Loading...
HomeMy WebLinkAbout0002.91 Applicationarm Nop Co nshipay Improvement Location Permit Date -2- - �-2-fl Roll File This permit is valid only if construction is started within 120 days of issuance date; all construction is completed (c/o issued) within (2) two years of issuance date unless an extension of time has been officially granted by letter by the Director, Department of Community Development. NAME PHONE BUILDER The C.P. Morgan Company, Inc. 317-848-4040 STREET CITY STATE ZIP 1980 Fast 116th Street Suite 125 Carmel IN 46032 TENANT NAME (if a liable) NAME PHONE OWNER n(1 2 8 1990 The C.P. Morgan Company, Inc. 317-848-4040 STREET CITY STATE ZIP DEC 1980 Fast 116th Street Suite 125 Carmel IN 46032 LOT SECTION LOCATION CE1VE� lakelVISION Forest ADDRESS OF CONSTRUCTION 11626 Rose Court Carmel. IN 46032 A. TYPE OF CONSTRUCTION 1. G Residential (One or Two Family) ry �y f 2. Q Residential (Multi -family) 3. U Commercial yy��\, v(> C" I SS 4.0 Industrial 5.0 Institutional B. TYPE OF SEWAGE DISPOSAL 1. ® Public (Name of System Carmel d`a l 2.0 Private (Septic Tank, etc.) C. TYPE OF WATER y; 1. (3) Public System (Name of ' 2.0 Private (Well . D. TYPE OF I MPRO tP 1 0 New Stuc I g7A 2.0 Commercia %qf S�gth'"� 3.Q Addition$11�glli 4. U Remodel d 5.Q Foundatio n ��t 6. Demo f 7. Acces ry Building 8. Swimming Pool 9. Garage Detached Attached E. ZONING F. PRESENT USE OF OF PROPERTY OU Farm/Vacant 2.0 Residential (One or Two Family) 3. Commercial 4. Industrial 5.0 Other (Specify) G. PR.QPOSED USE OF PROPERTY 1. One or Two Family Dwelling 2.0 Multi -family 3.0 Commercial 4.0 Industrial 5. 0 Other (Specify) H. ESTIMATE COST OF CONSTRUCTION 1 (Excluding Land Value) 1. Lot Split: Yes No X J. Flood Zones: Yes No X A. B. C. K. Sump Pump: Yes X No L. Geothermal Heat Pump: Yes No X The undersigned agrees that any construction, reconstruction, enlargement, relocation or alteration of structure, or any change in the use of land or stuctures requested by this application will comply with, and comform to, all applicable laws of the State of Indiana, and the "Zoning Ordinance of Carmel, Indiana-1980", adopted under the authority of Acts of 1979, Public Law 178 Sec.1 et seq, General Assembly of the State of Indiana, and all Acts amendatory thereto. I further certify that the construction will not be used or occupied until a certificate of occupancy has been issued by the Department of Community Development, Carmel, Indiana. I further certify that only kitchen, bath, laundry and floor drains are connected to sanitary sewer. Debra K. Hughes for Lo I _/A% Q _ 'hie C.P. MX-Pn Cn1{�ry, irc. ignat�ure of lO�nner.aAuthorized Agent 1980 Fast 116th Street. Suite 125 Address Carmel, IN 46032 317-848-4040 r:... Cr.rn 7in phnnn Inspections Needed: tin /Under Slab eter B Ur ina Site 4zin�y_ C/ j - Square Footage Permit (Sq. Footage) ...................... . OU Inspections..................................... Certificate of Occupancy .............. Total................................................ Plan Comm./BZA Docket # / G ev n UTLDTNC PE32htTT TNz014MAT 2'ON C•a Mm 3.-Cloy Town.�ship Dapart:mant of Convnurnity Davalopmant CARMEL ZONING ORDINANCE Z-160, SECTION 29.4.2(3): THE BUILDING COMMis- SIONER (DZRECTCR, DE?T. OF COMMUNITY DEVELC?!"ZNT OR STAFF) SHALL APPROVE OR DENY THE L"Lnov<4E"7T LOCATION PERMIT (BUI_'.ING PERMIT) WITHIN FIVE (5) WORYIVG DAYS CP THE RECEIPT OF THE WRITTE:f APPLICATION FORM AND ACCOMPANYING Ml.TSRIALS. THE IMPROVEMENT LCCATION PERMIT (BUILDING PERMIT) SHALL SE -ISSUED WHEN THE PROPOSED S='CTURE, IMPROVEMENT OR USE AND ITS LCCATT_CN CC.UFORM IN ALL RESPECTS TO THIS ORDINANCE. 1. A completed Improvement Location ?e:ait (Building Permit) application. Two (2) complete sets of construction plans. In compliance with the State Energy Code, must list R-values on walls, ceilings, -etc. If a commercial cors:ruction, Plans must be ing on pans. 3. A Copy of sewer permit (from City of Carmel Engineering Dept. or Hamilton Western Utilities, whichever applies), or septic permit (Hamilton County Peal= Department). 4. One (1) Copy Of plot plan from subdivision development plan 5. Three (3) copies of a site plan or plot plan showing the following REQUIRED information (cah _7e obtained from the landowner Or developer): --Lot drawn to scale -- all dimensions --Scale and north arrow --All roads, alleys, rights -of -way, etc. --All other utilities and drainage rights -of -way and easements --Any applicable flood plain area --Building pad elevation and lot corner elevations --All accessory buildings -- existing or proposed All sidewalks and driveways --Sewer and water lines, septic System and well location --Drainage flow arrows --All drainage swales and subsurface faculties (retention/ detention areas, etc.) --Dimensional cross sections of all drainage swales --Sump PumP (sump pump pits) showing discharge locations --Geothermal heat pump discharge locations DralnaCe_: All required drainage swales must be shown on the plot plan and constructed in all subdivisions prior to the Department of Community Development performing a final inspec- tion of any structure per plans an file or per the following: Constructed swales. shall be a minimum of 1'6" deep with side slopes of not less than 4 to 1. If this information is not submitted, it will extend the time it takes to get an approved building permit. I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETELY AND ACCURATELY ON THE ATTACHED PLOT OR SITE ?LAN AS SUBMITTED WITH A BUILDING PERMIT AP?LICATION TO THE CARMEL-Cr Y 7EPARTMEINT OF COMMUNITY DEVELOPMENT. I FUZZ CERTIFY THAT THE JOINING OF WATER SUPPLY PIPING S?Xr, BE MADE WITH LEAD-FREE SOLDZU AND FL;.MS. FAILURE TO COMPLY WILL R—reL:: IN A REPLACEfZVT OF THE SYSTEM. PLUMBINC CODE P-509-5. NAME OF PLUMBING CONTRACTOR: _ SNhcn . TAC . STAG PLUMBING LICENSE 4C 3 10 N 4 ! EUL' %Z1'S SIGNATURE: 317-1 q�-yoVO ADDRESS: , o;?n All