HomeMy WebLinkAboutBP1-C1.80 General Specswilliams!associates/aTtnitects, ltd.
C
Schneider
THE SCHNEIDER CORPORATION
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216 -1037
Telephone: 317.826.7100
Fax: 317.826.7200
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GIS LIS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering
gi HN DI 110
No.t01(?0357 c%
j O STATE OF
i F S'S DI AN
wdea. DATE:
8/20/04
THIS DRAWING AND THE IDEAS, DESIGNS
AND CONCEPTS CONTAINED HEREIN ARE
THE EXCLUSIVE INTELLECTUAL PROPERTY
OF THE SCHNEIDER CORPORATION, AND
ARE NOT TO BE USED OR REPRODUCED,
IN WHOLE OR IN PART, WITHOUT THE
WRITTEN CONSENT OF THE SCHNEIDER
CORPORA RON
COPYRIGHTED BY THE SCHNEIDER CORP.
i
CARMEL CLAY PARKS RECREATION
CENTRAL PARK
MASS EARTHWORK BUILDING PADS
CARMEL- INDIANA -46032
FECTS
PLANNERS
of Stream, Illinois 60188
J Fax 630 221 -1220
t I w i2 (NI
L N
rr:
GENERAL
SPECS.
BPI-
C1.80
TSC JOB NO.: 2722.002
EARTHWORK
SCOPE OF WORK
A. Extent: The work required under this section
consists of all excavating, filling, rough grading
and related items necessary to complete the work
indicated on the drawings and described in the
specifications. The Contractor shall notify in
writing the owners and the Engineer of any changes,
errors, or omissions found on the plans or in
the field, before work is started or resumed.
3. REMOVAL OF TREES
In general, the items of work to be
performed under this section shall include:
clearing and grubbing, removal of trees and
stumps (where required), protection of trees
to remain, stripping and storage of topsoil,
fill compaction and rough grading of entire
site.
2. Excavated material that is suitable may be
used for fills. All unsuitable material shall
be buried on site, or removed off site, and
disposed by the contractor. All surplus
excavated material not required shall be
stockpiled on site where designated by
the Engineer.
3. Provide and place any special fill
material from off the site as may be
required. Fill obtained from off site
shall be of kind and quality as specified
and the source approved by the Owner.
4. The Contractor shall accept the site as he
finds it and shall remove all trash, rubbish
and debris from the site prior to starting
excavation.
B. Work not included: The following items of
related work are specified and included in other
sections of these specifications:
1. Excavation, grading and backfilling for
utility lines
2. Storm drainage systems
3. Sanitary sewer systems
4. Streets and paving
5. Water supply system
2. BENCH MARKS
Maintain carefully all bench marks, monuments and other
reference points; if disturbed or destroyed, contractor
shall contact engineer.
A. Remove all trees and stumps from area to be
occupied by road and surfaced areas. Removal of
trees outside these areas shall only be done as
noted on drawings or approved by the Owner.
B. All brush, stumps, wood and other refuse from the
site shall be buried onsite or removed to disposal
areas off of the site. Disposal by burning shall not
be permitted unless proper permits are obtained
(where applicable). The location of on site bury
pits shall be designated by the owner or the
Engineer.
4. PROTECTION OF TREES
A. General Protection: The Contractor shall be
responsible for the protection of tops, trunks
and roots of existing trees on the project site
that are to remain. Existing trees subject to
construction damage shall be boxed, fenced or
otherwise protected before any work is started;
do not stockpile within branch spread. Remove
interfering branches without injury to trunks and
cover scars with tree paint.
5. HANDLING OF TOPSOIL
A. Remove all organic material from the areas to be
occupied by buildings, roads, walks and parking
areas. Pile and store topsoil at a location
where it will not interfere with construction
operations. Topsoil shall be reasonably free
from subsoil, debris, weeds, grass, stones, ect.
