HomeMy WebLinkAboutC602 DetailsMAINTENANCE INSTALLATION GUIDELINES EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE STONE ENTRANCE INSPECT WEEKLY, AFTER STORM EVENTS, AND AFTER HEAVY USE; RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL; TOP DRESS WITH CLEAN STONE AS NEEDED; REMOVE ALL MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS IMMEDIATELY PRIOR TO CLEARING AND GRADING SILT FENCE INSPECT AFTER STORM EVENTS; REPAIR ANY AREAS OF DECOMPOSITION OR DAMAGE TO FENCE MATERIAL: REMOVE SEDIMENT AT DEPTH OF ONE HALF FENCE HEIGHT AT LOWEST POINT OR IF FABRIC BULGES; AVOID UNDERMINING DURING CLEANOUT PRIOR TO CLEARING AND GRADING EXISTING INLET PROTECTION WEEKLY, AFTER STORM EVENTS, AND AS NEEDED PRIOR TO CLEARING AND GRADING T PROTECTION TREE EC 0 T R EVENTS, WEEKLY, AFTER STORM T AND AS NEEDED WEE L E S O EVE S D 5 EEDED PRI R CLEARING 0 TO C E I AND IN L G D GRAD G TEMPORARY SEEDING P IN TPERIODICALLY T RIFYA ESTABLISHMENT SEC TO VERIFY ADEQUATE F 0 Q V TAT STANDS; RESEED AND MULCH NEEDED; IN AFTER VEGETATIVE S DS, EEEED A D MULC AS EEDED P SECT E STORM EVENTS AND REPAIR EROSION DAMAGE; TOP DRESS FALL SEEDED WHEAT OR RYE SEEDINGS WITH 50 LBS /AC OF NITROGEN IN FEBRUARY OR MARCH IF NITROGEN DEFICIENCY IS APPARENT; WATER AS NEEDED AFTER ROUGH GRADING PERMANENT SEEDING INSPECT PERIODICALLY AND AFTER STORM EVENTS UNTIL VEGETATIVE STAND IS ESTABLISHED; ADD FERTILIZER AFTER GROWING SEASON PER SOIL TEST RECOMMENDATIONS; REPAIR DAMAGED, BARE, OR SPARSE AREAS BY FILLING, REPREPARING THE SEED BED, FERTILIZING, AND /OR SEEDING AND MULCHING AFTER FINISH GRADING OF EACH AREA EROSION CONTROL BLANKET INSPECT FOR AREAS OF EROSION BELOW THE BLANKET AFTER EACH STORM EVENT; REPAIR AREAS OF EROSION BY REMOVING AFFECTED PORTION OF BLANKET, ADD SOIL, RESEED, RELAY AND STAPLE BLANKET; INSPECT PERIODICALLY AFTER VEGETATION IS ESTABLISHED AFTER FINISH GRADING INLET PROTECTION INSPECT FABRIC BARRIER AFTER STORM EVENTS AND MAKE NEEDED REPAIRS IMMEDIATELY; REMOVE SEDIMENT FROM THE POOL AREA WHILE AVOIDING DAMAGING OR UNDERCUTTING THE FABRIC AFTER EACH INLET IS PLACED SEED, SOD I LANDSCAPE AROUND UNITS FINISHED KEEP SOD MOIST UNTIL FULLY ROOTED; WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS REMOVAL OF INLET PROTECTION N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF SILT FENCE N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED C C *OS I D t•'1 .515 V Y:. Y 'r r•� ri .t i{ r r r., k,...� :.�t •f}I,•k,k ..+i...u;f; ,{{JAN V.tt f}!., t': {tY f E'}{: i{ ej{{;:, ri;:: i r. ^.iv�i :ii :i ^iixw l�'1 }::1{{•i':• }..1..1 :lt .h N.:t:' .r. •...2 {{'•tt: ltt• 1{ .4. !.'I .::s:•r::::.::: :rrv.ttt•.•: :.{i{{ .'l.f:{ •:.'.•1 ::.t't':: rr A .:t. r {•�k }.tVAtfl: At: "tr.:.Prh•I :try :'h::}•h:.c::::::• :.t :•a ir.•.vei�u.•r.; J.:Att..ry {'.A. ..I PIPE SIZE 8" TO 15" 18" OVER BEDDING BELOW THE PIPE BARREL O.D. /4 MIN, 4" O,D. /4 MAX. 8" iii 0 X a) CP 0 E a) 0 E 0 z t- 0 0 J 0 0 a) 0 J 0 0 0 N J as a) m 0 11 14.14411/4. a •t t NMI t0 870.0 e 10.25' TOOLED CONTRACTION JOINT 1/4" WIDE, MIN, 1 1/2" DEPTH 1/8" Fr... 7 I 1 IHM it r 1j t r��i'�� %��'�i��i���� i 1 ��t� �sr�i� {it�i��il�s�� 't 1 ���reirt i� tj �i�����fo {i� �1�t� }�f�f �r�alif�{ i�rif�it ;1 ,0 •1 1 i .1)-i et•To a,"%a'ie .�ltti.•, �it� _r _l.tt•...tfi. r., IP 20' .a `�t'�i�411>f Iii 5 1 5t i�l�?� 1T1ii 1I- ti,�LP�jj6����.�i�i 7 8" RIP -RAP �t.��•� I 86 .95 867,9 o r s�iT� i��x�� ri �i� Jr ilai l refer t�`re P: 1�t�t�t�'" OVERFLOW WEIR SECTION NO SCALE 10.25' 870.0 NON WOVEN FILTER FABRIC EDGE OF BLANKET SHALL BE ANCHORED IN A 6" DEE� X 6" WIDE TRENCH, 15' O" S7 -per 0 NOTE: ALL EROSION CONTROL BLANKETS SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS BASED ON THE PROPOSED TYPE AND USE. EROSION CONTROL BLANKET REQ'D. NORTH AMERICAN GREEN SC150 OR EQUAL BLANKET TO BE STAPLED IN PLACE WITH STAPLES AT 2 PER SQUARE YARD. EDGE OF BLANKET SHALL BE ANCHORED IN A 6" DEEP' X 6" WIDE TRENCH. MAXIMUM SLOPE PROPOSED DITCH EDGE OF BLANKET SHALL BE ANCHORED IN A 12" DEEP X 6" WIDE TRENCH. TYPICAL EROSION CONTROL BLANKET NO SCALE 3" HARDWOOD MULCH REMOVE UPPER 1/3 OF BURLAP SOIL MIX: 3 PARTS TOPSOIL 1 PART PEAT. SUBGRADE SCARIFY POT BOUND PLANTS Tr_ tT� ,TWICE BALL DIA NO SCALE REMOVE ANY BINDING AROUND PLANT STEM CREATE 4" SAUCER FINISH GRADE B B OR CONTAINER GROWN ROOT BALL SHRUB PLANTING DETAIL -1" 10 1/2:1 2' -6 1/2 NO SCALE 1' -0" TRAFFIC TURN ARROW INITIAL BACKFILL 6" OF HAND PLACED NATIVE MATERIAL WITH SOLIDS NO LARGER THAN 2 -3 INCHES IN DIAMETER WALKED IN FOR COMPACTION #8 CRUSHED STONE OR FRACTURED FACE AGGREGATE HAND TAMPED OR WALKED IN TO 1/2 0.D. 6 PER SPECS. PERMANENT SEEDING TEMPORARY SEEDING MULCHING GROUND LINE POST E NON -WOVEN FILTER FABRIC EXTENDS INTO TRENCH Erma 4" MIN. BELOW BARREL T- #8 CRUSHED STONE OR #8 FRACTURED FACE AGGREGATE, BELL HOLE EXCAVATED A SLOPE CHECK h ilt =jai VW' rI' 1.25x0.D.+ 12" r MIN. WIDTH NO SCALE 1 EXISTING SOIL 6" X 6" TRENCH D OF 1/2 O.D. 1 NOTE: ALL SEEDING SHALL HAVE 12 -12 -12 FERTILIZER APPLIED 400 -600 LBS. PER ACRE OR AS SPECIFIED. SEEDING SCHEDULE NO SCALE DITCH CHECK POST NON -WOVEN FABRIC SILT FENCE DETAIL NO SCALE TRENCH BEDDING DETAIL BACKFILL WITH CLEAN GRANULAR MATERIAL PER REQUIREMENT OF INDIANA DEPARTMENT OF HIGHWAYS. (MECHANICAL COMPACTION TO 95% PROCTOR DENSITY) #8 CRUSHED STONE OR #8 FRACTURED FACE AGGREGATE HAND TAMPED OR WALKED IN TO 1/2 O,D., PER SPECS, STABILIZATION PRACTICE: JAN. FEB. MAR, APR, MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. /1 B D I //I amismormirirmumwarromi A KENTUCKY BLUEGRASS 40%, TURF TYPE TALL FESCUE 40%, ANNUAL RYE GRASS 20% PLUS 2 TONS OF STRAW MULCH/ ACRE APPLY MIXTURE AT A RATE OF 2 LBS. PER 1000 SQ.FT. B SPRING OATS 3 BUSHEL PER ACRE C WHEAT OR RYE 2 BUSHEL PER ACRE D ANNUAL RYE GRASS (1 LB. PER 1000 SQ. FT.) E STRAW MULCH (90 LBS. PER 1000 SQ.FT.) I IRRIGATION NEEDED DURING JUNE, JULY, AND OR SEPTEMBER. IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD JOINING FENCES WHEN JOINING TWO OR MORE SILT FENCES TIE THE TWO END POSTS TOGETHER WITH EXISTING NYLON CORDS. 0 0 0 0 Q) 0 CC CL W U. U 0 N Q UW CD Q W w w Cr a) CO x N 0 (1) co Ln cd 4C W of 0 0 0 0 0 0 0 0 0 (I) D 0 0 0 N o Q) 0 Q) a) m m 0 a) 0 r) te a 0) N LiJ Q 0 0 0 c0 rn t; N 4- i 0 6 WATER MAIN CONNECTION DETAIL GRANULAR BACKFILL EXISTING WATER MAIN TAPPING SLEEVE GATE VALVE TAPPING SLEEVE COMPACTED SUBGRADE NO SCALE VARIES 4" REBAR CONT, AT TOP BOTTOM 1.) CONTRACTION JOINTS TO BE M OF 1 2 U A MINIM F 1/2" DEEP R T WALK SECTION FOR K SEC R 0 0 2, SEE CONCRETE L LOCATION OF JOINTS, PH SEPARATORS ARE NOT FULL D T E RTO SA 0 L E S E T PERMITTED EXCEPT AT EXP. JOINTS. E D E XC E SECTION A —A 6" rr Aw Ir r II■■■ VALVE BOX 'Algal 11 11 f GRADE r f -Tf 11 WATER SERVICE TO BLDG. SITE APPLIED ANTI- SPALLING COMPOUND 1 "RADIUS TOOLED ROUND EDGE PAVEMENT 6x6 10/10 WELDED WIRE FABRIC SECTION B —B DISABLED RAMP WITH MULTIPLE DISABLED STALLS ALONG A WALK DETAIL NO SCALE DANDY BAG II Installation and Maintenance Guidelines Installation: Remove the grate from catch basin. If using optional oil absorbents; place absorbent pillow in unit. Stand the grate on end. Move the top lifting straps out of the way and place the grate into the Dandy Bag II so that the grate is below the top straps and above the lower straps. Holding the lifting devices, insert the grate into the inlet. Maintenance: Remove all accumulated sediment and debris from vicinity of unit after each storm event. After each storm event and at regular intervals, look into the Dandy Bag II. If the containment area is more than 1/3 full of sediment, the unit must be emptied. To empty unit, lift the unit out of the inlet using the lifting straps and remove the grate. If using optional oil absorbents; replace absorbent when near saturation. 1:7,7 •Y W W +Y W W W •Y W •Y W W V V V V W 4 1 4 ,SIDEWALK Q o v .n O 4 4. a A 4 LA) PLAN LA VIEW LIFT STRAPS DANDY BAG II STANDARD FABRIC IS AN ORANGE WOVEN MONOFILAMENT DUMPING STRAP ALLOWS FOR EASY REMOVAL OF CONTENTS NOM T SURFACES t=. DETECTABLE WARNINGS ON WALKING SUR ACES SHALL CONSIST OF RAI SED TRUNCATED DOMES WITH A DIAMETER OF NOMINAL IAM F N INCHES, A AL 0.8 C ES HEIGHT OF NOMINAL 0.2 INCHES AND A CENTER -TO— CENTER SPACING OF NOMINAL, 2.35 INCHES AND SHALL CONTRAST VISUALLY WITH ADJOINING SURFACES, DARK—ON—LIGHT. F RH R LIGHT—ON—DARK, R ARK N HT ACES E E OR 0 0 LIG THE MATERIAL USED TO PROVIDE CONTRAST SHALL. BE AN INTEGRAL PART OF THE WALKING SURFACE. DETECTABLE WARNINGS USED ON INTERIOR SURFACES SHALL DIFFER FROM ADJOINING WALKING SURFACES IN RESILIENCY OR SOUND —ON —CANE CONTACT. DANDY BAG II 325 300 275 250 225 200 175 150 125 100 75 50 25 FT. 4;1 3" SHREDDED HARDWOOD MULCH CREATE 4" SAUCER REMOVE UPPER 1/3 OF BURLAP EVERGREEN PLANTING DETAIL REMOVE BINDING FROM TRUNK AFTER PLANTING AND STAKING TREE 3 :1 2:1 NO SCALE TREE PLANTING DETAIL NO SCALE GENERAL STAPLE RECOMMENDATIONS 1:1 SLOPE GRADIENT SOIL MIX: 3 PARTS TOPSOIL 1 PART PEAT. NOTE: HARDWOOD STAKES SHALL BE DRIVEN A MIN, OF 30" INTO THE GROUND 3/4" BLACK RUBBER HOSE WRAP TRUNK TO FIRST BRANCH 7x19 GALV. GUY WIRE 2" SHREDDED HARDWOOD MULCH STEEL TEE FENCE POST 24" AMENDED PLANTING SOIL FINISH GRADE LOW FLOW MED /HIGH FLOW CHANNEL CHANNEL AND SHORELINE 2 "x2 "x8" HARDWOOD STAKES 2 PER TREE WITH #12 GALV. WIRE 1/2" HOSE LOOP REMOVE BINDING AROUND TRUNK AFTER PLANTING AND STAKING ID NOTE: 1. CHANNEL LINING UTILIZE STAPLE PATTERN "C" WITH ADDITIONALI STAPLES ON SIDE SLOPES AT PROJECTED WATER UNE. 2. STAPLE P APPLY 1'O ALL NORTH AMERICAN GREEN EROSION BLANKETS. STAPLE PATTERNS MAY VERY DEPENDING UPON SOIL TYPE AND AVERAGE RAINFALL, 3, AT SLOPE LENGTHS GREATER THAN 300 FEEL OR WHERE DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE BLANKETS, STAPLE PATTERN "C" SHOULD BE UTILIZED. 6' 1 STAPLE PER 50. YD. N K 2 STAPLE PER SO. YD. 15' SAFETY LEDGE AT A 15:1 SLOPE 0 CONC. OR PAVER FINISH X 3:1 SLOPE MAX, EROSION CONTROL MAT INSTALLATION GUIDE DETAIL NO SCALE 10:1 SLOPE MAX. 3 :1 SLOPE MAX, NOTES; 1, STRIPPING OF 'TOPSOIL PRIOR TO EXCAVATION OR FILING IS REQUIRED. 2. LAKE TO BE CONSTRUCTED WITH A 4" THICK CLAY UNER FROM ON SITE MATERIAL x x x L 3' B 1 1/2 STAPLE PER SQ. YD. x X. x x x .1. x x x 2 x x x x X x X K 3 1/2 STAPLE PER SO, YD, LAKE SECTION NO SCALE 7 3" 0.D. PIPE WITH A SIMILAR COLOR FINISH 4 :1 SLOPE MAX. 3:1 SLOPE MAX. NORMAL POOL ELEVATION NUT W/ LOCKING WASHER SLOPE TO DRAIN 1/4" SLOPE PER FOOT CLASS "A" CONCRETE STOP SIGN DETAIL NO SCALE 15' SAFETY LEDGE AT A 15 :1 SLOPE 3:1 SLOPE MAX. WELDED CAP /—ROU HEAD ND BOLTS SHEET NO. C602