Loading...
HomeMy WebLinkAboutBP1-C1.30 Overall Construction Limits PlanCQPYRI3 HT,(C)2004 williamsiassociatesiarcnitects, ltd. Schneider THE SCHNEIDER CORPORATION Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Telephone: 317.826.7100 Fax: 317.826.7200 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering \\\\\1111 No 10100357 5-- 2 0 1 44 •.-;...".2 0 STATE OF 44 -7- x -7- e ,s DI A 111"„ ON Al. .c ill iiin\\ d otcl------ DATE: 8/20/04 THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE HE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION COPYRIGHTED BY THE SCHNEIDER CORP GRAPHIC NORTH v 07 I' 1 L... P CNI OVERALL CONSTRUCTION LIMITS PLAN B poi C1 .30 TSC JOB NO.: 2722.002 OOMMA MAIMMI Arwilemowssi lit NMI MU II IIIIIIM I IIMII IMIMMIUMU MIMEIMINI vuumumi nummin idiunink INUNINUNIIr Min Until 7\c i• r\.\-\, q IMO= WETLAND TO REMAIN UNDISTURBED CONSTRUCTION LIMITS 0,,Ke ASSUMED NORTH SCALE: 1"= 100' 100 0 50 100 GRAPHIC SCALE 1"=100' 200 NICDT7ES HOLEY MOLEY SAYS DON'T DIG BLIND' "IT'S THE LAW CALL 2 WORKING DAYS BEFORE YOU DIG 1-800-382-5544 CALL TOLL FREE PER INDIANA STATE LAW 15-69-1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. All fence ines, trees anc brush within the interior of the cesignated construction limits are to be removed with earth—disturbing activity, with the exception of the cesignatec wetlanc. 2. Lagoon excavation is to commence in tie \E corner of the agoon for initial secimentation collection and to provide an outlet for the water that col ects to prevent ponding during construction. The outlet pipe between structures 116 117 is to be p aced at the time of initial excavation to a low for this water to escape during construction. Excavation shoulc continue moving to the SW in the lagoon witn the lagoon being stabilizec via temporary mu ching and/or seeding as the pond reaches its final depth, or any areas that will remain cormant for 15 cays or more. 3 f the contractor proposes to change the sequence, he/she needs to notify John Sout of the SWCD at 317-773-1406.