B. After completion' of site grading and subsurface
utility installation, top soil shall be replaced
in areas designated on the erosion control plan
for seeding and /or sodding. Any remaining top
soil shall be used for finished grading around
structures and landscaping areas.
6. DISPOSITION OF UTILITIES:
A. Rules and regulations governing the respective
utilities shall be observed in executing all work
under this section.
B. If active utilities are encountered but not shown
on the drawings, the Engineer shall be advised
before work is continued.
C. Inactive and abandoned utilities encountered in
excavating and grading operations shall be
reported to the Engineer. They shall be removed,
plugged or capped as directed by the Utility
Company and the Engineer.
D. It shall be the responsibility of each contractor
to verify all existing utilties and conditions
pertaining to his phase of the work. It shall
also be the contractors responsibility to contact
the owners of the various utilities before work
is started.
7. SITE GRADING:
A. Grades: Contractor shall perform all cutting,
filling, compactiing of fills and rough grading
required to bring entire project area to grade as
shown on the drawings.
B. Rough Grading: the tolerance for paved areas
shall not exceed 0.04 feet plus or minus above
the established subgrade. All other areas shall
not exceed 0.10 feet plus or minus the
established grade. All banks and other breaks in
grade shall be rounded at top and bottom. Adjust
subgrade elevations for topsoil thickness for areas
receiving topsoil and seed.
C. Compaction Requirements:
1. All building pad areas shall be compacted to
standards specified by local and /or state
building codes. Minimum compaction shall
be 100% of Standard Proctor Density.
8. Earth Work Balance
2. For compaction requirements of paved areas,
see street specifications.
The Contractor shall confirm all earthwork quantities
prior to start of construction. If an excess or
shortage of earth is encountered, the Contractor shall
confirm with the Owner and Engineer the requirements
for stockpiling, removal or importing of earth.
Minor adjustments to the grades may be required to
balance earthwork when minor excess material or
shortages are encountered. It is recognized by the
parties hereto that the calculations of the Engineer
in determining earthwork quantities shall be ac-
complished in accordance with the American Society of
Civil Engineers Standards for such calculations.
Further, that these calculations are subject to the
interpretations of soil borings as the physical limits
of the various soil types, also the allowable variation
in finish grade and compaction permitted the contractor,
and that all of these parameters may cause either an
excess or shortage of actual earthwork materials to
complete the project. If such an actual minor excess or
shortage of materials occurs, the contractor shall
contact the engineer to determine if adjustment can be
made to correct the imbalance of earth.
SANITARY SEWER SYSTEMS
1. SCOPE OF WORK
The work under this section includes all sanitary
sewers, manholes, cleanouts and related items including
excavating and backfilling, necessary to complete the
work shown in the drawings, starting five feet outside
the building walls. The ends of sewers shall be
tightly plugged or capped at the terminal points,
adjacent to buildings, pending the connecting of all
such lines to the building drain as specified in the
plumbing specifications and architectural drawings.
2. MATERIALS
A. Sanitary Sewers
1. All gravity plastic sewer pipe and fittings
shall conform to ASTM D3034 with a cell
classification of 12454 C. Flexible
gasketed compression joints shall be used
for PVC pipe. No solvent cement
joints shall be allowed.
3. APPLICATION
A. Permits and Codes The contractor's bid on
contractor's bid on the work covered herein shall
be based upon the drawings and specifications
and compliance with all applicable codes and
regulations as amended by any waivers. Contractor
shall furnish all bonds necessary to get permits
for cuts and connections to existing sewers.
B. Local Standards The term "local standards" as
used herein means the standards of design and
construction of the respective municipal
department or utility company:
Clay Township RWD
N TO FOR PRIVATE SEWER DEVELOPMENT
I SEWER SPECIFICATIONS BE USED 0
TYPICAL SANITARY SEWER SEC C 0 S 0
WITHIN CLAY TOWNSHIP REGIONAL WASTE DISTRICT
REVISED MAY 2002
1. Standard specifications of the District and Indiana Deportment of Transportation shall apply
far all work and materials. Pipe shall be installed in accordance with Section 715.
