Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C403 Erosion Control Details
SILT FENCE. SEE DETAIL EC -2. SOIL OR GRASS STRIP. INSTALLATION 1. FILL BAGS APPROXIMATELY HALF FULL WITH SAND OR FINE GRAVEL 2. UPSLOPE FROM THE CURB INLET, LAY THE BAGS TIGHTLY END TO END IN A ROW CURVING FROM THE CURB AND AWAY FROM THE INLET. 3. OVERLAP THE BARRIER ONTO THE CURB, AND EXTEND IT A MINIMUM OF 3 FT. INTO THE STREET TO INTERCEPT THE RUNOFF. 4. IF USING MORE THAN ONE ROW, OVERLAP THE BAGS WITH THE ROW BENEATH, AND LEAVE A ONE -BAG GAP IN THE MIDDLE OF THE TOP ROW TO SERVE AS A SPILLWAY. 5. FOR ADDITIONAL STORAGE CAPACITY, CONTRUCT A SERIES OF SANDBAG BARRIERS ALONG THE CURB SO EACH ONE TRAPS SMALL AMOUNTS OF SEDIMENT. 6. PLACE SILT FENCE ONE FOOT BEHIND INLET. SEE DETAIL EC -2 FOR INSTALLATION. 7. IF INLET IS NOT LOCATED IN A SADDLE, THE BAGS ON THE DOWNSLOPE SIDE OF THE INLET ARE NOT REQUIRED. MAINTENANCE 1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR IF NEEDED. 2. INSPECT AFTER EACH STORM EVENT. 3. REMOVE SEDIMENT (BUT NOT BY FLUSHING) WHEN IT REACHES HALF THE HEIGHT OF THE BARRIER. 4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS. EC -2 NO SCALE GEOTEXTILE FABRIC TO STABIUZE FOUNDATION (ESPECIALLY IMPORTANT WHERE WETNESS IS ANTICIPATED) ST -50 CURB INLET PROTECTION NO SCALE NO SCALE MATCH EXISTING 2' EXISTING SOILS TYPICAL SWALE DETAIL MAINTENANCE 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL 3. TOPDRESS W[EH CLEAN STONE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBUC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. 5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. EMPORARY CONSTRUCTION ENTRANCE MATCH EXISTING GROUND SLOPE GROUND SLOPE Jr '41 II. Il -tf- j u=!! ittilo -14=414.11 F P�` 1 ti` I tI"ft .,R�it=- tt^-,■ t If }I :a STEP 1: EXCAVATE A6'X4"DEEP TRENCH STEP 3: MAINTENANCE 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABIUZE. SILT PROTECTION FOR DITCH GRATE (NEENAH R -4342) CASTINGS. MAINTENANCE 1. INSPECT THE STRUCTURE AFTER EACH STORM EVENT. 2. REMOVE ACCUMULATED SEDIMENT AND MAKE NEEDED REPAIRS IMMEDIATELY. 3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABIUZED, REMOVE AND PROPERLY DISPOSE OF ALL CONSTRUCTION MATERIAL AND SEDIMENT AND STABIUZE. ri an' 4 .--1145 ti. s kt psi .0 hot *41.41 it! r�+y .�.iij�i�.��.��:����: %�.�.i�� i,. ��T.�.i�: PIPE CULVERT -1 f I-I t -f 3 RIP -RAP 2" #8 CRUSHED STON d5O= 8• 6' NO SCALE 4' (10cm) CROSS SECTION 3:1 STEP 2: will4 444 4 414. 4 V1 "4,111*-4471+117:44% I DRIVE STAKES IN TRENCH TO ATTATCH SILT FENCE STEP 4: SILT FENCE COMPACTED SOIL FLOW SECTION SILT FENCE BARRIER INSTALLATION WELDED WIRE INLET PROTECTION ollsot END VIEW FASTEN FABRIC TO STAKES AND BURY BOTTOM 8' INTO THE TRENCH PLAN 6.00' MINIMUM 3:1 NO OVVERFALL 2' FILTER FABRIC YARD CASTING GRASS 12" RIPRAP f8 CRUSHED STONE MAINTENANCE 1. INSPECT ROCK CHUTES AFTER STORM EVENTS FOR STONE DISPLACEMENT AND FOR EROSION AT THE SIDES AND ENDS OF THE APRON. 2. MAKE NEEDED REPAIRS IMMEDIATELY; USE APPROPRIATE SIZE STONE, AND DO NOT PLACE THEM ABOVE FINISHED GRADE. I EC -16 NO SCALE END SECTION RIPRAP DETAIL 2` X 2- STAKES NON -WOVEN HEAVY DUTY FABRIC 2" STAKE 0: 119941945011 100401Cad1Eng1CDIAC402- 0403.dwg,10128/2004 3:34:46 PM, mwag z O (7) O W Date Drawn Checked Approved Scale Sheet W 0 0 Q 0 in- g J Fp 6 Z H W W CONSULTANTS cn W 4 Z P Z W Z �f? a= if V ZZ Z Z Q 0 J MAW DJO DAL w 0 1 =30' 08/30/04 0 C r O IC) CO c 0 ZOQ1: Z Q Z U L o r r 0- Qc 5 Z r C40:: Project number PIC 0940501 -1( CONTROL DETAILS BID DOCUMENTS ONLY, PENDING AGENCY APPROVAL CHANGES PER TPiC REVIEW ADDED SHEET 403 1 tO /6 /9 10/28/04 ARCHITECTURE 4 :Ex CIVIL ENGINEERS Y 7172 GRAHAM ROAD 1..',,' INDIANAPOLIS, INDIANA 46250 LANDSCAPE ARCHITECTURE ip,`' a LAND PLANNING 1 i; 