HomeMy WebLinkAbout03110003 Meridian Technology Center, Corvasc Medical Office Building, Construction Plans pg. 07ROSIO\ CO \TROL SC-
9UL-
EROSION CONTROL MEASURE
MAINTENANCE
INSTALLATION SEQUENCE
TONE EN TP ^d CE
ASS NEEDED
PRIOR T', CLEARING AND GRADING
SIFT FENCE
WEEKLY, AFTER STORM EVENT A.ND AS NEEDED
PRIOR CLEARING AND GR „AD TilG
ExilSilNG INI ET FRO Tr
W'EEI\_'1 AFTER STORM EVENT:_ AND AS NEEDED
PRIOR CLEARI11G AND GRADING
-REF PR OTE.c.1 -ION
WEEKLY AE T ER STORM EVENTS AND AS NEEDED
PPI"R 7.S IS LEAgIr`JG AND GRADING
TEMPORAR'r DI VERSIONS
WEEI'Lt', TER STORM EVENT= AND AS NEEDED
ALCi 1 iG IJ'iiITH ROUGH GRADING
TEMPCRAR'r" SEDIMENT TRAP
WEENE' AFTER STORM EVENS ATM AS NEEDED
ALI'L WITH POUCH GRADING
TEMPOPAR i'lii SEEDING
Y'VATEF AS 'LL_DED!
AFTEP R _iLCH GP ADING
'PERMANENT SE, DING
WATER AS fIEEDED
AETE P FI I,SH OR NG
EROSION CONTROL MAFTIN +G
W'EEkLI, AI TER STORM EVEN .P.JD AS NEEDED
AFTER 1 DIP,G
.STRAW BALES
WEEKLY, AF TER STORM EVENT_ AND AS NEEDED
AFTEP "N ISF SPAD NG
INLET PROTECTION
`"rEEKI i, AFTER STORM EVENTS -i AS NEEDED
AFTEP 1 i;_1 T IS PLACED
SEED, SOD �k LANDSCAPE AROUND
WATER R AS HEEDED
AFTER iiLHEE GRADING AROUND FINISHED T IT_
Fli'JISHED 'NIT
12 -18
7 -21
REM 0ivJAl_ OF SIP A Vi BA
PJ 'A.
AF EF AFEAS DRAINING TO THESE AREAS 4F STABILIZE
r iLMOVAL OF INLET PRO iLC HON
I'1 �A
AFTER ALL APE/ DRAINING TO T H ESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE
11'A
AFTEP At ?�QE'-S DRAINING TT 'HESE ARE-_ STABILIZE,
DATE
10/30/03
REI INVESTMENTS
INDIANAPOLIS, INDIANA
DRAWN BY:
RDR
CHECKED BY
MSO
SHEET TITLE:
EROSION CONTROL
DETAILS
DRAWING FILES:
S: \1211\018\DWGS\C801
XREF: S: \1211 \018 \dwgs \Titlel.dwg
SHEET NO
C8011.
Aug
Sep
Oct
Nov
Z)
F1
IA
Norrr
Dry
Gen.
Soil
Spray
1
DATE
10/30/03
PROJECT NOT
1211.018
DRAWN BY:
RDR
CHECKED BY
MSO
SHEET TITLE:
EROSION CONTROL
DETAILS
DRAWING FILES:
S: \1211\018\DWGS\C801
XREF: S: \1211 \018 \dwgs \Titlel.dwg
SHEET NO
C8011.
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Norrr
Dry
Gen.
Soil
Spray
re
r
ra 1
A /Aiiiiii;;;.
Permanent
rd
Seeding
A
Dates
r /1
Creeping Red Fescue
Festuca rubra
2
1
2
1
1
1
Med.
1
20 -25
12 -18
7 -21
S
Kentucky Bluegrass
Poe pratinsis
2
1
2
1
1
1
Seedbed Preparation
Apply 400-600 pounds per acre or 9-1.3 pounds per 1000 sq. ft
of 12-12-12 analysis fertilizer.