2. Sanitary sewer pipe shall be PVC in accordance with ASTM D -3034 (S.D.R. 35) and ASTM
2321. PVC pipe shall have grooved bell and gasket. The pipe shall be made of PVC plastic
having a cell classification of 12454B.
3. PVC sewer fittings shall conform to the requirements of ASTM D- 3034 -89 specification.
Fittings in sizes through 8" shall be molded in one piece with elastomeric joints and
minimum socket depths as specified in sections 6.2 and 7.3.2. Fittings 10" and larger shall
be molded or fabricated in accordance with section 7.11 with manufacturers standard pipe
bells and gaskets. Wall thickness of fittings shall be SDR 26 as defined in section 7.4.1 of
specifications. Gaskets for elastomeric joints shall be molded with o minimum crosssectional
area of 0.20 square inches and conform to ASTM F -477 specification. Fittings
shall be manufactured by Harco or equal.
4. All sanitary manholes shall be precast concrete manholes in accordance with ASTM C -478
and Section 720. 0 -rings shall conform to C -443. Kent Seal or equivalent shall also be
applied to all joints and between riser rings and castings. Manhole step spacing shall be no
more than 16- inches. Manholes shall be air tested for leakage in accordance with ASTM
C1244 -93, Standard Test Method for Concrete Sewer Manholes by the Negative Air
Pressure (Vacuum) Test.
A. Installation and operation of vacuum equipment and indicating devices must be in
accordance with manufacturers recommendations and performance specifications
which have been provided by the manufacturer and accepted by the Engineer. The
vacuum equipment must be capable of testing the entire manhole, including the
casting and riser rings.
B. With the vacuum tester set in place:
1. Connect the vacuum pump to the outlet port with the valve open.
2. Draw a vacuum of ten (10) inches of Hg. and close the valve.
C. Accepted standards for leakage will be established from the elapsed time for a
negative pressure change from ten (10) inches to nine (9) inches of mercury. The
maximum allowable leakage rate for a four (4) foot diameter manhole must be in
accordance with the following:
Minimum Elapsed Time for a Manhole Depth Pressure Change of 1 Inch Hg 10 feet or less 60
seconds
>10 feet but <15 feet 75 seconds
>15 feet but <25 feet 90 seconds
For manholes five (5) feet in diameter, add an additional fifteen (15) seconds and for
manholes six (6) feet in diameter, add an additional thirty (30) seconds to the time
requirements for four (4) foot diameter manholes. For all manholes deeper than
twenty -five (25) feet, the Engineer will determine the applicable minimum elapsed
time.
D. If the manhole fails the test, necessary repairs must be made and the vacuum test and
repairs must be repeated until the manhole passes the test.
E. If manhole joint sealants are pulled out during the vacuum test, the manhole must be
disassembled and the joint sealants replaced.
F. Manholes will be subject to visual inspection with all visual leaks being repaired.
5. Butyl rubber coating shall be applied around each manhole joint from 6- inches above to
6-
inches below each joint. The appropriate primer shall be applied prior to applying the rubber
coating. Inside joints to be filled with precoat plug material.
6. The manhole chimneys, including all riser rings shall be sealed using Infi- Shield Uniband
or approved equal. Prior to placement, the top 4- inches of the manhole cone and casting
frame shall be cleaned and primed. The Uniband shall extend from 3- inches below the top
of the cone section to 2- inches over the flange of the manhole costing frame.
7. The casting elevations are set by plan. However, the castings are to be adjusted in the
field
by the Engineers representative should a discrepancy occur between plan grade and existing
grade. New manhole ring and cover shall be installed to establish grade. Maximum height
of adjusting rings shall be 12- inches.
8. Backfill around all structures and all cuts under paved areas with granular material.
Trenches opening within 5 -feet of paved roadways shall be backfilled with granular material
in accordance with Section 211. Backfill under sidewalks shall be granular, unless the walks
are constructed a minimum of 6 months after backfill has been in place.
