLANKETED OR HYDRO SEEDED
(NOT USED)
AREAS TO BE SODDED OR SEEDED W/ PERMANENT SEED
GRAVEL ENTRANCE
SILT FENCE
INLET SEDIMENT PROTECTION (SEE DETAIL)
END SECTION SEDIMENT PROTECTION (SEE DETAIL)
EROSION CONTROL UEAUJFEB AID► ScHEDU.E
1 CONTRACTOR SHALL INSTALL ALL REQUIRED SILT FENCES
SILT TRAPS AND INLET PROTECTION FOR EXISTING INLETS
PRIOR TO THE START OF ANY EARTH MOVING OR STRIPPING.
2. CONTRACTOR SHALL INSTALL SAND BAGS ALONG THE
BUILDING OR SOME OTHER APPROVED EROSION CONTROL
PRIOR TO THE START OF EARTHWORK AS NECESSARY TO
PREVENT SOIL FROM BEING TRACKED OR WASHED ONTO
EXISTING ROADWAYS OR PAVEMENTS.
3. LAND ALTERATIONS WHICH STRIP THE LAND OF
VEGETATION, INCLUDING REGRADING, SHALL BE DONE
IN A WAY THAT WILL MINIMIZE EROSION, WHENEVER
POSSIBLE, NATURAL VEGETATION SHALL BE RETAINED
AND PROTECTED. WHEN GRADING IS COMPLETED, INSTALL
SILT TRAPS, SILT FENCES, SLOPE DRAINS, TEMPORARY
DIVERSIONS AND OTHER RUNOFF CONTROL MEASURES
AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT
CONTAINED ON SITE.
4. ALL DISTURBED AREAS SHALL BE SEEDED AND STRAW
MULCHED AS SHOWN ON THE PLANS IMMEDIATELY AFTER
COMPLETION OF GROUND ACTIVITY.
5. PERMANENT AND FINAL VEGETATION EROSION CONTROL
DEVICES SHALL BE INSTALLED AS SOON AS PRACTICAL.
6. THE DURATION OF TIME WHICH AN AREA REMAINS
EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM
DEPENDING UPON THE WEATHER. IF CONSTRUCTION
ACTIVITY IS TO CEASE FOR MORE THAN TWO WEEKS,
THE DISTURBED AREAS SHALL BE TEMPORARILY SEEDED.
7. ALL STORM SEWER INLET PROTECTION DEVICES SHALL
BE PUT IN PLACE AT THE TIME EACH INLET IS CONSTRUCTED.
8. CONTRACTOR SHALL MAINTAIN EROSION CONTROL
MEASURES AND DEVICES DURING CONSTRUCTION AND
UNTIL SILTATION OF THE STREETS AND STORM SEWERS
WILL NO LONGER OCCUR.
9. ONCE ONSITE EROSION AND SILTATION OF THE STREETS
AND STORM SEWERS WILL NO LONGER OCCUR. THE
CONTRACTOR SHALL REMOVE AND DISPOSE OF THE
TEMPORARY EROSION CONTROL DEVICES.
10. THESE GENERAL PROCEDURES MAY NOT COVER ALL
SITUATIONS. REFER TO EROSION CONTROL PLANS FOR
SPECIFIC NOTES AND ADDITIONAL DETAILS.
11. EROSION CONTROL IS TO COMPLY WITH INDIANA 327
IAC AND RULE 5, AND INDIANA HANDBOOK FOR EROSION
CONTROL IN DEVELOPING AREAS.
12. THE CITY ENGINEER HAS THE AUTHORITY TO REQUEST
ADDITIONAL EROSION CONTROL MEASURES OR AMEND EROSION
CONTROL PLANS SUBJECT TO ACTUAL. SITE CONDITIONS.
ti
1 IV(
,,A. 0 44
44k$ dis
44, 4t
i*
40011001
*Atoka
'111/ 111/1110 4 117.N., /0 4
ii;
vino
4
tot 4ifri
4‘
.1 4
r'�III!
j r i4llOO,MMIKA IYlaMINI
wre-mor
r 44; 4/
K .4‘
OP ..4.
Velifrk **/744-
r l e
4 t
41/41044
1 4 04 0?
issa
lim
80
Silt Fence
Silt Fence
EROSION CONTROL MEASURES LIAII IANC E REQ
Existing Conditions
Developed Car Lot
\At11 1 kk11i /i
E. S
d� r -i
No.
y 880573
STATE OF
SS /ON A .S 1 2/29/03
�lllkli{1
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS
1. INSPECT TEMPORARY SEDIMENT TRAP AFTER EACH STORM EVENT.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. PROMPTLY REPLACE ANY DISPLACED RIPRAP.
6. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE
AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS
1. INSPECT CURB INLET SEDIMENT BARRIER PERIODICALLY AND AFTER EACH STORM
EVENT AND REPAIR IF NEEDED.
2. REMOVE SEDIMENT WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF
THE BARRIER.
3. DEPOSIT SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS.
STRAW BALE DAM MAINTENANCE REQUIREMENTS
1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
/-2
SILT FENCE MAINTENANCE REQUIREMENTS
1. INSPECT SILT FENCE AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS OR BECOMES INEFFECTIVE, REPLACE THE AFFECTED AREA
IMMEDIATELY.
3. REMOVE SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST
POINT OR IS CAUSING THE FABRIC TO BULGE.
4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
FENCE AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
EROSION CONTROL BLANKET MAINTENANCE REQUIREMENTS
1. INSPECT EROSION CONTROL BLANKET PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF ANY AREA SHOWS EROSION, ADD SOIL AND RE -SEED THE AREA, RE -LAY AND STAPLE
THE BLANKET.
3. AFTER VEGETATIVE COVER IS ESTABLISHED, CHECK THE AREA PERIODICALLY.
TEMPORARY CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE WEEKLY AND AFTER EACH STORM EVENT OR HEAVY USE.
2. RESHAPE ENTRANCE AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. ADD CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY
BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED
INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
Existing Conditions
Developed Car Lot
Existing Conditions
Developed Car Lot
TEMPORARY:
WHEAT OR RYE
OR, SPRINS OATS
DORMANT SEEDING:
TO BE USED DURING PERIODS WHEN
SOIL TEMPERATURES ARE TOO LOW
FOR SEED GERMINATION, (±50° F.
APPROX. NOV 15 THRU FEB IN IND.)
DURING THIS PERIOD, IF SOIL TEMP.
IS BELOW 50', APPLY SEED
MULCH AS USUAL. IF SOIL TEMP IS
ABOVE 50`, MULCH, THEN APPLY
SEED OVER MULCH WHEN SOIL TEMP
IS BELOW 50'. INCREASE SEEDING
RATES 50
2 -3" WASHED STONE
(INDOT CA. #2)
MINIMUM LENGTH 50'
n
STONE DFIVE ENTRANCE DET'AL
SEED IuIXTURE'E
2 BU /AC
3 BU /AC
12' MIN.
SYNTHETIC FLIER F I C FECNI1313118
PERMANENT:
LAWN AND HIGH MAINTENANCE
KENTUCKY BLUEGRASS
CREEPING RED FESCUE
OR, PERENNIAL RYEGRASS
(TURF TYPE)
AND, WHEAT OR RYE
ALTERNATE SEED MIXTURE FOR
KENTUCKY BLUEGRASS
SMOOTH BROME GRASS
SWITCH GRASS
TIMOTHY
PERENNIAL RYEGRASS
(TURF TYPE)
WHITE OR LADINO CLOVER
RYE, WHEAT OR OATS
AREAS:
40 LB /AC
40 LB /AC
170 LB /AC
2 BU /AC
DRAINAGE AREAS:
20 LB /AC
10
4
10
1 -2
2 BU /AC
FERTILIZE W /1000 LB 12 -12 -12 /ACRE MULCH WITH 1 1/2 TO 2 TONS STRAW PER ACRE
MATERIALS
1. SYNTHETIC FILTER FABRIC SHOULD BE A PERIVOUS SHEET OF PROPYLENE,
NYLON, POLYESTER OR ETHYLENE YARN AND SHOULD BE CERTIFIED BY THE
MANUFACTURER OR SUPPLIER AS CONFORMING TO THE FOLLOWING REQUIREMENTS:
2. BURLAP SHOULD BE 10 OUNCE PER SQUARE YARD FABRIC.
3. POSTS FOR FILTER FENCES SHOULD BE EITHER 4" DIAMETER WOOD OR 1.33 POUNDS
PER LINEAR FOOT STEEL WITH A MINIMUM LENGTH OF 5'. STEEL POSTS SHOULD
HAVE PROJECTIONS FOR FASTENING WIRE TO THEM.
4. STAKES FOR FILTER FENCES SHOULD BE 1 "X2" WOOD (PREFERRED) OR EQUIVALENT
METAL WITH A MINIMUM LENGTH OF 3'.
5. WIRE FENCES REINFORCEMENT FOR SILT FENCES USING STANDARD STRENGTH FILTER
CLOTH SHOULD BE A MINIMUM OF 42" IN HEIGHT, A MINIMUM OF 14 GAUGE AND
SHOULD HAVE A MAXIMUM MESH SPACING OF 6
CONSTRUCTION
1. THE HEIGHT OF THE BARRIER SHOULD NOT EXCEED 36" (HIGHER BARRIERS MAY
IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE).
2. THE FABRIC SHOULD BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH
OF THE BARRIER TO AVOID THE USE OF JOINTS. WHEN JOINTS ARE NECESSARY,
FILTER CLOTH SHOULD BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A
MINIMUM 6" OVERLAP, AND SECURELY SEALED.
3. POSTS SHOULD BE SPACED A MAXIMUM OF 10' APART AT THE BARRIER LOCATION
AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 12 WHEN EXTRA STRENGTH
FABRIC IS USED WITHOUT THE WIRE SUPPORT FENCE, POST SPACING SHALL NOT
EXCEED 6'.
4. A TRENCH SHOULD BE EXCAVATED APPROXIMATELY 4" WIDE AND 4" DEEP ALONG
THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER.
5. WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE
SHOULD BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY
DUTY 1" WIRE STAPLES, TIE WIRES OR HOG RINGS. THE WIRE SHOULD EXTEND INTO
THE TRENCH A MINIMUM OF 2" AND SHOULD NOT EXTEND MORE THEN 36" ABOVE THE
ORIGINAL GROUND SURFACE.
6. THE STANDARD STRENGTH FILTER FABRIC SHOULD BE STAPLED OR WIRED TO THE
FENCE, AND 8" OF THE FABRIC SHOULD BE EXTENDED INTO THE TRENCH. THE FABRIC
SHOULD NOT EXTEND MORE THAN 36" ABOVE THE ORIGINAL GROUND SURFACE. FILTER
FABRIC SHOULD NOT BE STAPLED TO EXISTING TREES.
7. WHEN EXTRA STRENGTH FILTER FABRIC OR BURLAP AND CLOSER POST SPACING ARE
USED, THE WIRE MESH SUPPORT FENCE MAY BE ELIMINATED. IN SUCH A CASE, THE
FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE POSTS WITH ALL OTHER
PROVISIONS OF ITEM NO. 6 APPLYING.
8. THE TRENCH SHALL BE BACKFILLED AND THE SOIL COMPACTED OVER THE FILTER FABRIC.
9. FILTER BARRIERS SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE,
BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED.
No.
Date
Revision
11 /19 /O,EVISION PER HCSWCD
TRENCH
4 "X4"
w BOSON CONTROL NARRATIVE
1 B. THE SITE PRESENTLY IS A CAR DEALERSHIP. THE
PROPERTY TO THE NORTH IS A CAR DEALERSHIP, THE
PROPERTY TO THE SOUTH IS A CAR DEALERSHIP, AND
A BANK. THE PROPERTY TO THE WEST IS A CAR
DEALERSHIP. THIS PROJECT WILL BE A CAR
DEALERSHIP
2A. THE EXISTING VEGETATION IS A MAINTAINED LAWN.
28. THIS PROJECT DRAINS THROUGH A ON SITE PIPE
SYSTEM TO THE EAST 96TH STREET ROAD SIDE DITCHES
AND FINALLY INTO THE HEAD WATER OF WHITE RIVER
WHICH IS THE RECEIVING WATER FOR THIS PROJECT.
2C. THERE ARE NO 100 YEAR FLOODPLAINS,
FLOODWAY FRINGES OR FLOODWAYS ON THIS SITE.
20. THE SOILS ON SITE CONSIST OF A DEEP MIAMI
COMPLEX WITH MISCULANIOUS ENGINEERING FILL ON
TOP. THE SITE WILL BE FILLED DURRING THE
CONSTRUCTION OF THE NEW BUILDING.
POS
FILTER
FABRIC
BENCHMARK
HAM G -30
A BRONZE PLATE SET IN SOUTH END OF THE %EST PARAPET OF
AN 18 FOOT SLAB TOP CULVERT. ALSO. 0.8 MILE NORTH OF
MARION- HAMILTON COUNTY LINE ON SR -431. 2.8 MILES SOUTH
OF SR -234. GREENFIELD DISTRICT. ELEVATION Cr 773.50
TBM #1
5/8" REBAR WITH ORANGE CAP, STAMPED "TRAVERSE LOCATED
3.9 FEET NORTH OF NORTH CURB LINE OF E. 96114 STREET AND
3.5 FOOT EAST OF A POWERPOLE GENERALLY ALONG THE
SUBJECT EAST LINE ELEVATION OF 756.88'.
TBM #2
MAG NAIL 39.7 FEET SOUTH OF 8" BLOCK WALL AND 21.5 FEET
EAST OF 8" BLOCK WALL CORNER. ELEVATION OF 756.04'.
SET POSTS AND
EXCAVATE A
4 "X4" TRENCH
UPSLOPE ALONG
THE LINE OF
THE POSTS.
ATTACH THE
FILTER FABRIC
TO THE WIRE
FENCING AND
EXTEND IT INTO
THE TRENCH
ELEVATION
OCT USED)
SILT FENCE
WIRE
FENCING
11
N u=1 4 u
•1 ..if':
10
1
FILTER
FABRIC
I Pri r 4 4 4 .4 4 17 P g. jo g' r cc i
i kika. !kir 4M 1,
EROSION CONTROL FIGHT-OF-WAY
1 THE AREA BEHIND THE CURB WILL BE SEEDED
FOR A DISTANCE OF 25 FEET ONCE THE CURB
HAS BEEN BACKFILLED.
Design BY
MFH
EROSION CONTROL PLAN
TOM WOOD SUBARU
City of CerrneL Clay TownsNp
Drawn By
MFH
1WW 11.
tI Z it
He mSon Coun
Checked By
AES
2H. THERE ARE NO KNOWN LOCATIONS WHERE
SURFACE WATER CAN ENTER THE GROUNDWATER. NO
HYDRIC SOILS ARE ON SITE.
3A. THE DISTURBED AREA OF THE PROJECT IS
APPROXIMATELY 500 FEET LONG BY 100 FEET WIDE.
THE SITE IS LOCATED IN CARMEL, IN. ON THE NORTH
SIDE OF EAST 96TH STREET BETWEEN THE CURRENT
TOM WOOD SUBARU DEALERSHIP AND THE PENSKE CAR
DEALERSHIP.
3B. THERE ARE NO STOCKPILE AREAS NOR BORROW
AREAS.
4A. SEE TABLE ON THIS SHEET FOR SEQUENCE OF
WORK.
4E. TEMPORARY EROSION AND SEDIMENT CONTROL
MEASURES ARE SHOWN IN THE PLAN VIEW (SEE LEGEND
THIS SHEET).
STAPLE THE
WIRE MESH
FENCING TO
EACH POST
BACKFILL THE
TRENCH AND
COMPACT THE
EXCAVATED SOIL.
Approved By
AES
PAVE>I ENT PREVENT
FLOW
V
SECTION
1. FILL GEOTEXTILE BAGS APPROXIMATELY HALF FULL
WITH 2 TO 3 INCH STONE OR GRAVEL.
2. OVERLAP BAGS AROUND INLET AND EXTEND A MIN-
IMUM OF 3 FEET AWAY FROM CASTING.
3. FOR ADDITIONAL LAYERS, OVERLAP BAGS WITH THE
ROW BENEATH, AND LEAVE A ONE -BAG GAP IN THE
MIDDLE OF THE TOP ROW TO SERVE AS A SPILLWAY.
4. PLACE BAGS IN AN ARC AROUND INLETS THAT
ARE IN A SUMP POSITION.
5. SET UP SAFETY /TRAFFIC BARRIERS TO KEEP VEHICLES
FROM HITTING BAGS, CAUSING POSSIBLE INJURY.
6. INSPECT AND REPAIR AS NEEDED, AND REMOVE ANY
ACCUMULATED SEDIMENTS AFTER EVERY STORM.
INLET PROTECTION DETAIL
EROSION CONTROL BLANKET
WITH AMERICAN GREEN S150
OR EQUAL FOR SECURING THE
BLANKET. USE USE EROSION
CONTROL BLANKET.
DETAIL E /C204
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING
APPLICATION OF LIME, FERTILIZER AND SEED.
2 BEGIN AT THE TOP aF THE CHANNEL BY ANCHORING THE
BLANKET IN A 6" DEEP x 6" WIDE TRENCH BACKFILL AND
COMPACT THE 7RENCN AFTER STAPUNG.
3. ROLL CEAITER BLANKET IN DIRECTION OF WATER FLOW ON
BOTTOM OF CHANNEL
4. PLACE BLANKETS END OVER END (SHINGLE STYLE) IITH
A 5" OVERLAP. USE A DOUBLE ROW OF STAGGERED STAPLES
4" APART TO SECURE BLANKETS.
"DON'T DIG BLIND"
"IT'S THE LAW"
VARIES, SEE GRADING PLAN
Atftie
140111111111116 .41111
INDIANA INIMOIQIQAO PIe01EC11ON sun= INC.
CaII 1
NOTES FOR INSTALLATION
(sWALE)
TYPICAL SECTION
falcon
ENGINEERING, INC.
13110 Promise Road, Noblesville, IN 46060
Phone: (317) 841 -3141 Fax: (317) 841 9951
2 Working Days
Before You Dig.
FABRIC OVER 7NE CASTING INLET
SAND BAGS
's,' v
"s,' v
vv \/vv
v v v v v v
vvvv No" v
v v v v
vv�v
v v
PROPOSED GRADE
TOP VIEW
Job No.
SAND BAGS
CONTRACTOR SMALL SURROUND ALL E)USTIVG
DRAINAGE STRUCTURES W/ SAND BAGS
THESE SILT CONTROL DEWCES WILL BE
MAINTAINED BY 7HE CONTRACTOR UNTIL
EN( ER AUTHORIZES REMOVAL.
WHERE STRUCTURE'S ARE PLACED IN PAVED
SURFACE AREAS, EROSION CONTROL MEASURES
CAN BE REMOVED WHEN PAVING IS STARTED IN
THE AFFECTED AREA.
5. FULL LENGTH OF BLANKETS AT TOP OF SIDE SLOPES
MUST BE ANCHORED IN 6" DEEP x 6" WIDE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
6. BLANKETS ON SIDE SLOPES MUST BE OVERLAPPED 4"
OVER THE CENTER BLANKET AND STAPLED.
7. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED
IN A 6 DEEP x 6" WIDE TRENCH. BACKFILL AND COMPACT THE
TRENCH AFTER STAPUNG.
Date October 13, 2003
03-15
1" 20'