HomeMy WebLinkAboutpg. 03 Demolition Plan5/3 Bank Canopy Addition
11590 North Meridian Street
Indianapolis, Indiana
$;2 1
Af cG iSTF �p �i 00
No. N49
990
E OF P
fil j. f I 7 4 9 4 I 4 d 1 1 1.%itur
June 22nd, 2004
Approved By: DSB
Drawn By: MIS
Date of Last Field Work:
Date Plotted:
Demolition Plan
Benchmark Land Services, Inc.
9855 Crossp oin t Blvd., Suite 110
Indianapolis, IN 46256
Ph. 317 -841 -1506 Fax 317- 841 -1507
www. benchmarkls.com
Notes:
1. The contractor shall conform to all local,
state, and federal codes, obtain all permits, and
give notices required for execution of the work.
2. All materials being removed and not
relocated under the new construction,
including trees, shrubs, signs, utilities, utility
structures, etc., shall be first offered to the
owner's representative and, if not accepted,
shall be properly disposed of by the contractor.
3. The contractor is responsible for locating all
charted and uncharted utilities. Take care to
protect utilities that are to remain. Repair any
damage to local standards and at the
contractor's expense. Coordinate all
construction with the appropriate utility
company.
4. The contractor shall verify the limits of
demolition with the owner's representative
prior to commencement of work.
5. In areas where existing pavement, walks, or
curbs are to be removed, saw cut to provide a
clean edge. Coordinate extent of pavement
demolition with the limit of new improvements
on the site layout plan.
6. The contractor shall coordinate phasing of
the demolition with the owner's representative,
adjacent property landowners, utility
regulations and local authorities, where
appropriate, prior to beginning work. Disruption
of the existing utilities shall be minimized to
the extent possible and initiated only after
approval by utility regulations and local
authorities.
7. Cavities left by structure removal shall be
suitably backfilled and compacted in
accordance with these plans and specifications.
8. The contractor shall use water sprinkling and
other suitable methods as necessary to control
dust and dirt caused by demolition and
excavation work.
9. The contractor is responsible for all
demolition and removal necessary to
accomplish the proposed improvements shown
on these plans.
10. The contractor shall call the Indiana One
Call System, Holey Moley, or other required
utility location companies 72 hours prior to
proceeding with any excavation.
11. The Contractor shall preserve and protect
survey control points and shall be responsible
for replacement of any disturbed control
points.
12. If appropriate, existing trees to be preserved
are to be appropriately barricaded prior to
construction.
Rev#
Date
Remarks
CATCH BASIN
[Ti
TELEPHONE PEDESTAL
LIGHT POLE
SIGN
0
IRON PIN
Sg
GAS VALVE
0
GAS MARKER
UGE UNDERGROUND
ELECTRIC
UGE
UGT UNDERGROUND
TELEPHONE
UGT
SANITARY SEWER
Project
3 -337 [5/3 Bank]
Sheet No.
3 of
SYMBOL LEGEND
E
WATER VALVE
O
STORM SEWER MANHOLE
IN
CURB INLET
XIC
FIRE HYDRANT
O
SANITARY MANHOLE
TREE
I I
CATCH BASIN
[Ti
TELEPHONE PEDESTAL
LIGHT POLE
SIGN
0
IRON PIN
Sg
GAS VALVE
0
GAS MARKER
UGE UNDERGROUND
ELECTRIC
UGE
UGT UNDERGROUND
TELEPHONE
UGT
SANITARY SEWER
SAN
SAN
000>
FLOWLINE
GAS GAS LINE
GAS
STM STORM SEWER
STM
WTR WATER LINE
WTR
I PROPOSED
RIGHT -OF -WAY
FEATURE
EXISTING FEATURE
CONSTRUCTION SEQUENCE
ACTIVITY
APPROX.
START DATE
APPROX.
COMPLETE DATE
ASSUME START DATE
SITE EXCAVATION
UNDERGROUND UTILITIES
STREET CONSTRUCTION
FINAL GRADING
EROSION CONTROL PLAN
IMPLEMENTATION
10/15/04
+30 DAYS
+30 DAYS
+30 DAYS
+60 DAYS
+0 DAYS
+60 DAYS
+60 DAYS
+60 DAYS
+120 DAYS
+120 DAYS