Work e fertilizer into the soil to a depth of 3 inches
with a harrow, disk or rake operated across the slope as much as
Mulch Rate
Mulch is to be applied at 2,000 to 3,000 pounds per acre it areas not
covered by Sion control blanketing. Mulch must be anchored using a mulch
anchoring tool or farm disk with dull, serrated, straight set blades, or bulldozer
cleats driven p and down slope.
Species
Lawns and h Maintenance Areas
1. Kentucky Bluegrass 130 3.0 5.5 -7.0
2. Perennial Ryegrass
(Turf Type)
Bluegrass
90 2.0
3. Tall Fescue (Turf Type) 130 4.0
Bluegrass 30 0.7
1 Preferred 2 Will Tolerate Inoculate with specific Inoculatt.
Wheat or Rye
Oats
Annual Ryegrass
Non Irrigated*
Irrigated
Dormant
Seeding
Spring Oats
Figure 5 -2: Permanent Seed Mixtures
Wheat or Rye 3.5 Ibs.
Annual ryegrass 1 Ib.
Seeding Rate Suitable pH `kite Suitability*
lbs/acre Ibs /1000 well
sq. ft.
60 1.4
Temporary Seeding Dates
Irrigation needed during this period. To control
erosion at times other than in the shaded areas,
use mulch.
Late summer seeding dates may be extended 5 days
if mulch is applied.
Increase seeding application by 50
FIGURE 5 -3
Temporary Seedings
2.3 Ibs.
Kind of Seed 1000 Sq. Ft. Acre
5.6 -7.0
5.6 -7.0
5.5 -7.5
Not necessary where mulch is applied.
Ranking:
1 Good
2 Medium
Not tolerant
Drought Drained Wet
Remarks
2 bu. Cover seed 1" to
1 1 /2" deep
3 bu. Cover seed 1" deep
40 lbs. Cover seed 1 4 "deep*
FIGURE 5 -4
Salt Tolerance (to both soil salts spray):
T Tolerance
MT Medium Tolerance
S Slight Tolerance
SILT FENCE
Silt Fence shall be a machine produced, non-woven geotextile of 100%
polypropylene meeting the physical properties below.
All stakes shall be 2" X 2' hardwood 36" tall with 24" tall lath stapled
to stakes over fabric as reinforcement.
A.II silt fence shall be prefabricated by the supplier. No field assembly
will be accepted.
Fabric Weight._... 4 oz /syd
Grab Strength.
Warp 125 lbs.
LIongation Warp 50
Trapezoidal Tear Strength 50 lbs.
Burst Strength..............._. psi
UV Resistance. .70
A.O 5 50 -80
Slurry Flow Rate 275 gpm /sq, ft
r t� 'r5
�;ediment Retention o
Silt Fence Material
Fence Post
Fence Post Should
be Buried 1' Below
Ground Surface
SILT FENCE DETAIL
N TS
F )BLIC ROAD
6" (MIN)
2 -3" COARSE
AGGREGATE
GEOTEXTILE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
Stakes 5' O.C.
Ground Surface
--Silt Fence Materiol Should
be Buried 6" Below Ground
Surface.
TEMPORARY CONSTRUCTION
ENTRANCE DETAIL
SEE CHART FOR MAINTENANCE REQUIREMENTS
50'
v
0'
V
2 stakes (typ)
per bale
Plan
(n.t.s.)
bindings to be
placed parallel
to ground
RUN OFF
Profile
(n.t.s.)
flow
-straw bole
-straw bale
stake (typ)
3 6 "undertoe
SEDIMENT FILTER DETAIL
6" HIGH, 12" WIDE GEOTECTILE FABRIC
FILLED WITH No.2 STONE. (FABRIC -NUTEC
3NW SILT FENCE FABRIC OR APPROVED EQUAL)
ONE FOOT OVERLAP
ONTO THE CURB
CURB INLET
CURB INLET SEDIMENT BARRIER
NO SCALE
SITE SPECIFIC CONSTRUCTION SEQUENCING FOR EROSION CONTROL
The purpose of staging construction during the earthwork phase of the project is to limit the amount of ground disturbed at
any given time and to control silt from the areas that are disturbed to prevent silt from leaving the site. For this reason,
the following sequencing should be followed as much as possible.
PRECONSTRUC11ON ACTIVITIES
1. Install temporary stone access drives for entrances and silt fence along property lines,
Install tree protection.
