HomeMy WebLinkAboutC03.0 Grading PlanDWN BY:
JCB
CHKD. BY:
BSC
SCALE:
1" 30'
DATE:
10/19/05
FLAIR NORTH, SECTION ONE
Lot 22
0
co
84
FH c
V
CO
-4
N
(Plat Book 2, page 277)
1 837.061
UTILITY COMPANIES
GAS
VECTREN
15900 AWSONVILLE ROAD
NOBLESVILLE, IN 46060
ATTTN: JIM
TELEPHONE
SBC
5858 NORTH COLLEGE AVENUE
INDIANAPOLIS, IN. 46220
(317) 252 -4274
ATTN: GREG COMMACK
STORM DRAINAGE COUNTY
HAMILTON COUNTY SURVEYORS OFFICE
ONE HAMILTON COUNTY SQUARE, STE. 188
NOBLESVILLE, IN 46060
(317) 776 -8495
ATTN: KENT WARD
STORM DRAINAGE CITY
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE
CARMEL, IN. 46032
(317) 571 -2441
ATTN: MIKE MCBRIDE
36.09 835.40 1
Lo; 21
R -4
R -2
ELECTRIC
CINERGY
1441 SOUTH GILFORD
CARMEL, IN 46032
(317) 581 -3048
ATTN: DEAN GROVES
CABLE TV
BRIGHTHOUSE CABLE COMPANY
516 EAST CARMEL DRIVE
CARMEL, IN 46032
(317) 844 -8877
ATTN: JEFF FARMER
SANITARY SEWER
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE
CARMEL, IN. 46032
(317) 571 -2441
ATTN: MIKE MCBRIDE
STREETS
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE
CARMEL, IN. 46032
(317) 571 -2441
ATTN: MIKE MCBRIDE
Lot 20
PAVING NOTE
ALL PAVING WITHIN TIFIE EXISTING AND PROPOSED RIGHT -OF -WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF
ENGINEERING. CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE CONSTRUCTION MEETING TO
REVIEW THE DEPARTMpNT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN
STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND
PROPOSED CITY RIGHT -OF -WAY.
CONSTRUCTION OMITS
L
4 LNDS t K
m
"DON'T
DIG
BLIND"
"HOLEY MOLEY"
SEZ:
MEM MIND 41111110 1=0
"IT'S THE
LAW"
INDIANA UNDERGROUND PROTECTION SERVICE INC.
CALL TWO WORKING DAYS BEFORE YOU DIG
1- 800 382 -5544
CALL TOLL FREE
1- 800 428 -5200
FOR CALLS OUTSIDE OF INDIANA
r
x- I83f'ooI
1830.441
f r Nor
Tc 829.80
>0829:831 BC 829.30
830.06
Storm
inlet
\ir V
4 0
829221
0
0
CONSTRUCTION LIMITS
GRADING NOTES
OLD
91.98'
829.501 1 J 829.33, 829.171
_;onerate_p_ a1
B -3
TOW \E VILLIACE
(Instrument Number 9709749345)
(Plat Cabinet 2, Slide 49)
TC 833.20
BC 832.70
TC/832.80
BC 832.30
TC 832:50
BC 832.00
TC 830 0
BC 829,70
`828.5
BLDG. #12
F.F.E.
830.50
TC 832.40
BC 831.90
TC 830.52
BC 830.02
MI2ES
TC 829.93
BC 829.43
TC 829.17
BC 828.67
It 829.77
BC 829.27
TC 830.15
BC 829.65
F.F.E.
835.83
TC 836.30
BC 835.80
It 834.75
BC 834.25
TC 834.00
BC 833.50
TC '834.00
BC 833.50
TC 833.70
BC 833.20
N C4I<
F.F.E.
37.00
(PRIVATE)
NEUMAN WAY
(PRIVATE)
TC 834.14
BC 833.67
TC 834.37
BC 833.87
835:69 Q `1835.00
F.F.E.
836.33
TC 833.47..
BC 832.97
TC 833.50
BC 833.00
TC 834.00
BC 833.50
F.F.g
833.3
TC 833.25 N (PRIVATE)
BC 832.75
F.F.E. F.F.E. F:F:. I F.F.E.
834.00 833.33 832.67 832.0
BLDG. #3
TC 83
BC 832 9
633.39 83281 832.17
832.35
831.85
TC 830.6
BC 830.11
donor e 31d
r i
F.F.E.
