HomeMy WebLinkAbout03100015 Congressional Flex Space Carmel Science & Tech Park, Site Construction Plan pg. 07EROSION CONTROL SCHEDULE
EROSION CONTROL MEASURE
MAINTENANCE
INSTALLATION SEQUENCE
STONE ENTRANCE
AS NEEDED
PRIOR TO CLEARING AND GRADING
SILT FENCE
WEEKLY, AFTER STORM EVENTS, AND AS NEEDED
PRIOR TO CLEARING AND GRADING
EXISTING INLET PROTECTION
WEEKLY, AFTER STORM EVENTS, AND AS NEEDED
PRIOR TO CLEARING AND GRADING
TREE PROTECTION
WEEKLY, AFTER STORM EVENTS, AND AS NEEDED
PRIOR TO CLEARING AND GRADING
TEMPORARY DIVERSIONS
WEEKLY, AFTER STORM EVENTS, AND AS NEEDED
ALONG WITH ROUGH GRADING
TEMPORARY SEEDING
WATER AS NEEDED
AFTER ROUGH GRADING
PERMANENT SEEDING
WATER AS NEEDED
AFTER FINISH GRADING
EROSION CONTROL MATTING
WEEKLY, AFTER STORM EVENTS, AND AS NEEDED
AFTER FINISH GRADING
STRAW BALES
WEEKLY, AFTER STORM EVENTS, AND AS NEEDED
AFTER FINISH GRADING
INLET PROTECTION
WEEKLY, AFTER STORM EVENTS, AND AS NEEDED
AFTER EACH INLET IS PLACED
SEED, SOD LANDSCAPE AROUND
WATER AS NEEDED
AFTER FINISHED GRADING AROUND FINISHED UNITS
UNITS FINISHED
REMOVAL OF STRAW BALES
WA
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABIUZED
REMOVAL OF INLET PROTECTION
WA
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE
WA
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
BOTTOM OF
DITCH
M, r M
Ater
DITCH CHECK
1
1
r
1
1
1
1
1
1
1
1
1
1
r.
f
1
r
1
1
1
1
1
1
1
1
1
J
1
1
1
1
1
1
1
1
11
GROUND
UNE
POST
SILT FENCE DETAIL
NO SCALE
SLOPE CHECK
FABRIC
BACKFILL
FLOW
"I EXISTING SOIL
6 "x6" TRENCH
FILTER FABRIC
EXTENDS INTO TRENCH
Q
1 -y
Lri
1 k 18" RCP
■111111111111/111111111►
■N•111111111•1111111i,
■iuiui'iva1
111111M111•■/11111/
1111111111■111111111111
•ui•amivai
■1■11111■111111111111
1111111111111//111111
WHEN JOINING TWO OR MORE
SILT FENCES TIE THE TWO
END POSTS TOGETHER WITH
EXISTING NYLON CORDS
JOINING FENCES
122nd Street
TEMPORARY
CONSTRUCTION ENTRANCE
11
11
NO SCALE
1 I
16".W__ 00'
BUILDING TWO
19,270 S.F.
FFE 844.70
w l
w 1w
(Itt, a 1 w J, w w w
w It w w w w
w w w w w
w w w
4 J, w
w L,,
a U F t,FAS i t r' 4 4 4 4, y a .v w J, w
J. w
w I
ACK W ski
w lw\ w
20' BU�ILDItiG SETQ
\w w�� l �w
4 I IV Iw
Iy 1
1 1
I
CO aID 0 0
P
w J, w w w w w w w w w w
w w w w w w w w w w w w w
w w w w
w w w
DIMPST
I ,',R
BUILDING THREE
12,406 S.F.
FFE 844.70
!!1 w E w w Jic. E 4 w w w w w J>-- w w w w w w J, w w J, w w J' Jr w w w w w w w w w w J, w w ale w w w w w w w w w
J/ w w w *J. J! w 4 w
w w .t, w w w w
w w w .t, w w w
w w w w w w w
w w w
w w w w W
w w w .t, w
w
w w
w
w w w w w J, w w w w w J
w w w w J w w '4 J. w w w w
w w w w w J, w J, w w
w w w w w .t' w w J. J, w w w J, w w w
NI, i, w w Jr w w w w J' w J, .t, J, w 4 w
w Jr w w w w w w Jr 4 w w
NI, w
w
4, LL
lw Iw
1, 4,1 wIi
la wII
I I 1 I I'
I
o f l t 1 II
I 1 fI
I I I 1 J 1
I I l 1
f I I 1 w l w
I I 1 1 1 w
1 1 l
01 w�w
I l i wII w
I'I'
I\ I'C
\1
v '1 3!
w I (w
1 w I
I
o I w w
I 1 J
.J✓ Jul ,w
r s t 1111111111' A r r �T'
-r r MINI r r r
w w w w
w .t.
w w '4, w t. w w 4c_ �w t, S w w
a i w w w w J, w w w J, w w 4 _ale- -a.
w v a w •v 4 4 w w w
tI~� 14 w w w w .a, w w Tw w w 4 1�A
ONSTRUCTI o N-
w w w w g w w w w w w J,
w w 1 w w -w 't4 i w- 'i, w
l.- ..,s, r m i' t. w t w w w w
w w w d. yr w\ w\ w\ _..•s._ w w
/'10' SIDE/REAR YARD SETBAC
--r_, G i---- i 6'- --T-1 i,,
r r r"r..., MIMI i r r- LAM =1111111
w 4. w w w w ,,,,4- w .t, w w w w
w w w w i ,.w ^^.r, .t, w .t, w w .t, w w w w 9 w 4 w
‘1 .Ya w W w w w w w w-
--^Y Q NG w'
J, ---4.-__ w w
w w w w 4 w w w w w, w w w w w w w w w w w w ,k
w w w .4 4. w .47 w w
r
EXISTING
0 0 0
N
LEGEND
STORM MANHOLE, YARD
DRAIN, CLEAN -OUT
SANITARY MANHOLE
STORM SWALE
FILTER FABRIC INSERT
STRAWBALE MH PROTECTION Ck
SILT FENCE
TEMPORARY SEEDING
CONSTRUCTION LIMITS
NOTE: SEE DETAIL SHEET FOR ADDITIONAL EROSION CONTROL DETAILS
11L" 1,
2
11:
I�
-.a
PROPOSED
0 0 0
w w w
w w w w
w w w
J, Jr w J.
MEM
w
N
MINI MI
t
I
\j/
I
I
i
I�
5'r ;RCP
v
I it
7
EROSION CONTROL NOTES
1. CONSTRUCTION ACTIVITY TO INCLUDE BUILDING PARKING LOT.
2. THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING EROSION AND
SEDIMENT MIGRATION FROM THE SITE.
3. EXISTING VEGETATIVE COVER SHALL BE PRESERVED IN AREAS NOT
DISTURBED BY CONSTRUCTION ACTIVITY.
4. ALL DISTURBED AREAS SHALL BE TEMPORARILY SEEDED IMMEDIATELY
UPON COMPLETION OF ROUGH GRADING.
5. THE SITE IS NOT LOCATED IN A 100 -YEAR FLOOD PLAIN PER FEMA FLOOD
HAZARD BOUNDARIES.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER
STORM EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOP DRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED SWEEPING.
FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A
SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
SILT FENCE MAINTENANCE REQUIREMENTS
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE
FENCE AT ITS LOWEST POINT OR WHEN IT IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE
FENCE AND REPLACE SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO
GRADE, AND STABILIZE.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER
STORM EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOP DRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO
EXISTING STREETS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE
USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
STABILIZATION
PRACTICE JAN. FEB. MAR. APR. MAY JUN. JUL AUG. SEPT. OCT, NOV. DEC.
PERMANENT A /1/1/1/1 /1/1/ E I D
SEEDING
DORMANT
SEEDING
SEEDING
SODDING
MULCHING
B D
G
C
E ////1////
F 1/1/1/11 ///1/1/ CIF
A KENTUCKY BLUEGRASS 40 LBSIACRE; CREEPING RED FESCUE 40 LBS /ACRE;
PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE.
B KENTUCKY BLUEGRASS 60 LBS /ACRE; CREEPING RED FESCUE 60 LBSIACRE;
PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE.
C SPRING OATS 3 BUSHEUACRE
D WHEAT OR RYE 2 BUSHEUACRE
E ANNUAL RYEGRASS 40 LBSIACRE. (1 LB /1000 SQ. FT.)
F SOD
G STRAW MULCH 2 TONS /ACRE.
1 I 1 IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPT.
IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD.
SEASONAL SOIL PROTECTION CHART
SOILS LEGEND
Br
SOILS MAP
D D
Br Broodston Silty Clay Loam
CrA Crosby Silt Loam (0 to 2% slopes)
MmB2 Miami Silt Loam (2 to 6% slopes, eroded)
D
B D
omoromi
BENCHMARK NOTE
TBM #1
GENERAL NOTES:
"DON'T DIG BLIND"
1 800- 382 -5544
CALL BEFORE YOU DIG
SCALE 1" 30'
0' 30'
TBM 111- 1094 -01 FND. CUT '0' TOP EAST FACE OF LITHE POLE CONCRETE BASE;
LOCATED 300' SOUTH OF CARMEL DRIVE, ON WEST SIDE OF
ASPHALT DRIVE AND AT SE CORNER OF #1185 CARMEL DRIVE
LOT 3, OUTLOT 17 IN CARMEL SCIENCE TECHNOLOGY PARK.
ELEVATION 847.83
NW CORNER TRANSFORMER PAD LOCATED 40' +1- SOUTH
OF THE CENTERLINE OF 122nd STREET AND 50' +1- WEST OF
THE CENTERLINE OF CONGRESSIONAL BOULEVARD.
ELEVATION 843.80
1. EROSION CONTROL MEASURES SHALL BE ADHERED TO DURING ALL PHASES OF
CONSTRUCTION.
2. DISTURBED AREAS SHALL BE TEMPORARILY SEEDED IF SOIL IS TO BE LEFT
EXPOSED FOR LONGER THAN 7 DAYS. TEMPORARY SEEDING SHALL BE PER-
FORMED IN ACCORDANCE WITH THE SEASONAL SOIL PROTECTION CHART
HOWN ON THIS SHEET.
3. ALL EXISTING VEGETATION LOCATED OUTSIDE THE GRADING OR EARTHWORK
LIMITS IS TO REMAIN UNDISTURBED, AS DIRECTED BY THE OWNER
4. ALL FINAL GRADE AREAS WITHIN THE CONSTRUTION LIMIT SHALL BE PER-
MANENTLY SEEDED IN ACCORDANCE WITH THE SEASONAL SOIL PROTECTION
CHART. FURTHERMORE, PERMANENT SEEDING SHALL BE APPLIED ON ALL
DISTURBED AREAS WHERE ADDITIONAL WORK IS NOT EXPECTED FOR A PERIOD
OF MORE THAN ONE YEAR.
5. ALL SEEDING SHOWN ON THIS SHEET SHALL BE PERMANENT AND SHALL BE
DONE IN ACCORDANCE WITH THE SEASONAL SOIL PROTECTION CHART.
6. FOR SEEDING SCHEDULE AND EROSION CONTROL DETAILS, SEE THIS SHEET.
SOIL CONSERVATION SERVICES RULE 5
PROJECT INFORMATION:
1A. THE PROJECT LOCATION MAP IS LOCATED ON THE COVER SHEET.
1B. THIS PROJECT CONSISTS OF CONSTRUCTION OF IWO BUILDINGS SERVING
OFFOCE AND FLEX WAREHOUSE AND ASSOCIATED PARKING LOT.
1C. PLANNED ANI)OR EXISTING ROADS, UTILITIES AND STRUCTURES ARE
SHOWN ON PLAN SHEETS 3, 4 6.
1D. LAND USE OF ADJACENT AREAS:
NORTH: 122th STREET
SOUTH: DETENTION POND
EAST: CONGRESSIONAL BOULEVARD
WEST: COMMERCIAL SITE /WOODED AREA
2A. THE SITE CONSISTS OF GRASS AND BRUSH
2B. THERE IS NO DETENTION SYSTEM ON THE SITE.
2C. THERE ARE NO FLOODWAYS ON THIS PROJECT.
2D. SOILS INFORMATION IS PROVIDED ON THIS SHEET.
2E. EXISTING AND PROPOSED ELEVATIONS ARE SHOWN ON SHEET 5.
2F. EXISTING WATER IS COLLECTED BY SWALES AND ON-SITE SYSTEM
OF INLETS AND PIPES.
2G. THE ULTIMATE RECEIVING WATERS FOR THIS SITE IS W. R. FERTIG DRAIN.
2H. THERE ARE PROPOSED STORM WATER FACILITIES FOR THIS SITE.
21. STORM WATER SYSTEM LOCATION IS SHOWN ON SHEET 7.
3A. THE LOCATION AND DIMENSIONS OF THE LAND DISTURBANCE ACTIVITY
IS SHOWN ON THE COVER SHEET.
3B. THERE WILL BE NO STOCKPILES ANDOR BORROW AREAS UTILIZED
DURING CONSTRUCTION. ALL EXCESS SOIL SHALL BE UTILIZED IN FILL
PLACEMENT FOR CONSTRUCTION OF THIS PROJECT.
4A. DRAFT EROSION AND SEDIMENT CONTROL SEQUENCE FOR TYPICAL
COMMERCIAL CONSTRUCTION SITE
a). BEFORE CONSTRUCTION, EVALUATE, MARK, AND PROTECT
IMPORTANT TREES AND ASSOCIATED ROOTING ZONES, UNIQUE
AREAS (E.G., WETLANDS) TO BE PRESERVED, AND VEGETATION
SUITABLE FOR FILTER STRIPS.
(SEE THIS SHEET)
INSTALL FILTER FABRIC NLET PROTECTION ON
eth FINISH GRADE AND TEMPORY SEED PERMETER OF THE SITE.
TE P•RARY SEED ALL DISTURBED AREAS
d). STA
e). INSTAL
f). INSTALL INLET PROTECTION AS STORM INLETS ARE COMPLETED
g). COMPLETE PARKING LOTS, ROADWAYS AND CURBS
h). TEMPORARY SEED ALL DISTURBED AREAS
i). COMPLETE BUILDING
j). FINAL GRADE AND LANDSCAPING
k). COMPLETE FINAL SEEDING
I). MAINTAIN ALL EROSION AND SEDIMENT CONTROL PRACTICES
UNTIL ALL DISTURBED AREAS ARE PERMANENTLY STABILIZED
4B. MONITORING AND MAINTENANCE REQUIREMENTS ARE INCLUDED ON
THIS SHEET.
4C. PERIMETER SEDIMENT CONTROL IN INDICATED ON THIS SHEET.
4D. TEMPORARY SEEDING REQUIREMENTS ARE INDICATED ON THIS SHEET.
4E. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE INDICATED
ON THIS SHEET.
4F. PERMANENT EROSION AND SEDIMENT CONTROL MEASURES ARE INDICATED
ON THIS SHEET.
4G. STORMWATER INLET PROTECTION DETAIL IS SHOWN ON SHEET NO.10
4H. STORMWATER OUTLET PROTECTION DETAIL IS SHOWN ON SHEET NO.10
41. THE PROPOSED CONSTRUCTION ENTRANCE AND DETAIL IS LOCATED ON THIS
SHEET.
4J. THERE ARE NO INDIVIDUAL LOTS ASSOCIATED WITH THIS SITE PLAN..
4K. PERMANENT SEEDING REQUIREMENTS ARE SHOWN ON THIS SHEET.
60'
a
i 9300348 1*
STATE OF 1,51
4 /4
CC
CC
cp
c.)
as 7
ca_
OD 05
>i<
CD co
cn
L.L. CD
(15 g
CO as
CD Ci)
CO
0
0
O co
4-1
DATE: On5/2004
•gc(
c.)
co
°2
CL
c cS;
0-c(“(`.
CL
PROJECT NO. 122-0146
CD
SHEET NO.
7
OF 10
0146 ocl.DGN