ESTABLISH BASIN
2. Install pipe outlet protection (southeast corner).
3. Strip, excavate and fill mass earthwork.
4. Temporary seed disturbed areas.
5. Install utilities.
6. Fine grade and seed all disturbed areas upon completion of grading.
POST CONSTRUCTION ACTIVITIES
7. Inspect and maintain all erosion control measures as detailed in the erosion control measures and maintenance requirements
beginning immediately after installation.
5
SILT FENCE MATERIAL
INLET PROTECTION SILT FENCE
6" HIGH, 12" WIDE GEOTECTILE FABRIC
FILLED WITH No. 2 STONE. (FABRIC -NUTEC
3NW SILT FENCE FABRIC OR APPROVED EQUAL)
RUN OFF
PAVED AREA INLET SEDIMENT BARRIER
NO SCALE
CO
3
THE BLANKET SHOULD NOT BE
STRETCHED BUT ALLOWED TO LAY
LOOSELY ON THE SOIL SURFACE TO
ACHIEVE MAXIMUM BLANKET TO SOIL
CONTACT.
CROSSBARS-
N,
300
275
250
225 B
200
SLOPE 175
LENGTH 150
(FT.) 125
100-
75 A
50
25
0
IN HIGH VELOCITY CHANNEL APPUCATIONS,
CHECK SLOTS SHOULD BE ESTABLISHED
EVERY 35 40'. THE SLOTS SHOULD BE
6" MADE BY 6' DEEP WITH THE BLANKET
STAPLED IN THE BOTTOM OF THE SLOT,
THEN BACKFILLED AND SEEDED.
N
NOTE:
1. SEE SILT FENCE DETAIL
FOP MATERIAL SPECIFICATIONS.
2. SILT FENCE SHALL BE
PREASSEMBLED BY SUPPLIER.
A
1 STAPLE PER 50. YD.
1 1/2'
GENERAL STAPLE RECOMMENDATIONS
B
4:1 3:1 2:1 1:1
SLOPE GRADIENT
1 -1/2 STAPLES PER 50. YD.
CHANNEL
LINING
B
3'
STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN
EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY
DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL.
AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE
DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE
BLANKETS, STAPLE PATTERN "C" SHOULD BE UTILIZED.
1
THE EDGES Or THE BLANKET SHOULD
BE BUTTED AGAINST EACH OTHER, THE
EDGES OF THE SCC225 SHOULD BE
OVERLAPPED 2
BEEHIVE INLET OR
DRAINAGE COVER
LATHS
%7 SILT FENCE EXTENDS
7 6" BELOW FINISHED GRADE
1 1/2'
RUN OFF
ADDITIONAL STAPLES AS
REQUIRED DUE TO DEPTH OF FLOW.
PAVED AREA INLET
2 STAPLES PER 50. YD.
CHANNEL UNINGS UTILIZE STAPLE PAIILRN "0"
WITH ADDITIONAL STAPLES ON SIDE SLOPES AT
PROJECTED WATER UNE.
2
ON SLOPE APPUCATIONS, THE TOP OF
THE BLANKET SHOULD BE "SLOTTED IN"
ABOVE THE BREAK OF THE SLOPE OR AT
A MINIMUM, STAPLED IN PLACE WITH
STAPLES 6" APART ON THE END OF THE
BLANKET.
ROLL BLANKETS
OUT IN DIRECTION
OF WATER FLOW.
ROLL BLANKETS
OUT IN DIRECTION
OF WATER FLOW.
4
ON LONG SLOPES, THE ENDS OF THE
BLANKETS SHOULD BE OVERLAPPED
4 6" IN A 'SHINGLE EFFECT`.
6
PREPARATION OF THE SEED BED,
INCLUDING APPLICATION OF LIME,
FERTILIZER AND SEED SHOULD BE
CONDUCTED AS NORMAL PRIOR TO
INSTALLATION OF BLANKET.