9. The Contractor shall be responsible for verifying that all state highways, city, and county
permits have been obtained by the developer prior to start of construction.
10. The Contractor shall be required to furnish the developer's Engineer with a set of prints,
marked in red pencil, showing actual sewer location and invert, to include lateral location,
depth and length. Such asbuilt prints must be received by the Engineer before the final
contract payment can be authorized. The sanitary sewer laterals and stubs termination shall
be indicated on the surface with a metal fence post set immediately above the said
termination point.
11. All sanitary sewer lines upon completion will be required to pass a low pressure air test.
Said test shall be conducted according to ASTM 1417 -92, and shall be witnessed by an
Engineer and a representative of the District. The testing shall be in accordance with Table
1. Add 0.5 psig for each foot of water above the sewer line being tested.
12. Deflection tests shall be performed on all flexible* pipe after the final backfill has been in
place at least 30 days. No pipe shall exceed a vertical deflection of 5% deflection test
results. *The following are considered non flexible pipes: concrete pipe, ductile iron pipe,
and cast iron pipe). The deflection test shall be performed with a nine -point mandrel.
Proving rings shall be available.
13. All mandrel testing shall be observed by a professional engineer representative for
certification and a representative of the District.
14. The ends of laterals are to be plugged tight with a braced plastic disc or cap capable of
withstanding a low pressure air test without leakage.
15. Bedding for flexible pipe shall be No. 8 crushed stone from 6- inches below the pipe to 12-
inches above the pipe. Bedding for rigid pipe shall be No. 8 crushed stone from 6- inches
below the pipe to the spring line of the pipe and from this point to 12- inches above shall be
fill sand or equivalent. Manholes shall be placed on no less than 6- inches of No. 8 crushed
stone bedding.
16. Water and sewer line crossings and separations shall be in accordance with 327 IAC 3 -6 -9.
17. Trench shall be opened sufficiently ahead of pipe laying to reveal obstruction, and shall be
properly protected and /or barricaded when left unattended.
18. No water shall be permitted to flow into the sanitary sewer system during construction.
Contractor shall utilize a pump to keep the water level below the pipe. Pump discharge shall
be directed to a storm outlet in accordance with state and federal laws and regulations (327
IAC 3- 6 -20). Any pipe entering existing sewers shall be plugged with screw type
mechanical, braced plug until such time as all tests on the sewers have been completed and
the lines have passed all punch lists.
19. All sewer laterals installed by the mainline Contractor shall be bedded the same as the main
line sewer.
20. Forty -eight (48) hours notice shall be given to the District prior to the start of sewer
construction. Also, 48 hours notice shall be given prior to doing any testing on the sewer.
21. Manhole castings shall be stamped SANITARY SEWER (Neenah Casting R 1642A or
equal) and be self sealing type. The casting flange shall be 34 inches and the clear opening
shall be 24 inches. Waterproof castings shall be Neenah R- 1916 -F1 and stamped
SANITARY SEWER.
22. The minimum slope for sewer acceptance by the Clay Township Regional Waste District are:
Size of Pipe Minimum Constructed Slope
8 -inch 0.40%
10 -inch 0.28%
12 -inch 0.22%
15 -inch 0.15%
18 -inch 0.12%
23. The Contractor shall provide measurements of the slope of the sewer for each manhole
section as construction progresses. Such measurements shall be certified by a Registered
Land Surveyor or Engineer and be available on -site for observation by the District's
Inspector. No more than three manhole sections can be constructed in advance of such
measurements.
24. In the event the Contractor does not meet the minimum slopes, the sewer section and any
other affected sewer sections shall be reconstructed to meet such minimum slopes.
25. Laterals are to be traced with a minimum size of 14 gouge wire from the wye to the terminus.
The contractor for the building or home will extend the wire from this terminus to the
building cleanout adjacent to the building.
C. Existing Improvements Maintain in operating
condition all active utilities, sewers and other
drains encountered in the sewer installation.
