Loading...
HomeMy WebLinkAbout04090012 VOWC Sec. 3004 BLK E - Brenwick Realty, Construction Plans pg. 04DATE: /07/04 PROJE1 �Z4 DRAWN BY: DCC CHECKED BY: SHEET TITLE: STORMWATER POLLUTION PREVENTION PLAN DRAWING FILES: N: \1238 \035 \DWGS \C103.DWG XREF: 005bs.DWG, 033bs.DWG XREF: 3001AbsS.DWG, 3004bs.DWG XREF: 035— BS.DWG XREF: 035— ERO.DWG SHEET NO.: C ..8-4.03 r 1#4 Ss* A® EXISTING VILLAGE OF WESTCLAY SECTION 3004 B F X. ORS F PERIMETER PROTECTION: SILT FENCE -RR 0 SUBSOIL STOCKPILE PC 0 EXISTING VILLAGE OF WESTCLAY SECTION 3001 —A THE VILLAGE CENTER PART 2, BLOCK "E" F X. 0 BR Lui C 0 CURB INLET PROTECT =CURB I PAR LET PROTECTION \G 0 0 r ce 0 I 1 PROPOSED BUILDING d C9NCRETE SIDEWAL1 a d AREA TO BE TOPSOILED, SEEDED 'AND ....MULCHED BY OWNER AT COMPLETION OF CONSTRUCTION (TYP.). PERIMETER PROTECTION: SILT FENCE EXISTING CURB GUTTER 0 CURB INLET PROTECTION r im EROSION /SEDIMENT CONTROL PRACTICE PLAN FOR A TYPICAL BUILDING UNDER CONSTRUCTION BROCCOLI BILLS ASSUMED NORTH SCALE: 1"=10 000 0 INDIVIDUAL LOT EROSION CONTROL PLAN LEGEND n Ps PERMANENT SEEDING u PROPERTY LINE/ DRAINAGE SWALE SILT FENCE FINISHED DRAINAGE EXISTING DRAINAGE TREE CONSERVATION GRAVEL ENTRANCE/ EXIT PAD DROP INLET PROTECTION SOIL SALVAGE AND UTILIZATION CURB INLET PROTECTION EROSION CONTROL BY BUILDERS HOLEY MOLEY SAYS "DON'T DIG BLIND" "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1 -800- 382 -5544 CALL TOLL FREE PER INDIANA STATE LAW IC- 8- 1 -26 -1 ET SEQ. AS AMENDED AND SUPPLEMENTED, IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. A. Temporary seeded areas established by the developer will be maintained by the builder and his sub contractors. Silt fences previously installed will be maintained. B. A construction drive to the building —site from the existing drive shall be installed of Number 2 Stone, 6" thick and a minimum of 12' wide. This shall be utilized for access to the building and any mud or dirt tracked into the drive shall be promptly removed to a stable area (water shall not be used to flush silt or mud into the storm sewer). C. Prior to construction, silt fence is to be installed along the back of curb at the front of the property and along the streets or at the edge of the rear drainage easement at the rear of the property. The silt fence is to be installed prior to construction and maintained until permanent vegetation (grass) is established. D. When time is appropriate, and as soon as possible, roof down spout extenders of non perforated drain tile should be extended to the street or other solid outlet until a lawn is established. E. Establish permanent ground cover and remove silt fence. RECEIVING WATER= ELLIOT CREEK C B TACT PERSO\ WIC 3 12821 CARM =L, \D (317) 574 -3 -V _W A -LOP V \T CO VAR<ET ST., ST \A 46032 00 200 Cry w 1 N 1 1111 I i 11 f 1 \)ON B(i �isTER o O. 0000075 STATE OF ss O NAL /1 Il Il l I 1 I I 1 1111 l N1 DATE: THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. COPYRIGHTED BY THE SCHNEIDER CORP. (2004) Schneider THE SCHNEIDER CORPORATION 12821 E. New Market Street Suite 100 Carmel, IN 46032 Telephone: 317.569.8112 Fax: 317.826.6410 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS *LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering