Loading...
HomeMy WebLinkAboutpg. 07 C401 Street Plan & Profiles0.61% 0+50 11 II 124 I I' I OR DETAIL S SHT. #0403 0.60% 3 2+50 3 TA. 1+60.24 TA. 3 +19.33 N. CURVE DATA D =28 °38'42" R= 200.00' •L- 99.99' T= �i•, POINT OF CURV► STA. 7 +68.27 115 POINT OF TANGEN A. 6 +60.64 117 CURVE DATA D =7 °28'20" R= 400.00' L=52.17' 6.12' HEATHERMOOR PARK DRIVE NORTH o.60% 3 3+50 4+00 4+50 5 +00 5 1 96 60.65 1 0 71 1% 6+00 D CONSTRUCTION BEGIN CONSTRUCTION STA. 0+00 0 DATUM ELEV 900.00 0 +00 1 SCALE: 1 H OR. 1" =5' VERT. HEATHER V 0 +50 1+00 1+50 2 +00 2 +50 3 +00 3 +50 4 +00 4 +50 5 +00 5 +50 6 +00 6 +50 7 +00 7 +50 8 +00 OOR PAR LOW POINT ELEV 913.33 LOW POINT STA 5 +13.96 PVI STA 5 +15.65 PVI ELEV 913.26 A.D. 1.31 K 30.47 DRVF NOR HH 141 140 142 920 9100 0 z 0 U 0 CC H (n z 0 U z DATUM ELEV m 900.00 LOW POINT ELEV 912.85 LOW POINT STA 0 +54.93 PVI STA 0 +54.22 PVI ELEV 912.79 A.D. 1.18 K 34.03 40.00' VC 0) N N 0 0) 0 +00 0 +50 1+00 143 TERSECTION STA. 1 +30.08 STA. 9 +09.36 E. BEGIN CONSTRUCTION STA. 0 +00 SCALE: 1"=50' HOR. 1"=5 VERT. SHALLOW BROO CLOSE SCALE: 1"= 50' ,,,,11111M,,,,, STPp� �G1ST N o. •s= 193 STATE -o TE OF Q NDOE NOTE: THERE SHALL BE A 12" vlIN. COVER FROv1 TOP OF PIPE TO BOTTOM OF PAVEMENT ON ALL STREET PIPE CROSSINGS. 0 m W J 0 J Z cr Fi— W W m W v W 0 Q N II co SHEET NO. m W H Q 0 Q z a 0 z z Lt z_ D 0 Z 0 U r W V J 0 W 0 V1 W ch U CONSULTING ENGINEERS LAND SURVEYORS REVISIONS REVISED PER TAC COMMENTS r BVCS: 0 +1 BVCE: 91 z o o EVCS: 0+ m EVCE: 91. „�0 61 1 0.57% PROPOSED GRADE 0 12” F.C.P. INV.= 908.73± ZZ'17 L+ L 'V1S co o N 1- Q i— v) ZL'�L6 GRADE CHANGE J01103S831N1 I L'c L6 L671.6 L671.6 C9716 5 alb S0 L6 0.61% 0+50 11 II 124 I I' I OR DETAIL S SHT. #0403 0.60% 3 2+50 3 TA. 1+60.24 TA. 3 +19.33 N. CURVE DATA D =28 °38'42" R= 200.00' •L- 99.99' T= �i•, POINT OF CURV► STA. 7 +68.27 115 POINT OF TANGEN A. 6 +60.64 117 CURVE DATA D =7 °28'20" R= 400.00' L=52.17' 6.12' HEATHERMOOR PARK DRIVE NORTH o.60% 3 3+50 4+00 4+50 5 +00 5 1 96 60.65 1 0 71 1% 6+00 D CONSTRUCTION BEGIN CONSTRUCTION STA. 0+00 0 DATUM ELEV 900.00 0 +00 1 SCALE: 1 H OR. 1" =5' VERT. HEATHER V 0 +50 1+00 1+50 2 +00 2 +50 3 +00 3 +50 4 +00 4 +50 5 +00 5 +50 6 +00 6 +50 7 +00 7 +50 8 +00 OOR PAR LOW POINT ELEV 913.33 LOW POINT STA 5 +13.96 PVI STA 5 +15.65 PVI ELEV 913.26 A.D. 1.31 K 30.47 DRVF NOR HH 141 140 142 920 9100 0 z 0 U 0 CC H (n z 0 U z DATUM ELEV m 900.00 LOW POINT ELEV 912.85 LOW POINT STA 0 +54.93 PVI STA 0 +54.22 PVI ELEV 912.79 A.D. 1.18 K 34.03 40.00' VC 0) N N 0 0) 0 +00 0 +50 1+00 143 TERSECTION STA. 1 +30.08 STA. 9 +09.36 E. BEGIN CONSTRUCTION STA. 0 +00 SCALE: 1"=50' HOR. 1"=5 VERT. SHALLOW BROO CLOSE SCALE: 1"= 50' ,,,,11111M,,,,, STPp� �G1ST N o. •s= 193 STATE -o TE OF Q NDOE NOTE: THERE SHALL BE A 12" vlIN. COVER FROv1 TOP OF PIPE TO BOTTOM OF PAVEMENT ON ALL STREET PIPE CROSSINGS. 0 m W J 0 J Z cr Fi— W W m W v W 0 Q N II co SHEET NO. m W H Q 0 Q z a 0 z z Lt z_ D 0 Z 0 U r W V J 0 W 0 V1 W ch U CONSULTING ENGINEERS LAND SURVEYORS REVISIONS REVISED PER TAC COMMENTS