Repair to the satisfaction of the owner any damage
to existing active improvements.
D. Workmanship To conform to all local, state and
national codes and to be approved by all local and
state agencies having jurisdiction.
E. Trenching Lay all pipe in open trenches, except
when the local authority gives written permission
for tunneling. Open the trench sufficiently ahead
of pipe laying to reveal any obstructions. The
width of the trench shall be the inside pipe
diameter plus 24 inches for 12 inches above the
pipe. Sheet and brace trench as necessary to
protect workmen and adjacent structures. All
trenching to comply with Occupational Safety and
Health Administration Standards. Keep trenches
free from water while construction is in progress.
Under no circumstances shall pipe or appurtenances
be laid in standing water. Conduct the discharge
from trench dewatering to drains or natural
drainage channels.
F Special Supports Whenever, in the opinion of the
Engineering, the soil at or below the pipe grade
is unsuitable for supporting sewers and
appurtenances specified in this section, such
special support, in addition to those shown or
specified, shall be provided as the Engineer may
direct, and the contract will be adjusted.
G. Backfilling for a depth of at least 12 inches
above the top of the pipe, backfill with 12" of #8 crushed
stone or #8 fractured face aggregate. Compact this backfill
thoroughly, taking care not to disturb the pipe. For the
remaining trench depth, backfill with earth or
granular material containing stones or rocks not
larger than 4 inches. Backfill under and within
5' of walks, parking areas, driveways and streets
shall be granular material only thoroughly
compacted, by approved methods.
H. Flow Channels The flow channels within manholes
shall be an integral part of the precast base.
The channels shall be shaped and formed for a
clean transition with proper hydraulics to allow
the smooth conveyance of flow through the manhole.
The bench wall shall be formed to the crown of the
inlet and outlet pipes to form a "U" shaped
channel. The bench wall shall slope back from the
crown at 1/2 inch per foot to the manhole wall.
Infiltration The contractor shall furnish
necessary equipment to test sewers for
infiltration. Infiltration rates shall not exceed
the Local Standards. All sanitary sewer lines
upon completion will be required to pass a low
pressure air test, unless otherwise directed by
Aqua Source. Said test shall be conducted
according to NCPI Standard Method, and shall be
witnessed by an inspector authorized by Aqua Source.
Infiltration under test shall not exceed 100 gallons
per inch of inside diameter of sewer pipe per mile
of sewer in 24 hours and inclusive of all
appurtenances within the section being tested such
as manholes, house connections, etc.
J. Flushing Sewers Flush all sanitary sewers except
building sewers with water to obtain free flow
through each line. Remove all silt and trash from
appurtenances just prior to acceptance of work.
K. Plastic Sewer Pipe Installation Plastic sewer
pipe shall be installed in a accordance with ASTM
02321 per latest revision and no plastic pipe
shall exceed a deflection of 5
L. Storm Water Connections No roof drains, footing
drains and /or surface water drains may be
connected to the sanitary sewer systems, including
temporary connections during construction.
M. Waterline Crossing Waterlines and sanitary sewers
shall maintain a minimum of 10 foot horizontal
separation and a minimum 18 inches of clearance
between pipes at crossings. Otherwise, sanitary
sewer within 10 feet of waterlines shall be
constructed of water works grade Ductile Pipe
mechanical joints and fittings.
N.
Utilities It shall be the responsibility of
each contractor to verify all existing utilities
and conditions pertaining to his phase of the
work. It shall also be the contractors
responsibility to contact the owners of the
various utilities before work is started. The
contractor shall notify in writing the owners and
the engineer of any changes, errors or omissions
found on these plans or in the field before work
is started or resumed.
0. Service Laterals Individual lot service lines
shall be 6" in diameter and of material equal to
that specified in 2A of this section. Service
lines shall be connected to the main sewer by a
wye at locations generally shown within these
plans. Service lines shall be extended and
capped at a point 5 feet beyond the right -of -way
line or one pipe length for those services on the
same side of the street as the main. Sewer
service lines shall be marked on the curb.