EROSION BLANKET INSTALLATION
C801
SEEDING--
EXISTING GRADE
-EROSION CONTROL BLANKET
(NORTH AMERICAN GREEN
S -75 OR EQUAL)
EROSION CONTROL
MATTING DETAIL c ao,
MATTING DETAIL C801
=Ji
N -6" MIN. TURN DOWN
EROSION AND SEDIMENT CONTROL PLAN SUMMARY AND "RULE 5" DATA
Project: Conseco Corvasc
Nature and Purpose: Medical Office Building
Estimated Start: April 2004
Estimated Completion of Site Development: November 2004
Floodplains, Floodway Fringes, Floodways: None
Lakes, Streams, Channels, Ditches, Wetlands, etc.: None
Existing Soil Types Description (refer to sheet C103 for soils map): Crosby (CrA)
Receiving Waters: Fortig Drain
Potential Areas Where Stormwater May Enter Groundwater: None known
Existing Vegetation: The site is covered with weeds and grass.
Soil Stockpile /Borrow Areas: None Proposed
Contact Person:
Julie Christensen
REI Investments, Inc.
11711 N. Pennsylvania Suite 200
Carmel, IN 46032
(317) 573 -6048
Adjacent Land Use:
North Commercial
South Commercial
East Commercial
West Commercial
Additional Notes:
The swale> should be constructed and stabilized as early as practical to prevent
run -off from leaving the site. Erosion control for existing outlet structures must
be maintained. Blanket installation to be done as soon as slopes are constructed.
EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS
STRAW BALE DAM MAINTENANCE REQUIREMENTS
1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE
IT.
SILT FENCE MAINTENANCE REQUIREMENTS
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3, REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIPRAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE SITE TO BLEND WITH ADJOINING AREAS, AND STABILIZE.
SANDBAG CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS
1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR IF
NECESSARY.
2. INSPECT AFTER EACH STORM EVENT.
3. REMOVE SEDIMENT, WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF THE
BARRIER.
4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS.
BLOCK AND GRAVEL CURB INLET PROTECTION MAINTENANCE REQUIREMENTS
1. AFTER EACH STORM EVENT, REMOVE THE SEDIMENT AND REPLACE THE GRAVEL;
REPLACE THE GEOTEXTILE FABRIC, IF USED.
2. PERIODICALLY REMOVE SEDIMENT AND TRACKED -ON SOIL FROM THE STREET, WITHOUT
FLUSHING, TO REDUCE THE SEDIMENT LOAD ON THE CURB INLET PROTECTION.
3. INSPECT PERIODICALLY FOR DAMAGE AND REPAIR; KEEP GRATES FREE OF DEBRIS.
4. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE
GRAVEL, WIRE MESH, GEOTEXTILE FABRIC, AND ANY SEDIMENT, AND DISPOSE OF THEM
PROPERLY.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS
1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING
IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOPDRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
DATE: f
DRAWING AND THE IDEA, AN
CONCEPTS COrii T AINED HEREIN APL THE, EXCLUSI'V'E
IP'TELLE��.;l'JAL r t �rLF Y vt RTE. 3� ilt_iuf f
CORPORATION, .NIT ARE NOT TO BE USED "R
REPRODUCED, IN WHOLE OR Ira PART. WIEHC'UT
THE WRITTEN C N Er T OF THE S.Crf G CE.F.'
OPPcF?A,I !f.;
(O PYRIGHTED BY THE OH IL DE.E
Schneider
THE SCHNEIDER CORPORATION
Historic Fort Harrision
8901 Otis Avenue
Indianapolis, IN 46216 -1037
Telephone: 317.826.7100
Fax: 317.826.7200
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GIS *LIS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering
SOIL
CONDITION
Shade
Tolerance
'Close Mowing
to 2-3 1 /2inches
Tromping
Tolerance
Fertility
Needs
Winter
Hardiness
Flooding
Tolerance (days)
Mature
Height (inches)
(sX op) auJu
aDua6Jaw3
Salt
Tolerance
Wet
Norrr
Dry
Gen.
Soil
Spray
Creeping Red Fescue
Festuca rubra
2
1
2
1
1
1
Med.
1
20 -25
12 -18
7 -21
S
Kentucky Bluegrass
Poe pratinsis
2
1
2
1
1
1
Med.
