HomeMy WebLinkAboutC103 Erosion Control PlanTHIS SHEET TO BE USED FOR EROSION CONTROL ONLY. GRAPHIC SCALE E IN FEET 1 inch 50 ft. Rock check dam The following is a list In sequence of construction activities to control soil erosion: 1. The contractor shall schedule a Pre—construction meeting with the Hamilton County Soil end Water Conservation District prior to any construction on the site being started. 2. The construction entrance installed. 3. Silt fencing for entire project installed 4. Maintenance and Refueling area constructed 5. Concrete washout area constructed 6. Posting information area shall be constructed. All items, as outlined in the in the O&M manual for Post Cwnatuct|un water quality measures shall be placed in this area, 7. Grade the site (sides of awo|em, mounds and ponds to be seeded and mulched immediately upon completion). Temporary seeding shall be recommended for all mwolmo and disturbed areas that cannot be final seeded within a time period that will prevent slope erosion. For temporary seeding, the contractor shall utilize a fast growing seed of either motm, onnuuJ-ryagrooa, wheat or rye depending on time of year. Disturbed areas should be kept to a minimum at o|| times. 8. Storm inlets are to be protected immediately after installation. 9. Contractor shall control mud accumulation on all streets surrounding project by installing stone surface at all locations where construction traffic leaves the site. Dust shall be kept to a minimum by utilizing sprinkling, Calcium Chloride, Vegetative cnvar, spray on adhesives or other approved methods. 10. Maintain all filters and traps during construction to prevent any blockages from accumulated sediment. Additional seeding and straw bales may be required during construction as specified by Engineer or Soil Conservation Service. Payment for additional straw bales shall be at the contractor's expense. Payment for additional rip—rap (not shown on plans) and seeding shall be paid for on a unit basis. 11. Contractor shall Install all sanitary mwworm, storm aewura, subsurface drains, and water mains. Straw bale filters shall be installed at all storm Inlets (including street Inlets). Denotes permanent seeding mulch areas Seeding rote: 130#/acre or 301000 S.F. Seeding mixture: 25% creeping toll fescue 35% perennial rye 40% Kentucky bluegrass Denotes 50 by North America Green Seeding rote: 110#/acre or 2.501000 S.F. Seeding mixture: 38% Ken 19% perennial rye 19% annual rye 14% orchard grass 10% Kentucky bluegrass Denotes temporary seeding mulching. Seeding rote: 50 Seeding mixture: mo% perennial rye. Curb inlet Temporary straw bale darn to be removed during blanket Stone bags shall be placed around curb inlets. Silt Soc shall be used for inlets In Inverted Crown Conditions. 1111111111111 1111111111111111 1111111111111111 11111111111111 Silt Fence $wodbed PrepuroLion for Permanent 5mmding 1. Test soil to determine pH and nutrient levels. (Contact you county SWCD or Copperative Extension office for assistance and soils |nlornnmt|mn including available testing services.) 2. If soil pH is unsuitable for the species to be seeded, apply lime according to lest recommendations. 3. Fertilize as recommended by the soil test. if testing was not done, consider applying 4-OO-8OO \bo./ocre of 12-12-12 ono|ya(a, or equivalent, fertilizer. 4. Till the soil to obtain a uniform seedbed, working the fertilizer and lime into the soil 2-4 In. deep with a disk or rake operated across the slope. -r r 1 +f++++++" EROSION CONTROL MEASURES MAY BE REQUIRED BY THE HAMILTON COUNTY SURVEYOR'S 4. 4. 4 I 4. 4 r 4. 4 4 4 4. 4 .14. +++++++++++++r .�r�,r°�,~~ 4 4. 4. +0 w�^ �c ~�v��}�k v 4 4. •4• n �m� +����x, ,w '-��°��r�. ����J~ m~ r ,s_.„,..ort.,,,,,--. �mm~��� _-y u 4 *n, 4 4. 1* V 4,F14:"' I/4 44 9 0. faci, ii Igi ,,s, foot v:f.... 4 ;4,. )0 A iv, cp '7 3 ,SILT :FENCE EARTHWORK CONTRACTOR SHALL INSTALL STONE ACCESS DRIVE ENTRANCE� CONSTRUCTION. cs SAYS: /_800_382_5544 CALL TOLL FREE /-8�O—���—��D� CAUTION LOCATION OF' ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND EVIDENCE. (including, but not limited to, manholes, inlets, valves, AR mo c rk s s p m ec o u d iA e BE OTHER UISMNG UNDERGROUND UTILIDTES FOR WIIICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND UTILITIES SHOULD BE VERIFIED BY THE CONTRACTOR PRIOR TO ANY AND AU. CONSTRUCTION. OF lz un U JOB NO. en o SHEET NO. SHEETS co 0 0 C103