STORM SEWER SYSTEMS
1. SCOPE OF WORK
The work under this section includes all storm sewers,
storm water inlets, and related items, including
excavating and backfilling, necessary to complete the
work shown on the drawings.
2. MATERIALS
A. Storm Sewers
2. Corrugated PE Pipe and Fittings: AASHTO M 294,
Type S, with smooth waterway coupling joints.
B. SUBDRAINS
Reinforced concrete sewer pipe shall confirm
to ASTM C -76 latest revision, with joints
conforming to ASTM C -443 latest revision.
A. Silttight Couplings: PE sleeve with ASTM D
1056, Type 2, Class A Grade 2 gasket
material that mates with pipe and fittings
to form silttight joints.
1. Perforated plastic pipe subdrains shall
conform to ASTM F -405.
C. Concrete Concrete shall be ready -mixed concrete
and shall be a mix of proportioned fine and
coarse aggregates with Portland cement and water.
Minimum cement content shall be 6 bags per cubic
yard of concrete and maximum water content shall
be 5.5 U.S. gallons per sack of cement, including
moisture in the aggregate. Slump for normal
weight concrete shall be a maximum of 4 inches
and a minimum of 2 inches. the slump of machine
placed concrete shall be no less than 1 -1/4
inches nor more than 3 inches. Standard test
ASTM C -143 shall be used to measure slump.
Compressive strength of concrete at 28 days shall
be 4000 psi. All exterior concrete shall have
air entrainment of 5% to 8% by volume per ASTM C
-260. Retempering of delivered concrete will not
be allowed. Concrete shall be composed of:
3. APPLICATION
Portland cement Conforming to ASTM C -150,
Type IA or Type IIIA.
2. Aggregates: Conforming to ASTM C
3. Water Shall be clear and free from
injurious amounts of oils, acids, alkalies,
organic materials or other deleterious
substances.
A. Permits and Codes The contractor's bid on
contractor's bid on the work covered herein shall
be based upon the drawings and specifications
and compliance with all applicable codes and
regulations as amended by any waivers. Contractor
shall furnish all bonds necessary to get permits
for cuts and connections to existing sewers.
B. Local Standards the term "Local Standards" as
used herein means the standards of design and
construction of the respective municipal
department or utility company.
C. Existing Improvements Maintain in operating
condition all active utilities, sewers and other
drains encountered in the sewer installation.
Repair to the satisfaction of the owner any damage
to existing active improvements. See also Earthwork
Note 6.C.
D. Workmanship To conform to all local, state and
national codes and to be approved by all local and
state agencies having jurisdiction.
E. Trenching Lay all pipe in open trenches, except
when the local authority gives written permission
for tunneling. Open the trench sufficient ahead
of pipelaying to reveal any obstructions. The
width of the trench shall be the inside pipe
diameter plus 24 inches for 12 inches above the
pipe. Sheet and brace trench as necessary to
protect workmen and adjacent structures. All
trenching to comply with Occupational Safety and
Health Administration Standards. Keep trenches
free from water while construction is in progress.
Under no circumstances lay pipe or appurtenances
in standing water. Conduct the discharge from
trench dewatering to drains or natural drainage
channels.
F. Special Supports Whenever in the opinion of the
Engineer the soil at or below the pipe grade is
unsuitable for supporting sewers and appurtenances
specified in this section, such special support,
in addition to those shown or specified, shall be
provided as the Engineer may direct, and the
contract will be adjusted.
G. Backfilling for a depth of at least 12 inches
above the top of the pipe, backfill with earth or
granular material free from large stones, rock
fragments, roots or sod. Tamp this backfill
thoroughly, taking care not to disturb the pipe.
