Loading...
HomeMy WebLinkAboutpg. 03 Demolition Plan5/3 Bank Canopy Addition 11590 North Meridian Street Indianapolis, Indiana $;2 1 Af cG iSTF �p �i 00 No. N49 990 E OF P fil j. f I 7 4 9 4 I 4 d 1 1 1.%itur June 22nd, 2004 Approved By: DSB Drawn By: MIS Date of Last Field Work: Date Plotted: Demolition Plan Benchmark Land Services, Inc. 9855 Crossp oin t Blvd., Suite 110 Indianapolis, IN 46256 Ph. 317 -841 -1506 Fax 317- 841 -1507 www. benchmarkls.com Notes: 1. The contractor shall conform to all local, state, and federal codes, obtain all permits, and give notices required for execution of the work. 2. All materials being removed and not relocated under the new construction, including trees, shrubs, signs, utilities, utility structures, etc., shall be first offered to the owner's representative and, if not accepted, shall be properly disposed of by the contractor. 3. The contractor is responsible for locating all charted and uncharted utilities. Take care to protect utilities that are to remain. Repair any damage to local standards and at the contractor's expense. Coordinate all construction with the appropriate utility company. 4. The contractor shall verify the limits of demolition with the owner's representative prior to commencement of work. 5. In areas where existing pavement, walks, or curbs are to be removed, saw cut to provide a clean edge. Coordinate extent of pavement demolition with the limit of new improvements on the site layout plan. 6. The contractor shall coordinate phasing of the demolition with the owner's representative, adjacent property landowners, utility regulations and local authorities, where appropriate, prior to beginning work. Disruption of the existing utilities shall be minimized to the extent possible and initiated only after approval by utility regulations and local authorities. 7. Cavities left by structure removal shall be suitably backfilled and compacted in accordance with these plans and specifications. 8. The contractor shall use water sprinkling and other suitable methods as necessary to control dust and dirt caused by demolition and excavation work. 9. The contractor is responsible for all demolition and removal necessary to accomplish the proposed improvements shown on these plans. 10. The contractor shall call the Indiana One Call System, Holey Moley, or other required utility location companies 72 hours prior to proceeding with any excavation. 11. The Contractor shall preserve and protect survey control points and shall be responsible for replacement of any disturbed control points. 12. If appropriate, existing trees to be preserved are to be appropriately barricaded prior to construction. Rev# Date Remarks CATCH BASIN [Ti TELEPHONE PEDESTAL LIGHT POLE SIGN 0 IRON PIN Sg GAS VALVE 0 GAS MARKER UGE UNDERGROUND ELECTRIC UGE UGT UNDERGROUND TELEPHONE UGT SANITARY SEWER Project 3 -337 [5/3 Bank] Sheet No. 3 of SYMBOL LEGEND E WATER VALVE O STORM SEWER MANHOLE IN CURB INLET XIC FIRE HYDRANT O SANITARY MANHOLE TREE I I CATCH BASIN [Ti TELEPHONE PEDESTAL LIGHT POLE SIGN 0 IRON PIN Sg GAS VALVE 0 GAS MARKER UGE UNDERGROUND ELECTRIC UGE UGT UNDERGROUND TELEPHONE UGT SANITARY SEWER SAN SAN 000> FLOWLINE GAS GAS LINE GAS STM STORM SEWER STM WTR WATER LINE WTR I PROPOSED RIGHT -OF -WAY FEATURE EXISTING FEATURE CONSTRUCTION SEQUENCE ACTIVITY APPROX. START DATE APPROX. COMPLETE DATE ASSUME START DATE SITE EXCAVATION UNDERGROUND UTILITIES STREET CONSTRUCTION FINAL GRADING EROSION CONTROL PLAN IMPLEMENTATION 10/15/04 +30 DAYS +30 DAYS +30 DAYS +60 DAYS +0 DAYS +60 DAYS +60 DAYS +60 DAYS +120 DAYS +120 DAYS