441.'t.; (317) 842 -6777 FAX (317) 841 -4798 LAND SURVEYORS 2 -1F E —Mail cripe©cripe.biz TRANSPORTATION ENGINEERS GIS Architects Engineers CARMEL CLAY SCHOOLS 126th AND SHELBORNE ROAD CARMEL, INDIANA 46033 14 s Drawn By: MAW Ciudad By: DJO Quoit/ Assume DAL 0 scole: r NA' Iwo mom Sheet C403 Date 08 -30-04 Project Number 94501 -10040 SILT FENCE. SEE DETAIL EC -2. SOIL OR GRASS STRIP. INSTALLATION 1. FILL BAGS APPROXIMATELY HALF FULL WITH SAND OR FINE GRAVEL 2. UPSLOPE FROM THE CURB INLET, LAY THE BAGS TIGHTLY END TO END IN A ROW CURVING FROM THE CURB AND AWAY FROM THE INLET. 3. OVERLAP THE BARRIER ONTO THE CURB, AND EXTEND IT A MINIMUM OF 3 FT. INTO THE STREET TO INTERCEPT THE RUNOFF. 4. IF USING MORE THAN ONE ROW, OVERLAP THE BAGS WITH THE ROW BENEATH, AND LEAVE A ONE -BAG GAP IN THE MIDDLE OF THE TOP ROW TO SERVE AS A SPILLWAY. 5. FOR ADDITIONAL STORAGE CAPACITY, CONTRUCT A SERIES OF SANDBAG BARRIERS ALONG THE CURB SO EACH ONE TRAPS SMALL AMOUNTS OF SEDIMENT. 6. PLACE SILT FENCE ONE FOOT BEHIND INLET. SEE DETAIL EC -2 FOR INSTALLATION. 7. IF INLET IS NOT LOCATED IN A SADDLE, THE BAGS ON THE DOWNSLOPE SIDE OF THE INLET ARE NOT REQUIRED. MAINTENANCE 1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR IF NEEDED. 2. INSPECT AFTER EACH STORM EVENT. 3. REMOVE SEDIMENT (BUT NOT BY FLUSHING) WHEN IT REACHES HALF THE HEIGHT OF THE BARRIER. 4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS. EC -2 NO SCALE GEOTEXTILE FABRIC TO STABIUZE FOUNDATION (ESPECIALLY IMPORTANT WHERE WETNESS IS ANTICIPATED) ST -50 CURB INLET PROTECTION NO SCALE NO SCALE MATCH EXISTING 2' EXISTING SOILS TYPICAL SWALE DETAIL MAINTENANCE 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL 3. TOPDRESS W[EH CLEAN STONE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBUC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. 5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. EMPORARY CONSTRUCTION ENTRANCE MATCH EXISTING GROUND SLOPE GROUND SLOPE Jr '41 II. Il -tf- j u=!! ittilo -14=414.11 F P�` 1 ti` I tI"ft .,R�it=- tt^-,■ t If }I :a STEP 1: EXCAVATE A6'X4"DEEP TRENCH STEP 3: MAINTENANCE 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABIUZE. SILT PROTECTION FOR DITCH GRATE (NEENAH R -4342) CASTINGS. MAINTENANCE 1. INSPECT THE STRUCTURE AFTER EACH STORM EVENT. 2. REMOVE ACCUMULATED SEDIMENT AND MAKE NEEDED REPAIRS IMMEDIATELY. 3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABIUZED, REMOVE AND PROPERLY DISPOSE OF ALL CONSTRUCTION MATERIAL AND SEDIMENT AND STABIUZE. ri an' 4 .--1145 ti. s kt psi .0 hot *41.41 it! r�+y .�.iij�i�.��.��:����: %�.�.i�� i,. ��T.�.i�: PIPE CULVERT -1 f I-I t -f 3 RIP -RAP 2" #8 CRUSHED STON d5O= 8• 6' NO SCALE 4' (10cm) CROSS SECTION 3:1 STEP 2: will4 444 4 414. 4 V1 "4,111*-4471+117:44% I DRIVE STAKES IN TRENCH TO ATTATCH SILT FENCE STEP 4: SILT FENCE COMPACTED SOIL FLOW SECTION SILT FENCE BARRIER INSTALLATION WELDED WIRE INLET PROTECTION ollsot END VIEW FASTEN FABRIC TO STAKES AND BURY BOTTOM 8' INTO THE TRENCH PLAN 6.00' MINIMUM 3:1 NO OVVERFALL 2' FILTER FABRIC YARD CASTING GRASS 12" RIPRAP f8 CRUSHED STONE MAINTENANCE 1. INSPECT ROCK CHUTES AFTER STORM EVENTS FOR STONE DISPLACEMENT AND FOR EROSION AT THE SIDES AND ENDS OF THE APRON. 2. MAKE NEEDED REPAIRS IMMEDIATELY; USE APPROPRIATE SIZE STONE, AND DO NOT PLACE THEM ABOVE FINISHED GRADE. I EC -16 NO SCALE END SECTION RIPRAP DETAIL 2` X 2- STAKES NON -WOVEN HEAVY DUTY FABRIC 2" STAKE 0: 119941945011 100401Cad1Eng1CDIAC402- 0403.dwg,10128/2004 3:34:46 PM, mwag z O (7) O W Date Drawn Checked Approved Scale Sheet W 0 0 Q 0 in- g J Fp 6 Z H W W CONSULTANTS cn W 4 Z P Z W Z �f? a= if V ZZ Z Z Q 0 J MAW DJO DAL w 0 1 =30' 08/30/04 0 C r O IC) CO c 0 ZOQ1: Z Q Z U L o r r 0- Qc 5 Z r C40:: Project number PIC 0940501 -1( CONTROL DETAILS