For the remaining trench depth, backfill with
earth or granular material containing stones or
rocks not larger than 4 inches. Backfill under
and within 5' of walks, parking areas, driveways
and street shall be granular material only
thoroughly compacted by approved methods
H. Manhole Inverts Construct manhole flow channels
of concrete sewer pipe or brick, smoothly finished
and of semi circular section conforming to the
inside diameter of the connecting sewers. Make
changes in size or grade gradually and changes in
direction by true curves. Provide such channels
for all connecting sewers at each manhole.
I. Subdrains All subdrains shall be of the size
shown on the plans and shall be constructed to the
grades shown.
J. Utilities It shall be the responsibility of each
contractor to verify all existing utilities and
conditions pertaining to his phase of the work.
It shall also be the contractors responsibility to
contact the owners of the various utilities before
work is started. The contractor shall notify in
writing the owners or the engineer of any changes,
errors or omissions found on these plans or in the
field before work is started or resumed.
K. Contractor to grout joints inside storm
structures where pipes enter or exit
and between structure and casting.
PAVEMENT
1. SCOPE OF WORK
The work required under this section includes all
concrete and bituminous paving and related items
necessary to complete the work indicated on drawings
and described in the specifications, including but not
limited to:
2. MATERIALS
A. Bituminous Pavement Materials All materials
proposed for the construction of bituminous
pavements shall comply with the Indiana Department
of Transportation specifications, per latest
revision.
B. Compacted Aggregate Subbase: Shall be crushed
stone or gravel. Crushed gravel shall be a
minimum of 35% crushed material. Chert shall be
limited to a maximum of 8% of the total. Material
shall be free from an excess of flat, elongated,
thinly laminated, soft or disintegrated pieces;
and shall be free from fragments coated with dirt.
Compacted aggregate shall be graded as follows:
3. APPLICATION
Monon Trail
SIEVE SIZE PASSING
1 -1/2"
1"
3/4"
1/2"
#30
#200
100
80 -100
70 -90
55 -80
35 -60
25 -50
12 -30
5 -10
A. Grading Do any necessary grading in addition to
that performed in accordance with Earthwork
Section, to bring subgrades, after final
compaction, to the required grades and sections
for site improvement.
B. Preparation of Subgrade Remove spongy and
otherwise unsuitable material and replace with
stable material. No traffic will be allowed on
prepared subgrade prior to paving
C. Compaction of Subgrade The first 6 inches below
the subgrade shall be compacted to at least 100%
of the maximum dry density as determined by the
provisions of AASHO T -99. Water shall be
prevented from standing on the compacted subgrade.
D. Utility Structures Check for correct elevation
of all manhole covers, valve boxes and similar
structures located within areas to be paved, and
make, or have made, any necessary adjustments in
such structures.
E. Bituminous Pavement Hot asphalt concrete
pavement shall be as specified in Section 402
and must comply with Section 401.05 of
the Indiana Department of Transportation
Specifications latest revisions. Paving will not
be permitted during unfavorable weather or when
the temperature is 40 degrees F. and falling.
F. Compacted Aggregate Subbase the thickness shown
on the drawings is the minimum thickness of the
fully compacted subbase. Compaction shall be
accomplished by rolling with a smooth wheeled
roller weighing 8 to 10 tons. Compact to 90%
compaction using Standard Testing Procedures.
Along curbs, headers and walls and at all placed
not accessible to the roller, the aggregate
material shall be tamped with mechanical tampers
or with approved hand tampers.
cen
LAKE LINER SPECIFICATION
It may be necessary to construct a liner to seal the
more permeable sandy clays and sand seams which may
be present at a shallow depth within the side slope or
bottom of the excavation. The contractor shall contact
The Schneider Corporation to determine suitability of liner
material upon excavation. In the event that construction
of a liner becomes necessary, Lake Liner specifications
have been included below.
Acceptable liners are as follows:
I. Natural Clay Liner
A. Laboratory testing shall be performed on the
designated liner material to determine the optimum liner
compaction criteria. Subsequent to determining this
compaction criteria, permeability testing shall be
performed on remolded samples, compacted to this
standard. Laboratory testing shall be performed at least
one (1) month prior to initiating lining activities.
