Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
L101 Landscape Plan APPROVED
Plant Type K y Number Size Botanical Name Common Name Remarks Ever Breen Trees 0 sg;H 14 4' Tall Min. B/B Jun'perus c. 'Hetzii' H©tz Juniper Evergreen Trees Must ba 6' Tall Min. at Time of Planting Evergreen Shrubs Ilk ti TM) 14 6' Min. B/B Taxis m. 'Densiformis' Compact Yew ISERIMICEM 1— Z Q 0— CC w O F- Z O 1- w to O t'3 CC 2 O O v J w CC U 1 NOTE: SEED ALL DISTURBED LAWN AREAS >000 14 -JCH PLANT MATERIAL SCHEDULE NOTE: SEED ALL DISTURBED 14 -TMD LAWN AREAS 0 0 813 0 0 0 1 813 1 1 814 1 WEDGE ASPHALT TO PROVIDE SMOOTH TRANSITION TO NEW FINISHED FLOOR ELEVATION r o o Shrub Planting Section (Not To Scale) NOTE: SEED ALL DISTURBED LAWN AREAS RECONNECT EXISTING TO NEW Slow Release Fertilizer Tablets Per Manufacturer's Recommendations Plant Shrub With Root Flare at Grade Level 3' Shredded Hardwood Mulch Do Not Pile Mulch on Shrub Stem Remove All Wire, Strings And Burlap From Top Of Ball Finish Grade 4' High Compacted Saucer Planting Mixture f 0 0 i a o z z LANDSCAPE TIMBERS 'WATER SPIGOT -T--- ->f Plant Trees With Root Flare at Grade Levet 3' Shredded Hardwood Mulch Do Not Pile Mulch on Tree Trunk Remove All Wire, Strings And Burlap From Top Of Ball Finish Grade, Plant Tree 6' Higher Than Grade 4' High Compacted Saucer Slow Release Fertilizer Tablets Per Manufacturer's Recommendations Planting Mixture Evergreen Tree Planting Section (Not To Scale) LANDSCAPE NOTES 1. All planting beds are to incorporate Dewitt Weed Barrier, or equivalent, between a minimum of three inches of shredded hardwood Mulch and a minimum of six inches of topsoil or planting mix, An approved pre emergent herbicide shall be applied in all planting beds before and after mulching at rates specified by the manufacturer, a All soil in designated planting areas to be loosened to depth of 6 inches prior to planting, a It is the landscape contractor's responsibility to provide and verify that the topsoil in the planting areas is not over compacted and is reasonably free from subsoil, stones, clowned timber, brush, roots, stumps, rubbish, broken concrete, and any other material that may impede the establishment of the proposed plant material. 4. All trees and evergreen plant material to be balled and burlapped, unless otherwise noted, 5. Alt shrubs may either be container grown, or balled and burlapped, 6, The landscape contractor shall supply alt plant material in quantities sufficient to complete all plantings shown on the drawings. If quantities of plant materials shown on the drawings conflicts with quantities given on the plant list, the quantities shown on the drawings shall supersede the plant list, 7, Any deviation from }he project specifications effecting the health, handling, fertilization, maintenance and general condition of the specified plant material must be presented to the owner in written format for approval prior to execution. The landscape contractor shalt assume full responsibility and associated cost for all changes made without proper approval, 8. All plant material to be planted at the same relative depth as before transplanted, 9. Flood all plants twice during the first twenty -four hour period after planting. 10. Begin maintenance it ,mediately after planting and continue until final acceptance, 11. All plant material shalt be guaranteed for one full year from date of acceptance, 12, Alt plants to be guaranteed and maintained to be in healthy condition for one full year after acceptance of all planting, 13. All new planting material shalt meet or exceed (ASNS) American Standards for Nursery Stock Specifications of Quality, 14. All proposed plant materials are shown at 3/4 mature growth. Space as indicated on plant list or to proper horticultural methods, 15. Tree caliper size indicates the diameter of the trunk taken at 6 inches above ground levet or top of root ball, 16. All planting bed tines are to have a cleared spade cut edge to a minimum depth of 4 inches, 17, Keep the soil of a`.t balled and container plants moist until they are planted, If plants cannot be planted immediately, they should be heeled in and balls /containers should be covered with mulch, The location of' a designated landscape material staging area shall be determined by both the Landscape contractor' and the owners on site representative. 18. The landscape con shalt coordinate all finish grading of all lawn areas with the general contractor and owner prior to beginning any final grading work. A minimum of 4' inches topsoil shall be provided over all lawn areas receiving seed or sod. Alt work shall be in accordance with the Project Specif ica cions Section 02900 and 02930. 19. Contact all Utility Companies to locate alt mains, conduits, service lines, etc,, in the affected construction area, 20, The location and protection of utility structures and facilities, their support and maintenance during landscape construction (in cooperation with applicable utility) is the expressed responsibility of' the landscape contractor, 21, The landscape contractor is responsible for coordinating and scheduling the landscape installation with other site work to assure proper placement of plant materials and other landscaping, .MKS 0: 11994\ 94501\ 100101CADIENG\CDsIL101.dwg, 9/14/2004 3:46:53 PM, mwag w 0 0 a FIED BY: 0 z 1 w w z z w z 0 F 0 a_ z Q rn 0' LO I t. c0 N 0 4- .D 0 Q a� z o- Q z_ J x Q LL 0 N N C° Q N mot o03 c/D 0 0 0 W RF .1. cr.. y Q E pos TEfio r PE19900458 r s STATE OF 41 0;>.f#DIAN?:.- ti moo 9 4- Ut94 Drawn By: Check4 Q Quality Assurance: AMR Scale: 1' 10' MINI NNE L101 09-14-04 w oes 0N) w cO CC co Q w (r) z w Q U co MAW AMR Project Number 94501 -10010