830.00
TC 829.54
BC 829.04
'BLDG. #17
F.F.E.
830.15
TO 829.50
BC 829.00
829.06
TC 829.40
BC 828.90
TC 829.40
BC 828.90
TC 829.40
BC 828.90
82923 '1828.89
F.F.E.
829.80
\BLDG. #16
F.F.E.
829\80
i
829.8q
828.76
827.90
Lot 2
R-4 I I
60.01'
TC 828.84
8C___828.341_
828.921 828.761
1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT
STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY
OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION.
2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO
STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS
FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE
ENGINEER IMMEDIATELY.
3. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN
EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT.
VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS AND /OR UTILITY
COMPANIES SO AS NOT TO CAUSE DAMAGE.
4. THE CONTRACTOR SHALL NOTIFY ALL UTIUTY COMPANIES 72 HOURS BEFORE
CONSTRUCTION IS TO START, TO VERIFY IF ANY UTIUTIES ARE PRESENT ON
SITE. ALL VERIFICATIONS (LOCATION, SIZE AND DEPTH) SHALL BE MADE BY THE
APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING IS AROUND OR OVER
EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY
SO A REPRESENTATIVE OF THAT UTIUTY COMPANY CAN BE PRESENT TO
INSTRUCT AND OBSERVE DURING CONSTRUCTION.
5. TRENCHES FOR ALL STORM DRAIN LINES SHALL BE BACKFILLED COMPLETELY
WITH ENGINEERED GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT.
6. AFTER STRIPPING TOPSOIL MATERIAL, PROOFROLL WITH A MEDIUM WEIGHT
ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE
MATERIAL. THE NECESSITY FOR SUBDRAINS AND /OR REMOVAL OF ANY
UNSUITABLE MATERIAL WITHIN THE PROPOSED PARKING AREAS WILL BE
DETERMINED AT THE TIME OF CONSTRUCTION.
7. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS, AFTER
INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, "BIRD
BATH" CONDITIONS.
8. ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL
GRADE ELEVATIONS.
9. SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW
FINISH GRADE ELEVATIONS INDICATED.
10. FLOW UNE ELEVATIONS GIVEN AT END OF CONCRETE END SECTIONS.
o1
0
0
N
BLDG. #1
F.F.E. F.F.E.
829.00 829.00
1
60.01'
I
r
I
h
i
TC 828.32
BC 827.82
828.481 828.241
0
o
of
m
R
a
a
0
0
DATE
C
LEGEND:
I820.10 I PROPOSED SPOT ELEVATION
TC 820.10
BC 819.60
PROPOSED CURB ELEVATION
STORM STRUCTURE TOP OF CASTING ELEVATION
TOP OF CURB ELEVATION
BC BOTTOM OF CURB ELEVATION
PROPOSED FINISH FLOOR OF GARAGE
PROPOSED CONTOUR
PROPOSED STORM STRUCTURE
PROPOSED DRAINAGE SWALE
EXISTING CONTOUR
EXISTING MANHOLE
EXISTING INLET
FLOW DIRECTION
RIM
TC
F.F.E.
18191
c: z
REVISION RECORD
DESCRIPTION
DES BY
NORTH
30 15 30
IN FEET
1 inch 30 ft.
INSTALLATION WITHIN EXISTING AND PROPOSED CITY RIGHT -OF -WAY
BEDDING, HAUNCHING, AND INITIAL BACKFILL MATERIALS, PLACEMENT
AND COMPACTION FOR WATER MAINS, WATER SERVICE LATERALS,
SANITARY MAINS AND SANITARY SERVICE LATERALS SHALL BE IN
ACCORDANCE WITH THE STANDARD PRACTICE OF THE UTILITY THAT
HAS JURISDICTION OVER THE INSTALLATION. FINAL BACKFILL FOR
WATER MAINS, WATER SERVICE LATERALS, SANITARY MAINS AND
SANITARY SERVICE LATERALS UNDER AND WITHIN 5 FEET OF
PAVEMENT (INCLUDING SIDEWALKS) SHALL BE B- BORROW FOR
STRUCTURE BACKFILL MEETING THE MATERIAL REQUIREMENTS OF
INDOT AND SHALL BE COMPACTED IN 6 INCH MAXIMUM LIFTS TO NOT
LESS THAN 95% STANDARD PROCTOR DENSITY FOR THE ENTIRE
DEPTH OF THE MATERIAL PLACED. THE BACKFILL FOR THE TOP 6
INCHES OF THE EXCAVATION BELOW THE START OF THE AGGREGATE
SUBBASE OF THE PAVEMENT SHALL BE NO. 53 STONE MEETING THE
MATERIAL REQUIREMENTS OF INDOT AND SHALL BE COMPACTED TO
NOT LESS THAN 95% STANDARD PROCTOR DENSITY. IF THE STANDARD
PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE
INSTALLATION HAS A MORE STRINGENT FINAL BACKFILL REQUIREMENT,
THE MORE STRINGENT REQUIREMENT SHALL GOVERN.
