Loading...
HomeMy WebLinkAbout03100015 Congressional Flex Space Carmel Science & Tech Park, Site Construction Plan pg. 052 844A0 843.90 844.00 843.50 Pt1.E.G. 844.42 843.92 844.20 843.7 845.03 840.53 84453 844.58 844.95 8 40.70 844.45 w o 844.20 8 4. 8 840. 40 1 1 844,15 :$X3.65 43.65 840.70 844.,61. 843.00 843.19 842.69 842.50 841.35 840.20 843.29 841., -50 843.00 842.25 842.64 '843.50 84!4 00 842.75 843.00 839.40 845.03 840.53 844.53 840.70 844.45 844.15 843.65 843.65 iii 844.00 843.00 842.50 ri 842.15 845.11 840.53 844.35 845.11 840.70 844.35 84,5'.11 841.52 6 840.55 842.25 842.53 843.46 j 843.8E1 1 844.00 844.14 844.64 843:/5 843.25 43.25 845.11 840 842.63 843.75 843.25 843.25 844.20 843.70 844.20 843.70 843.25 843.35 $45Y1 ::$41.52 843.75 843.25 843.25 843.75 843.25 843.25 844.61 844.39 44.40 44.10 844.89 840.70 844.8 840.7 844.39 845.00 840.53 844.50 S8 8-° 49'10,""M. 1844.00 1843.45 845.11 844.61 844.35 844.25 843. 0 843.80 43:90 ___.0 _843:62 842.95 8-4.3.30 844.35 845.11 844.61 845.11 840.70 844.61 845.11 40:70 844 -:61_ MM 844.20 BUILDING THREE 12,406 S.F. FFE 844.70 843.80 843.50 1844.00 1844.35 844.35 ASPHALT PATH 843.75 1843.40 T "YP 843.30 84.20 1 84,2.40 842.64 8 843.25 842.75 843.40 844.20 843.70 843.70 111 843:5 843:0 841.80 1 841.14 843.50 843.0 842. 4 840.65 840.30 1 11 f 1 ii 1 1 1 9 i 1 t 9i 1 840.1 841.25 840;10 839.25 834,35 84Q.10 838.00 838".601 844.20 43.70 VARIES PARKING LOT GRADING TYPICAL SECTION VARIES EXISTING PROPOSED BENCHMARK NOTE GRADING GENERAL NOTES: 1 -800 -382 -5544 CALL BEFORE YOU DIG LEGEND STORM MANHOLE, YARD DRAIN, CLEAN -OUT SANITARY MANHOLE STORM SWALE EXISTING GRADE CONTOUR GRADING BOX HIGH POINT STRUCTURE NO. STRUCTURE NO. FLOW DIRECTION PROPOSED FINISHED FLOOR 886.50 886.00 843.20 842.25 842.00 886.00 (STORM) (SANITARY) F.F.E. 896.80 TBM 111 1094 -01 FND. CUT '0' TOP EAST FACE OF LITHE POLE CONCRETE BASE; LOCATED 300' SOUTH OF CARMEL DRIVE, ON WEST SIDE OF ASPHALT DRIVE AND AT SE CORNER OF #1185 CARMEL DRIVE LOT 3, OUTLOT 17 IN CARMEL SCIENCE TECHNOLOGY PARK. ELEVATION 847.83 NW CORNER TRANSFORMER PAD LOCATED 40' SOUTH OF THE CENTERLINE OF 122nd STREET AND 50' +1- WEST OF THE CENTERLINE OF CONGRESSIONAL BOULEVARD. ELEVATION 843.80 1 THE COMRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 2. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS ANDOR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 3. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS AFTER INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY "BIRD BATH" CONDITIONS. TOP OF CURB DOCK GRASS /GROUND 4. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (location, size, and depth) SHALL BE MADE BY THE APPROPRIATE UTILITY' COMPANIES. WHEN EXCAVATING IS AROUND OR OVER EXISTING UTIUTIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE OF THAT UTILITY COMPANY CAN BE PRESENT TO INSTRUCT AND OBSERVE DURING CONSTRUCTION. 5. ALL PROPOSED SPOT ELEVATIONS ARE THE ANAL PAVEMENT AND FINAL GRADE ELEVATIONS. TOP OF CURB BOTTOM OF CURB 6. TRENCHES FOR ALL STORM PIPES ARE TO BE BACKFILLED COMPLETELY WITH ENGINEERED GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT. 7. SEE APPROPRIATE DETAILS TO DE i ERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE ELEVATIONS INDICATED. 8. CONTACT UTILITY COMPANIES PRIOR TO REMOVAL OR ABANDONING OF ANY EXISTING UTILITY UNE. 9. SEE SHEET 4 FOR SITE PLAN. 10. SEE SHEET 6 FOR UTILITY PLAN. SHEET NO. 1107(mie CD U a) U DATE: 03 SCALE: 1" =30' G W- oy W 0 z act( J CL. CD z cD occc CD j o a i w 2:1i; CL o.m Q3 z Q Q o =z W Cr e C <05 co d- PROJECT NO. 122 -0146 0146- g1.DGN