1
25 -35
12 -18
10 -20
MT
Tall Fescue
Festuca L arundinacea
2
1
1
1
1
1
Low
1
24 -35
24 -36
5 -14
T
Perennial ryegrass
Lolium perenne
2
1
2
1
(NI 1
Med-
High
2
15 -20
12-18
5 -10
MT
Crownvetch
Coronilla varia
1
1
2
Low
1
5 -10
24
14 -21
T
Red Clover
Trifolium pratense
1
2
Med.
1
7 -10
18
5 -10
S
S
Seedbed Preparation
Apply 400-600 pounds per acre or 9-1.3 pounds per 1000 sq. ft
of 12-12-12 analysis fertilizer.
Work e fertilizer into the soil to a depth of 3 inches
with a harrow, disk or rake operated across the slope as much as
Mulch Rate
Mulch is to be applied at 2,000 to 3,000 pounds per acre it areas not
covered by Sion control blanketing. Mulch must be anchored using a mulch
anchoring tool or farm disk with dull, serrated, straight set blades, or bulldozer
cleats driven p and down slope.
Species
Lawns and h Maintenance Areas
1. Kentucky Bluegrass 130 3.0 5.5 -7.0
2. Perennial Ryegrass
(Turf Type)
Bluegrass
90 2.0
3. Tall Fescue (Turf Type) 130 4.0
Bluegrass 30 0.7
1 Preferred 2 Will Tolerate Inoculate with specific Inoculatt.
Wheat or Rye
Oats
Annual Ryegrass
Non Irrigated*
Irrigated
Dormant
Seeding
Spring Oats
Figure 5 -2: Permanent Seed Mixtures
Wheat or Rye 3.5 Ibs.
Annual ryegrass 1 Ib.
Seeding Rate Suitable pH `kite Suitability*
lbs/acre Ibs /1000 well
sq. ft.
60 1.4
Temporary Seeding Dates
Irrigation needed during this period. To control
erosion at times other than in the shaded areas,
use mulch.
Late summer seeding dates may be extended 5 days
if mulch is applied.
Increase seeding application by 50
FIGURE 5 -3
Temporary Seedings
2.3 Ibs.
Kind of Seed 1000 Sq. Ft. Acre
5.6 -7.0
5.6 -7.0
5.5 -7.5
Not necessary where mulch is applied.
Ranking:
1 Good
2 Medium
Not tolerant
Drought Drained Wet
Remarks
2 bu. Cover seed 1" to
1 1 /2" deep
3 bu. Cover seed 1" deep
40 lbs. Cover seed 1 4 "deep*
FIGURE 5 -4
Salt Tolerance (to both soil salts spray):
T Tolerance
MT Medium Tolerance
S Slight Tolerance
SILT FENCE
Silt Fence shall be a machine produced, non-woven geotextile of 100%
polypropylene meeting the physical properties below.
All stakes shall be 2" X 2' hardwood 36" tall with 24" tall lath stapled
to stakes over fabric as reinforcement.
A.II silt fence shall be prefabricated by the supplier. No field assembly
will be accepted.
Fabric Weight._... 4 oz /syd
Grab Strength.
Warp 125 lbs.
LIongation Warp 50
Trapezoidal Tear Strength 50 lbs.
Burst Strength..............._. psi
UV Resistance. .70
A.O 5 50 -80
Slurry Flow Rate 275 gpm /sq, ft
r t� 'r5
�;ediment Retention o
Silt Fence Material
Fence Post
Fence Post Should
be Buried 1' Below
Ground Surface
SILT FENCE DETAIL
N TS
F )BLIC ROAD
6" (MIN)
2 -3" COARSE
AGGREGATE
GEOTEXTILE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
Stakes 5' O.C.
Ground Surface
--Silt Fence Materiol Should
be Buried 6" Below Ground
Surface.