B. The contractor shall identify and retain the
engineer approved liner material for use on sealing the
side slopes and bottom of the lake. The optimum
natural liner material shall not be used for other portions
of site work prior to verification that adequate resources
are available and have been stockpiled. It is important
that the stockpiled soils be stored in as small an area
as possible to retain natural moisture. The contractor
should anticipate that additional soil work may be
required to bring the liner material to required uniform
moisture level.
C. A representative of the testing engineer shall be
present for inspection of the base and side slopes of the
lake prior to and during compaction of the liner
materials.
D. The clay lining material, approved by the testing
engineer, shall be constructed to a minimum of 18 inches
thick on the upper two thirds of the side slopes and 24
inches on the lower one third including the base of the
lake.
E. The clay liner material shall be regularly sampled
and tested for conformance to the moisture and
Atterberg limits established for the approved liner
material(s). Field density and moisture testing shall also
be performed frequently during construction to establish a
correlation between density and field permeability capable
of providing a permeability coefficient (k) of no greater
than 10E -6 cm /sec. It is imperative that moisture
levels be maintained over optimum as determined in
laboratory testing. Only by maintaining this condition will
it be possible to approach the zero voids condition and
maximize natural liner capabilities. Off -site sources for
clay liner material may be used with approval by the
Owner's representative and on -site testing engineer.
F. Compaction of the natural liner shall be performed
by equipment operating up and down the slope.
Engineered natural clay liners shall not be compacted by
equipment operating around the slopes on or near the
same elevation.
It is important that hydration of the clay liners takes
place after installation is complete. This is typically
accomplished by natural rainfall or by application of fresh
water at the rate of one quarter gallon per square foot
for at least 72 hours. This recommended rate of
hydration will help prevent shrinkage and cracking of
the clay liner and maintain its integrity.
II. Bentonite
A. Materials and installation method to be reviewed by
the testing engineer and approved by the Engineer.
III. Synthetic Liner
A. Materials and installation method to be reviewed by
the testing engineer and approved by the Engineer.
the S ,`r vA vlxxr'f se ,er
sewer s r ,rafi Ju!l.if .t' ,;cY,3. lark' Yrr It
pil parch x pale:
:evI ?r x L.eo
of
M ;e,
CLAY TOWNSHIP REGiON:AL. WASTE i lSTRICT
PVC PIPE SOP, 35.
PVC PIPE: SLIP 2` A >Ttr; 0-24 SIX ',Nil; P k E
C nE TS JOINTS AS EI ?212
i2AS
c!r 1.Yr S-.LOP?
D;JCT'L.E IRON C".I ;I AL :"Xiirii.JPeikas
CLEAN OriTS T?'.. a imp:' At rl iFt__- w r I I%
U r'=�.T ii( y AND NO MORE THAN r EE .-APAR
i I bx r-staIi'L no ,,ter_ er than 20 rf-3e:,i fti
is
and vl_ ti the P .rri
shall not
rs,r. F'2N, 'i L.i =r F, .t1'v REC.h.'i
.t
.kink acoa.
sewer corSrn per xr A' te,: j I'r
,and or ru r;r r S, 9 or I
FL' r..aleriai 'S be oiaceci `'cnii 6 `r• rr :n"'s
pipe
a be ,'ic
The tr8: ^e:. i rl�lLtlt .:Y' a ?1i..rii!'Fn ..`f SW i ?est
tin
R
i°i "i Re �i,. ..S C# ed3:,:
i, i ILJr s -,'mil: F= Su.,iv
H
r=r r I,�;PPS oL44 s rtvU
to icl r`.onfn rtxd tr sewer
eer prior tea !nstailAtic.0
soR
Thu District shall ;nspect ALL laterals. L t
Contractors si'.xU 14 gauge- stranded wire the er
a o o 107. ,x.e :aipra:. he I>a.t,CtC d 0 rte i;
r paced on top:
length of the later
3Cen,e y[ li^.e
I <r ...'.S'