HomeMy WebLinkAbout0002.91 Applicationarm
Nop
Co nshipay Improvement Location Permit Date -2- -
�-2-fl
Roll File
This permit is valid only if construction is started within 120 days of issuance date; all construction is completed (c/o issued) within (2) two
years of issuance date unless an extension of time has been officially granted by letter by the Director, Department of Community
Development.
NAME
PHONE
BUILDER
The C.P. Morgan Company, Inc.
317-848-4040
STREET
CITY STATE ZIP
1980 Fast 116th Street Suite 125
Carmel IN 46032
TENANT NAME
(if a liable)
NAME
PHONE
OWNER n(1
2 8 1990
The C.P. Morgan Company, Inc.
317-848-4040
STREET
CITY STATE ZIP
DEC
1980 Fast 116th Street Suite 125
Carmel IN 46032
LOT
SECTION
LOCATION CE1VE�
lakelVISION Forest
ADDRESS OF CONSTRUCTION
11626 Rose Court Carmel. IN 46032
A. TYPE OF CONSTRUCTION
1. G Residential (One or Two Family)
ry �y f
2. Q Residential (Multi -family)
3. U Commercial yy��\,
v(>
C" I
SS
4.0 Industrial
5.0 Institutional
B. TYPE OF SEWAGE DISPOSAL
1. ® Public (Name of System Carmel d`a l
2.0 Private (Septic Tank, etc.)
C. TYPE OF WATER
y;
1. (3) Public System (Name of
'
2.0 Private (Well
.
D. TYPE OF I MPRO tP
1 0 New Stuc I g7A
2.0 Commercia %qf S�gth'"�
3.Q Addition$11�glli
4. U Remodel d
5.Q Foundatio n ��t
6. Demo f
7. Acces ry Building
8. Swimming Pool
9. Garage Detached Attached
E. ZONING
F. PRESENT USE OF
OF PROPERTY
OU Farm/Vacant
2.0 Residential (One or Two Family)
3. Commercial
4. Industrial
5.0 Other (Specify)
G. PR.QPOSED USE OF
PROPERTY
1. One or Two Family Dwelling
2.0 Multi -family
3.0 Commercial
4.0 Industrial
5. 0 Other (Specify)
H. ESTIMATE COST OF CONSTRUCTION
1
(Excluding Land Value)
1. Lot Split: Yes
No X
J. Flood Zones: Yes
No X
A. B. C.
K. Sump Pump: Yes X
No
L. Geothermal Heat Pump: Yes
No X
The undersigned agrees that any construction, reconstruction, enlargement, relocation or alteration of structure, or any change in the use
of land or stuctures requested by this application will comply with, and comform to, all applicable laws of the State of Indiana, and the
"Zoning Ordinance of Carmel, Indiana-1980", adopted under the authority of Acts of 1979, Public Law 178 Sec.1 et seq, General Assembly
of the State of Indiana, and all Acts amendatory thereto.
I further certify that the construction will not be used or occupied until a certificate of occupancy has been issued by the Department of
Community Development, Carmel, Indiana.
I further certify that only kitchen, bath, laundry and floor drains are
connected to sanitary sewer. Debra K. Hughes for
Lo I _/A% Q _ 'hie C.P. MX-Pn Cn1{�ry, irc.
ignat�ure of lO�nner.aAuthorized Agent
1980 Fast 116th Street. Suite 125
Address
Carmel, IN 46032 317-848-4040
r:... Cr.rn 7in phnnn
Inspections Needed:
tin /Under Slab
eter B
Ur ina Site
4zin�y_
C/ j -
Square Footage
Permit (Sq. Footage) ...................... . OU
Inspections.....................................
Certificate of Occupancy ..............
Total................................................
Plan Comm./BZA Docket # / G ev
n UTLDTNC PE32htTT TNz014MAT 2'ON
C•a Mm 3.-Cloy Town.�ship
Dapart:mant of Convnurnity Davalopmant
CARMEL ZONING ORDINANCE Z-160, SECTION 29.4.2(3): THE BUILDING COMMis-
SIONER (DZRECTCR, DE?T. OF COMMUNITY DEVELC?!"ZNT OR STAFF) SHALL APPROVE
OR DENY THE L"Lnov<4E"7T LOCATION PERMIT (BUI_'.ING PERMIT) WITHIN FIVE
(5) WORYIVG DAYS CP THE RECEIPT OF THE WRITTE:f APPLICATION FORM AND
ACCOMPANYING Ml.TSRIALS. THE IMPROVEMENT LCCATION PERMIT (BUILDING
PERMIT) SHALL SE -ISSUED WHEN THE PROPOSED S='CTURE, IMPROVEMENT OR USE
AND ITS LCCATT_CN CC.UFORM IN ALL RESPECTS TO THIS ORDINANCE.
1. A completed Improvement Location ?e:ait (Building Permit)
application.
Two (2) complete sets of construction plans. In compliance
with the State Energy Code, must list R-values on walls,
ceilings, -etc. If a commercial cors:ruction, Plans must be
ing on pans.
3. A Copy of sewer permit (from City of Carmel Engineering
Dept. or Hamilton Western Utilities, whichever applies), or
septic permit (Hamilton County Peal= Department).
4. One (1) Copy Of plot plan from subdivision development plan
5. Three (3) copies of a site plan or plot plan showing the
following REQUIRED information (cah _7e obtained from the
landowner Or developer):
--Lot drawn to scale -- all dimensions
--Scale and north arrow
--All roads, alleys, rights -of -way, etc.
--All other utilities and drainage rights -of -way and easements
--Any applicable flood plain area
--Building pad elevation and lot corner elevations
--All accessory buildings -- existing or proposed
All sidewalks and driveways
--Sewer and water lines, septic System and well location
--Drainage flow arrows
--All drainage swales and subsurface faculties (retention/
detention areas, etc.)
--Dimensional cross sections of all drainage swales
--Sump PumP (sump pump pits) showing discharge locations
--Geothermal heat pump discharge locations
DralnaCe_: All required drainage swales must be shown on
the plot plan and constructed in all subdivisions prior to the
Department of Community Development performing a final inspec-
tion of any structure per plans an file or per the following:
Constructed swales. shall be a minimum of 1'6" deep with side
slopes of not less than 4 to 1.
If this information is not submitted, it will extend the time it takes
to get an approved building permit.
I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETELY
AND ACCURATELY ON THE ATTACHED PLOT OR SITE ?LAN AS SUBMITTED WITH A
BUILDING PERMIT AP?LICATION TO THE CARMEL-Cr Y 7EPARTMEINT OF COMMUNITY
DEVELOPMENT.
I FUZZ CERTIFY THAT THE JOINING OF WATER SUPPLY PIPING S?Xr, BE MADE WITH
LEAD-FREE SOLDZU AND FL;.MS. FAILURE TO COMPLY WILL R—reL:: IN A REPLACEfZVT
OF THE SYSTEM. PLUMBINC CODE P-509-5.
NAME OF PLUMBING CONTRACTOR: _ SNhcn . TAC .
STAG PLUMBING LICENSE 4C 3 10 N 4 !
EUL' %Z1'S SIGNATURE: 317-1 q�-yoVO
ADDRESS: , o;?n All