TEMPORARY CONSTRUCTION
ENTRANCE DETAIL
SEE CHART FOR MAINTENANCE REQUIREMENTS
50'
v
0'
V
2 stakes (typ)
per bale
Plan
(n.t.s.)
bindings to be
placed parallel
to ground
RUN OFF
Profile
(n.t.s.)
flow
-straw bole
-straw bale
stake (typ)
3 6 "undertoe
SEDIMENT FILTER DETAIL
6" HIGH, 12" WIDE GEOTECTILE FABRIC
FILLED WITH No.2 STONE. (FABRIC -NUTEC
3NW SILT FENCE FABRIC OR APPROVED EQUAL)
ONE FOOT OVERLAP
ONTO THE CURB
CURB INLET
CURB INLET SEDIMENT BARRIER
NO SCALE
SITE SPECIFIC CONSTRUCTION SEQUENCING FOR EROSION CONTROL
The purpose of staging construction during the earthwork phase of the project is to limit the amount of ground disturbed at
any given time and to control silt from the areas that are disturbed to prevent silt from leaving the site. For this reason,
the following sequencing should be followed as much as possible.
PRECONSTRUC11ON ACTIVITIES
1. Install temporary stone access drives for entrances and silt fence along property lines,
Install tree protection.
ESTABLISH BASIN
2. Install pipe outlet protection (southeast corner).
3. Strip, excavate and fill mass earthwork.
4. Temporary seed disturbed areas.
5. Install utilities.
6. Fine grade and seed all disturbed areas upon completion of grading.
POST CONSTRUCTION ACTIVITIES
7. Inspect and maintain all erosion control measures as detailed in the erosion control measures and maintenance requirements
beginning immediately after installation.
5
SILT FENCE MATERIAL
INLET PROTECTION SILT FENCE
6" HIGH, 12" WIDE GEOTECTILE FABRIC
FILLED WITH No. 2 STONE. (FABRIC -NUTEC
3NW SILT FENCE FABRIC OR APPROVED EQUAL)
RUN OFF
PAVED AREA INLET SEDIMENT BARRIER
NO SCALE
CO
3
THE BLANKET SHOULD NOT BE
STRETCHED BUT ALLOWED TO LAY
LOOSELY ON THE SOIL SURFACE TO
ACHIEVE MAXIMUM BLANKET TO SOIL
CONTACT.
CROSSBARS-
N,
300
275
250
225 B
200
SLOPE 175
LENGTH 150
(FT.) 125
100-
75 A
50
25
0
IN HIGH VELOCITY CHANNEL APPUCATIONS,
CHECK SLOTS SHOULD BE ESTABLISHED
EVERY 35 40'. THE SLOTS SHOULD BE
6" MADE BY 6' DEEP WITH THE BLANKET
STAPLED IN THE BOTTOM OF THE SLOT,
THEN BACKFILLED AND SEEDED.
N
NOTE:
1. SEE SILT FENCE DETAIL
FOP MATERIAL SPECIFICATIONS.
2. SILT FENCE SHALL BE
PREASSEMBLED BY SUPPLIER.
A
1 STAPLE PER 50. YD.
1 1/2'
GENERAL STAPLE RECOMMENDATIONS
B
4:1 3:1 2:1 1:1
SLOPE GRADIENT
1 -1/2 STAPLES PER 50. YD.
CHANNEL
LINING
B
3'
STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN
EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY
DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL.
AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE
DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE
BLANKETS, STAPLE PATTERN "C" SHOULD BE UTILIZED.
1
THE EDGES Or THE BLANKET SHOULD
BE BUTTED AGAINST EACH OTHER, THE
EDGES OF THE SCC225 SHOULD BE
OVERLAPPED 2
BEEHIVE INLET OR
DRAINAGE COVER
LATHS
%7 SILT FENCE EXTENDS
7 6" BELOW FINISHED GRADE
1 1/2'
RUN OFF
ADDITIONAL STAPLES AS
REQUIRED DUE TO DEPTH OF FLOW.
PAVED AREA INLET
2 STAPLES PER 50. YD.
CHANNEL UNINGS UTILIZE STAPLE PAIILRN "0"
WITH ADDITIONAL STAPLES ON SIDE SLOPES AT
PROJECTED WATER UNE.
2
ON SLOPE APPUCATIONS, THE TOP OF
THE BLANKET SHOULD BE "SLOTTED IN"
ABOVE THE BREAK OF THE SLOPE OR AT
A MINIMUM, STAPLED IN PLACE WITH
STAPLES 6" APART ON THE END OF THE
BLANKET.
ROLL BLANKETS
OUT IN DIRECTION
OF WATER FLOW.