BEDDING, HAUNCHING, AND INITIAL BACKFILL FOR ALL RCP
INSTALLATIONS SHALL BE B- BORROW FOR STRUCTURE BACKFILL
MEETING THE MATERIAL REQUIREMENTS OF INDOT. BEDDING SHALL BE
PLACED IN THE TRENCH BOTTOM SUCH THAT AFTER THE PIPE IS
INSTALLED TO GRADE AND LINE, THERE REMAINS A 4 INCH MINIMUM
DEPTH OF MATERIAL BELOW THE PIPE BARREL AND A MINIMUM OF 2
INCHES BELOW THE BELL. BEDDING SHALL BE PLACED TO BE
UNIFORM AS POSSIBLE, BUT SHALL BE LOOSELY PLACED
UNCOMPACTED MATERIAL UNDER THE MIDDLE THIRD OF THE PIPE
PRIOR TO PLACEMENT OF THE PIPE. HAUNCHING AND INITIAL
BACKFILL SHALL BE COMPACTED IN 8 INCH MAX. UFTS TO NOT LESS
THAN 90% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF
THE MATERIAL PLACED. THE BACKFILL SHALL BE BROUGHT UP
EVENLY ON BOTH SIDES OF THE PIPE FOR THE FULL LENGTH OF
THE PIPE. HAUNCHING SHALL EXTEND TO THE SPRINGUNE OF THE
PIPE. THE OMIT OF INITIAL BACKFILL SHALL BE 6 INCHES ABOVE THE
SPRINGLINE. MINIMUM TRENCH WIDTH SHALL BE THE OUTSIDE
DIAMETER OF THE PIPE PLUS 18 INCHES. FINAL BACKFILL FOR ALL
RCP INSTALLATIONS UNDER AND WITHIN 5 FEET OF PAVEMENT
(INCLUDING SIDEWALKS) SHALL BE B- BORROW FOR STRUCTURE
BACKFILL MEETING THE MATERIAL REQUIREMENTS OF INDOT AND
SHALL BE COMPACTED IN 6 INCH MIN. LIFTS TO NOT LESS THAN 95
STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE
MATERIAL PLACED. THE BACKFILL FOR THE TOP 6 INCHES OF THE
EXCAVATION BELOW THE START OF THE AGGREGATE SUBBASE OF THE
PAVEMENT SHALL BE NO.53 STONE MEETING MATERIAL REQUIREMENTS
OF INDOT AND SHALL BE COMPACTED TO NOT LESS THAN 95%
STANDARD PROCTOR DENSITY. FINAL BACKFILL FOR ALL RCP
INSTALLATIONS GREATER THAN 5 FEET FROM ANY PAVEMENT SHALL
BE CLEAN FILL MATERIAL FREE OF ROCKS LARGER THAN 6 INCHES IN
DIAMETER, FROZEN LUMPS OF SOIL, WOOD OR OTHER EXTRANEOUS
MATERIAL, COMPACTED IN 12 -INCH MAXIMUM UFTS TO NOT LESS
THAN 90% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF
THE EXCAVATION.
NQ
Z. PE10403858
STATE OF
r --o e'
S S /ONA1 -E i si S
`f i'if 111 0
DATE:
APP BY
LT-1 co
LT-1
O �z
C)4r
Q]z
v�
*t ¢a
Woo
o Q
C)
H
0
z
CEC PROJECT NUMBER
051872
DRAWING NUMBER
C3.0
SHEET 5 OF 16