HomeMy WebLinkAboutBP1-C1.30 Overall Construction Limits PlanCQPYRI3 HT,(C)2004
williamsiassociatesiarcnitects, ltd.
Schneider
THE SCHNEIDER CORPORATION
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216-1037
Telephone: 317.826.7100
Fax: 317.826.7200
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GIS LIS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering
\\\\\1111
No 10100357 5--
2 0 1 44 •.-;...".2
0 STATE OF 44 -7-
x -7-
e
,s DI A
111"„ ON Al. .c
ill iiin\\
d otcl------
DATE: 8/20/04
THIS DRAWING AND THE IDEAS, DESIGNS
AND CONCEPTS CONTAINED HEREIN ARE
HE EXCLUSIVE INTELLECTUAL PROPERTY
OF THE SCHNEIDER CORPORATION, AND
ARE NOT TO BE USED OR REPRODUCED,
IN WHOLE OR IN PART, WITHOUT THE
WRITTEN CONSENT OF THE SCHNEIDER
CORPORATION
COPYRIGHTED BY THE SCHNEIDER CORP
GRAPHIC NORTH
v 07
I' 1 L... P CNI
OVERALL
CONSTRUCTION
LIMITS
PLAN
B poi
C1 .30
TSC JOB NO.: 2722.002
OOMMA
MAIMMI
Arwilemowssi
lit NMI MU II
IIIIIIM I IIMII
IMIMMIUMU
MIMEIMINI
vuumumi
nummin
idiunink
INUNINUNIIr
Min Until
7\c i• r\.\-\,
q
IMO=
WETLAND TO REMAIN
UNDISTURBED
CONSTRUCTION LIMITS
0,,Ke
ASSUMED NORTH
SCALE: 1"= 100'
100 0 50 100
GRAPHIC SCALE
1"=100'
200
NICDT7ES
HOLEY MOLEY SAYS
DON'T
DIG
BLIND'
"IT'S THE LAW
CALL 2 WORKING DAYS BEFORE YOU DIG
1-800-382-5544
CALL TOLL FREE
PER INDIANA STATE LAW 15-69-1991.
IT IS AGAINST THE LAW TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING
DAYS BEFORE COMMENCING WORK.
All fence ines, trees anc brush within the interior
of the cesignated construction limits are to be
removed with earth—disturbing activity, with the
exception of the cesignatec wetlanc.
2. Lagoon excavation is to commence in tie \E
corner of the agoon for initial secimentation
collection and to provide an outlet for the water
that col ects to prevent ponding during
construction. The outlet pipe between structures
116 117 is to be p aced at the time of initial
excavation to a low for this water to escape
during construction. Excavation shoulc continue
moving to the SW in the lagoon witn the lagoon
being stabilizec via temporary mu ching and/or
seeding as the pond reaches its final depth, or
any areas that will remain cormant for 15 cays
or more.
3 f the contractor proposes to change the
sequence, he/she needs to notify John Sout of
the SWCD at 317-773-1406.