HomeMy WebLinkAbout04090006 Cherry Creek Estates Sec. A, Large Plan pg. 05THIS SHEET TO BE USED
FOR EROSION CONTROL ONLY.
PERSON ONSITE RESPONSIBLE FOR
NAME: TIM WALTER
COMPANY: PLATINUM PROPERTIES
PHONE: (317)- 818 --2900
NOTE:
EARTHWORK CONTRACTOR SHALL INSTALL
A MINIMUM OF A 20'x300' STONE ACCESS
DRIVE PRIOR TO CONSTRUCTION.
SF SILT FENCE
DIVERSION DITCH
Denotes permanent seeding mulch areas
Seeding rate: 130# /acre or 3# /1000 S.F.
Seeding mixture: 25% creeping red fescue
35% perennial rye
40% Kentucky bluegrass
Denotes seeding w /fiber blanket #S150 by North American Green
Seeding rate: I10# /acre or 2.5# /1000 S.F.
Seeding mixture: 38% Kentucky 31 fescue
19% perennial rye
19% annual rye
14% orchard grass
10% Kentucky bluegrass
Denotes temporary seeding mulching.
++++++++1 Seeding rate: 50# /acre
+1 Seeding mixture: 100% perennial rye.
SCALE: 1 50'
W
0
0
Q
0
W 0
U _J
W 0
W
1-
_J 0
0 0
Q Q
CK
0 0 W
o p
rn
m m m U L W\
00
�t
0
0
N)
00
0
J
m
W
U
co
e of c
li sequence
The fo Ilow m is a s t in s q
9
I
erosion oil e
activities to control s
:w OLOwJ
'O Z
te
ontract
1. The c or shall schedule a Pre—construction
t
meetm with the Hamilton Co urn Soil and Water
meeting
t rior to am construction on
ion Distric prior
Conservation
ervat
the site being started.
9
r entrance installed.
2. The construction e
r� nta
stalled per plans. for entire o
r ect i
3. Silt fencm project
cos
lin area n tructed
4 Maintenance and Refueling
9
5. Concrete washout area constructed
TOP SOfI
area shall be constructed. All
6. Posting information a
9
BORROW AR EA
manual for
items, as outlined in the in the &M ma
Post Co nstuctio n water quaIty measures shall be
placed in this area.
A and the
r 72 a
r for St .8
i let protection o n
B. Inst all n
Iv rt unde rChe rr Tree Road.
existing cu e Y
ck ile. Con
and stockpile. Construct Lake 1
6C Strip topsoil la P
not disturb
I t. D
and install ermane nt outlet.
J
on the North
any I n North of a Ime starting
m
edge t of lot 293, South to the
South line of lo
side of Klingensmith B
the West sde
303, West to
n of lot 322 and West to
the South line Sou
South to
the property I m e.
w
the site Section 6A (sides of swales,
Grade
mounds and ponds to be se eded and mulched hed
immediately upon com letion Temporary seeding
Y u P P P Y 9
n disturbed
recommended ed fo r all s wales a d
shall be eco
Y
be final
cannot b
areas that ded within a time
r ion. For
tsloeeos
period that will prevent
P e P P
r shall utilize a
r r seeding, the contrac to s
to m oa
P Y 9
;i
fast growing seed of either oats, annual ryegrass,
time of year. n on tim
wheat or rye depending
Y P g
i turbed areas should kept to a minimum a t
Disturbed
all times. All disturbed rbed areas shall be seeded if
eft dorm
dormant for more than 1 5 days
y
r pipe
or storm
install a temporary cha nnel o
6D PP
from Lake #1 to Lake #2. Install a diversion
n Cherry Tree Road. Lake #2 can
swale along y
when this is competed. Complete lete
be started whe
mass earthwork k for the site.
of wales
the site Section 6B (sides o swales,
mounds and P o nds to be seeded and mulched
immediately diatel upon com letion Temporary seeding
ed for all swales II be reco and disturbed
mmend
s that cannot final se eded within a time
area
e rind t hat w ill prevent nt slope r sion. For
P P
rar see the contractor shall utilize a
temporary seeding,
P Y 9
fast growing seed of either oats, annual ryegrass,
in on year. tim
wheat or depending rye de end 9
t to a minimum at
Disturbed areas should be k
be
LAKE 1
all times. All disturbed areas seeded if
more than 15
days left d y
dormant for
install all sanitary sewers,
r hall s
n racto shall
7. Cot Y
N.P.-
storm sewers, subsurface drains, and water mains.
s
I at a
r w bale II be installed r sha
filters Section
6A Straw
2: YEAR ELEV.=
ets
r et in
storm inlets mclud m e
g street
10 YEAR ELEV
rm inlets are to be protected immediately Sto y
P
a fter installation.
1 YEAR ELEV
0 0'. YE E
Contracto II all sanitary sewers storm r shall costa a
9. y
B.OTTO.M. ELEV.
sewers, subsurface e dr ams and water mains.
how o plans shall be installed at
Section 6B Practices s n on
Sec
all storm inlets (including street inlets).
Z
J
CL
Z
0
Z
W
a
�s
Z
0
F_
Z)
J
J
0
0
0
SHEET NO.
W
f
U
C300
JOB NO.
43405PLA —S6A
o
L! O
00
V
0
Z Q
J
i
c9
00
Lv N.
LJ
Z 0
0
00
Z
Ld
o N)
Z
J 0
(1)
Z
O
O
V)
z
0
w
z
Q
0
z
w
v7
1
W
Y
WO
UU
w
Ld
Z
U
I
:w OLOwJ
'O Z
Q 2 0 p
te
U)
l,,1, n n►►'
Z
J
CL
Z
0
Z
W
a
�s
Z
0
F_
Z)
J
J
0
0
0
SHEET NO.
W
f
U
C300
JOB NO.
43405PLA —S6A
o
L! O
00
V
0
Z Q
J
i
c9
00
Lv N.
LJ
Z 0
0
00
Z
Ld
o N)
Z
J 0
(1)
Z
O
O
V)
z
0
w
z
Q
0
z
w
v7
1
W
Y
WO
UU
w
Ld
Z
U