ROLL BLANKETS
OUT IN DIRECTION
OF WATER FLOW.
4
ON LONG SLOPES, THE ENDS OF THE
BLANKETS SHOULD BE OVERLAPPED
4 6" IN A 'SHINGLE EFFECT`.
6
PREPARATION OF THE SEED BED,
INCLUDING APPLICATION OF LIME,
FERTILIZER AND SEED SHOULD BE
CONDUCTED AS NORMAL PRIOR TO
INSTALLATION OF BLANKET.
EROSION BLANKET INSTALLATION
C801
SEEDING--
EXISTING GRADE
-EROSION CONTROL BLANKET
(NORTH AMERICAN GREEN
S -75 OR EQUAL)
EROSION CONTROL
MATTING DETAIL c ao,
MATTING DETAIL C801
=Ji
N -6" MIN. TURN DOWN
EROSION AND SEDIMENT CONTROL PLAN SUMMARY AND "RULE 5" DATA
Project: Conseco Corvasc
Nature and Purpose: Medical Office Building
Estimated Start: April 2004
Estimated Completion of Site Development: November 2004
Floodplains, Floodway Fringes, Floodways: None
Lakes, Streams, Channels, Ditches, Wetlands, etc.: None
Existing Soil Types Description (refer to sheet C103 for soils map): Crosby (CrA)
Receiving Waters: Fortig Drain
Potential Areas Where Stormwater May Enter Groundwater: None known
Existing Vegetation: The site is covered with weeds and grass.
Soil Stockpile /Borrow Areas: None Proposed
Contact Person:
Julie Christensen
REI Investments, Inc.
11711 N. Pennsylvania Suite 200
Carmel, IN 46032
(317) 573 -6048
Adjacent Land Use:
North Commercial
South Commercial
East Commercial
West Commercial
Additional Notes:
The swale> should be constructed and stabilized as early as practical to prevent
run -off from leaving the site. Erosion control for existing outlet structures must
be maintained. Blanket installation to be done as soon as slopes are constructed.
EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS
STRAW BALE DAM MAINTENANCE REQUIREMENTS
1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE
IT.
SILT FENCE MAINTENANCE REQUIREMENTS
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3, REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIPRAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE SITE TO BLEND WITH ADJOINING AREAS, AND STABILIZE.
SANDBAG CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS
1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR IF
NECESSARY.
2. INSPECT AFTER EACH STORM EVENT.
3. REMOVE SEDIMENT, WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF THE
BARRIER.
4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS.
BLOCK AND GRAVEL CURB INLET PROTECTION MAINTENANCE REQUIREMENTS
1. AFTER EACH STORM EVENT, REMOVE THE SEDIMENT AND REPLACE THE GRAVEL;
REPLACE THE GEOTEXTILE FABRIC, IF USED.
2. PERIODICALLY REMOVE SEDIMENT AND TRACKED -ON SOIL FROM THE STREET, WITHOUT
FLUSHING, TO REDUCE THE SEDIMENT LOAD ON THE CURB INLET PROTECTION.
3. INSPECT PERIODICALLY FOR DAMAGE AND REPAIR; KEEP GRATES FREE OF DEBRIS.
4. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE
GRAVEL, WIRE MESH, GEOTEXTILE FABRIC, AND ANY SEDIMENT, AND DISPOSE OF THEM
PROPERLY.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS
1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING
IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOPDRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
DATE: f
DRAWING AND THE IDEA, AN
CONCEPTS COrii T AINED HEREIN APL THE, EXCLUSI'V'E
IP'TELLE��.;l'JAL r t �rLF Y vt RTE. 3� ilt_iuf f
CORPORATION, .NIT ARE NOT TO BE USED "R
REPRODUCED, IN WHOLE OR Ira PART. WIEHC'UT
THE WRITTEN C N Er T OF THE S.Crf G CE.F.'
OPPcF?A,I !f.;
(O PYRIGHTED BY THE OH IL DE.E
Schneider
THE SCHNEIDER CORPORATION
Historic Fort Harrision
8901 Otis Avenue
Indianapolis, IN 46216 -1037
Telephone: 317.826.7100
Fax: 317.826.7200
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GIS *LIS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering