Loading...
HomeMy WebLinkAbout03100015 Congressional Flex Space Carmel Science & Tech Park, Site Construction Plan pg. 07EROSION CONTROL SCHEDULE EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE STONE ENTRANCE AS NEEDED PRIOR TO CLEARING AND GRADING SILT FENCE WEEKLY, AFTER STORM EVENTS, AND AS NEEDED PRIOR TO CLEARING AND GRADING EXISTING INLET PROTECTION WEEKLY, AFTER STORM EVENTS, AND AS NEEDED PRIOR TO CLEARING AND GRADING TREE PROTECTION WEEKLY, AFTER STORM EVENTS, AND AS NEEDED PRIOR TO CLEARING AND GRADING TEMPORARY DIVERSIONS WEEKLY, AFTER STORM EVENTS, AND AS NEEDED ALONG WITH ROUGH GRADING TEMPORARY SEEDING WATER AS NEEDED AFTER ROUGH GRADING PERMANENT SEEDING WATER AS NEEDED AFTER FINISH GRADING EROSION CONTROL MATTING WEEKLY, AFTER STORM EVENTS, AND AS NEEDED AFTER FINISH GRADING STRAW BALES WEEKLY, AFTER STORM EVENTS, AND AS NEEDED AFTER FINISH GRADING INLET PROTECTION WEEKLY, AFTER STORM EVENTS, AND AS NEEDED AFTER EACH INLET IS PLACED SEED, SOD LANDSCAPE AROUND WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS UNITS FINISHED REMOVAL OF STRAW BALES WA AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABIUZED REMOVAL OF INLET PROTECTION WA AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF SILT FENCE WA AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED BOTTOM OF DITCH M, r M Ater DITCH CHECK 1 1 r 1 1 1 1 1 1 1 1 1 1 r. f 1 r 1 1 1 1 1 1 1 1 1 J 1 1 1 1 1 1 1 1 11 GROUND UNE POST SILT FENCE DETAIL NO SCALE SLOPE CHECK FABRIC BACKFILL FLOW "I EXISTING SOIL 6 "x6" TRENCH FILTER FABRIC EXTENDS INTO TRENCH Q 1 -y Lri 1 k 18" RCP ■111111111111/111111111► ■N•111111111•1111111i, ■iuiui'iva1 111111M111•■/11111/ 1111111111■111111111111 •ui•amivai ■1■11111■111111111111 1111111111111//111111 WHEN JOINING TWO OR MORE SILT FENCES TIE THE TWO END POSTS TOGETHER WITH EXISTING NYLON CORDS JOINING FENCES 122nd Street TEMPORARY CONSTRUCTION ENTRANCE 11 11 NO SCALE 1 I 16".W__ 00' BUILDING TWO 19,270 S.F. FFE 844.70 w l w 1w (Itt, a 1 w J, w w w w It w w w w w w w w w w w w 4 J, w w L,, a U F t,FAS i t r' 4 4 4 4, y a .v w J, w J. w w I ACK W ski w lw\ w 20' BU�ILDItiG SETQ \w w�� l �w 4 I IV Iw Iy 1 1 1 I CO aID 0 0 P w J, w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w DIMPST I ,',R BUILDING THREE 12,406 S.F. FFE 844.70 !!1 w E w w Jic. E 4 w w w w w J>-- w w w w w w J, w w J, w w J' Jr w w w w w w w w w w J, w w ale w w w w w w w w w J/ w w w *J. J! w 4 w w w .t, w w w w w w w .t, w w w w w w w w w w w w w w w w w W w w w .t, w w w w w w w w w w J, w w w w w J w w w w J w w '4 J. w w w w w w w w w J, w J, w w w w w w w .t' w w J. J, w w w J, w w w NI, i, w w Jr w w w w J' w J, .t, J, w 4 w w Jr w w w w w w Jr 4 w w NI, w w 4, LL lw Iw 1, 4,1 wIi la wII I I 1 I I' I o f l t 1 II I 1 fI I I I 1 J 1 I I l 1 f I I 1 w l w I I 1 1 1 w 1 1 l 01 w�w I l i wII w I'I' I\ I'C \1 v '1 3! w I (w 1 w I I o I w w I 1 J .J✓ Jul ,w r s t 1111111111' A r r �T' -r r MINI r r r w w w w w .t. w w '4, w t. w w 4c_ �w t, S w w a i w w w w J, w w w J, w w 4 _ale- -a. w v a w •v 4 4 w w w tI~� 14 w w w w .a, w w Tw w w 4 1�A ONSTRUCTI o N- w w w w g w w w w w w J, w w 1 w w -w 't4 i w- 'i, w l.- ..,s, r m i' t. w t w w w w w w w d. yr w\ w\ w\ _..•s._ w w /'10' SIDE/REAR YARD SETBAC --r_, G i---- i 6'- --T-1 i,, r r r"r..., MIMI i r r- LAM =1111111 w 4. w w w w ,,,,4- w .t, w w w w w w w w i ,.w ^^.r, .t, w .t, w w .t, w w w w 9 w 4 w ‘1 .Ya w W w w w w w w- --^Y Q NG w' J, ---4.-__ w w w w w w 4 w w w w w, w w w w w w w w w w w w ,k w w w .4 4. w .47 w w r EXISTING 0 0 0 N LEGEND STORM MANHOLE, YARD DRAIN, CLEAN -OUT SANITARY MANHOLE STORM SWALE FILTER FABRIC INSERT STRAWBALE MH PROTECTION Ck SILT FENCE TEMPORARY SEEDING CONSTRUCTION LIMITS NOTE: SEE DETAIL SHEET FOR ADDITIONAL EROSION CONTROL DETAILS 11L" 1, 2 11: I� -.a PROPOSED 0 0 0 w w w w w w w w w w J, Jr w J. MEM w N MINI MI t I \j/ I I i I� 5'r ;RCP v I it 7 EROSION CONTROL NOTES 1. CONSTRUCTION ACTIVITY TO INCLUDE BUILDING PARKING LOT. 2. THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING EROSION AND SEDIMENT MIGRATION FROM THE SITE. 3. EXISTING VEGETATIVE COVER SHALL BE PRESERVED IN AREAS NOT DISTURBED BY CONSTRUCTION ACTIVITY. 4. ALL DISTURBED AREAS SHALL BE TEMPORARILY SEEDED IMMEDIATELY UPON COMPLETION OF ROUGH GRADING. 5. THE SITE IS NOT LOCATED IN A 100 -YEAR FLOOD PLAIN PER FEMA FLOOD HAZARD BOUNDARIES. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOP DRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. 5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. SILT FENCE MAINTENANCE REQUIREMENTS 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR WHEN IT IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND REPLACE SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOP DRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO EXISTING STREETS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. 5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. STABILIZATION PRACTICE JAN. FEB. MAR. APR. MAY JUN. JUL AUG. SEPT. OCT, NOV. DEC. PERMANENT A /1/1/1/1 /1/1/ E I D SEEDING DORMANT SEEDING SEEDING SODDING MULCHING B D G C E ////1//// F 1/1/1/11 ///1/1/ CIF A KENTUCKY BLUEGRASS 40 LBSIACRE; CREEPING RED FESCUE 40 LBS /ACRE; PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE. B KENTUCKY BLUEGRASS 60 LBS /ACRE; CREEPING RED FESCUE 60 LBSIACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE. C SPRING OATS 3 BUSHEUACRE D WHEAT OR RYE 2 BUSHEUACRE E ANNUAL RYEGRASS 40 LBSIACRE. (1 LB /1000 SQ. FT.) F SOD G STRAW MULCH 2 TONS /ACRE. 1 I 1 IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPT. IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD. SEASONAL SOIL PROTECTION CHART SOILS LEGEND Br SOILS MAP D D Br Broodston Silty Clay Loam CrA Crosby Silt Loam (0 to 2% slopes) MmB2 Miami Silt Loam (2 to 6% slopes, eroded) D B D omoromi BENCHMARK NOTE TBM #1 GENERAL NOTES: "DON'T DIG BLIND" 1 800- 382 -5544 CALL BEFORE YOU DIG SCALE 1" 30' 0' 30' TBM 111- 1094 -01 FND. CUT '0' TOP EAST FACE OF LITHE POLE CONCRETE BASE; LOCATED 300' SOUTH OF CARMEL DRIVE, ON WEST SIDE OF ASPHALT DRIVE AND AT SE CORNER OF #1185 CARMEL DRIVE LOT 3, OUTLOT 17 IN CARMEL SCIENCE TECHNOLOGY PARK. ELEVATION 847.83 NW CORNER TRANSFORMER PAD LOCATED 40' +1- SOUTH OF THE CENTERLINE OF 122nd STREET AND 50' +1- WEST OF THE CENTERLINE OF CONGRESSIONAL BOULEVARD. ELEVATION 843.80 1. EROSION CONTROL MEASURES SHALL BE ADHERED TO DURING ALL PHASES OF CONSTRUCTION. 2. DISTURBED AREAS SHALL BE TEMPORARILY SEEDED IF SOIL IS TO BE LEFT EXPOSED FOR LONGER THAN 7 DAYS. TEMPORARY SEEDING SHALL BE PER- FORMED IN ACCORDANCE WITH THE SEASONAL SOIL PROTECTION CHART HOWN ON THIS SHEET. 3. ALL EXISTING VEGETATION LOCATED OUTSIDE THE GRADING OR EARTHWORK LIMITS IS TO REMAIN UNDISTURBED, AS DIRECTED BY THE OWNER 4. ALL FINAL GRADE AREAS WITHIN THE CONSTRUTION LIMIT SHALL BE PER- MANENTLY SEEDED IN ACCORDANCE WITH THE SEASONAL SOIL PROTECTION CHART. FURTHERMORE, PERMANENT SEEDING SHALL BE APPLIED ON ALL DISTURBED AREAS WHERE ADDITIONAL WORK IS NOT EXPECTED FOR A PERIOD OF MORE THAN ONE YEAR. 5. ALL SEEDING SHOWN ON THIS SHEET SHALL BE PERMANENT AND SHALL BE DONE IN ACCORDANCE WITH THE SEASONAL SOIL PROTECTION CHART. 6. FOR SEEDING SCHEDULE AND EROSION CONTROL DETAILS, SEE THIS SHEET. SOIL CONSERVATION SERVICES RULE 5 PROJECT INFORMATION: 1A. THE PROJECT LOCATION MAP IS LOCATED ON THE COVER SHEET. 1B. THIS PROJECT CONSISTS OF CONSTRUCTION OF IWO BUILDINGS SERVING OFFOCE AND FLEX WAREHOUSE AND ASSOCIATED PARKING LOT. 1C. PLANNED ANI)OR EXISTING ROADS, UTILITIES AND STRUCTURES ARE SHOWN ON PLAN SHEETS 3, 4 6. 1D. LAND USE OF ADJACENT AREAS: NORTH: 122th STREET SOUTH: DETENTION POND EAST: CONGRESSIONAL BOULEVARD WEST: COMMERCIAL SITE /WOODED AREA 2A. THE SITE CONSISTS OF GRASS AND BRUSH 2B. THERE IS NO DETENTION SYSTEM ON THE SITE. 2C. THERE ARE NO FLOODWAYS ON THIS PROJECT. 2D. SOILS INFORMATION IS PROVIDED ON THIS SHEET. 2E. EXISTING AND PROPOSED ELEVATIONS ARE SHOWN ON SHEET 5. 2F. EXISTING WATER IS COLLECTED BY SWALES AND ON-SITE SYSTEM OF INLETS AND PIPES. 2G. THE ULTIMATE RECEIVING WATERS FOR THIS SITE IS W. R. FERTIG DRAIN. 2H. THERE ARE PROPOSED STORM WATER FACILITIES FOR THIS SITE. 21. STORM WATER SYSTEM LOCATION IS SHOWN ON SHEET 7. 3A. THE LOCATION AND DIMENSIONS OF THE LAND DISTURBANCE ACTIVITY IS SHOWN ON THE COVER SHEET. 3B. THERE WILL BE NO STOCKPILES ANDOR BORROW AREAS UTILIZED DURING CONSTRUCTION. ALL EXCESS SOIL SHALL BE UTILIZED IN FILL PLACEMENT FOR CONSTRUCTION OF THIS PROJECT. 4A. DRAFT EROSION AND SEDIMENT CONTROL SEQUENCE FOR TYPICAL COMMERCIAL CONSTRUCTION SITE a). BEFORE CONSTRUCTION, EVALUATE, MARK, AND PROTECT IMPORTANT TREES AND ASSOCIATED ROOTING ZONES, UNIQUE AREAS (E.G., WETLANDS) TO BE PRESERVED, AND VEGETATION SUITABLE FOR FILTER STRIPS. (SEE THIS SHEET) INSTALL FILTER FABRIC NLET PROTECTION ON eth FINISH GRADE AND TEMPORY SEED PERMETER OF THE SITE. TE P•RARY SEED ALL DISTURBED AREAS d). STA e). INSTAL f). INSTALL INLET PROTECTION AS STORM INLETS ARE COMPLETED g). COMPLETE PARKING LOTS, ROADWAYS AND CURBS h). TEMPORARY SEED ALL DISTURBED AREAS i). COMPLETE BUILDING j). FINAL GRADE AND LANDSCAPING k). COMPLETE FINAL SEEDING I). MAINTAIN ALL EROSION AND SEDIMENT CONTROL PRACTICES UNTIL ALL DISTURBED AREAS ARE PERMANENTLY STABILIZED 4B. MONITORING AND MAINTENANCE REQUIREMENTS ARE INCLUDED ON THIS SHEET. 4C. PERIMETER SEDIMENT CONTROL IN INDICATED ON THIS SHEET. 4D. TEMPORARY SEEDING REQUIREMENTS ARE INDICATED ON THIS SHEET. 4E. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE INDICATED ON THIS SHEET. 4F. PERMANENT EROSION AND SEDIMENT CONTROL MEASURES ARE INDICATED ON THIS SHEET. 4G. STORMWATER INLET PROTECTION DETAIL IS SHOWN ON SHEET NO.10 4H. STORMWATER OUTLET PROTECTION DETAIL IS SHOWN ON SHEET NO.10 41. THE PROPOSED CONSTRUCTION ENTRANCE AND DETAIL IS LOCATED ON THIS SHEET. 4J. THERE ARE NO INDIVIDUAL LOTS ASSOCIATED WITH THIS SITE PLAN.. 4K. PERMANENT SEEDING REQUIREMENTS ARE SHOWN ON THIS SHEET. 60' a i 9300348 1* STATE OF 1,51 4 /4 CC CC cp c.) as 7 ca_ OD 05 >i< CD co cn L.L. CD (15 g CO as CD Ci) CO 0 0 O co 4-1 DATE: On5/2004 •gc( c.) co °2 CL c cS; 0-c(“(`. CL PROJECT NO. 122-0146 CD SHEET NO. 7 OF 10 0146 ocl.DGN