HomeMy WebLinkAbout04090013 Mayflower Park Blk 1 Lot 7, Construction Plans for Bell-Horn pg. 06.a• .1.. -M/MM UMW i ai..1..rw .0lailmmas.- i almaM1l■ Imam POMMMOMPOIMMSM .nimma--■ alb .i am-a..il
5' REAR YARD
Existing Woods
.l• ..mp m..... r .mwrm. ma* w ..pawamaamm i awwr
REVISIONS
DATE
E'er
rah
Grass
ill
cr
411 11P
C4 Irk, it
0 fib 4111P'4.-
MUM Milalummalrama
44‘•-
mimmma
IMINVOIM
Ma AM
PROPOSED
WAREHOUSE
12,000 S. F:
itti e IR Ili El
f
e
fa erre
Ad
l
P
Oa MO
PROPOSED AIR
CONDITIONER UNIT
PROPOSED AIR
CONDI TI ONER UNIT
PROPOSED
OFFICE
3,000 S.F.
G
0
Airzer
119 ird
A Piiiii010
-411
Fer \wr. T
'1
Otti
kr
F r
1
pir
rill
5' SIDE YARD
0....ai MaalaMIMIMPD ..r..MMOr. ..M.MPrrnilr s iMOMM.I. all *M■i•.• MO r.i= 411. gaMlialhar Mg "!I'i'Y0.i
REVISIONS
Existing Concrete
Building Pad
TREE PROTECTION FENCE
SEE DETAIL C106
4E1
ao
-•mmsamm r ..iii.,..
DRAWN BY:
DESIGNED er.
CHECKED BY:
KAM
MAS
D4T September 3, 2004
Existing Concrete
awake-
1
fl' JV'/N ,ER/NG
�7
Eng/rrecrs CarAsu'lt, eryts
Ind /rnapo/!s„ !nd /Ana
Existing Pavement
5' SIDE YARD:
i iorewimo rr
Existing Concrete
Edge of Concrete
ammiamammamm N. Ma
aft Ma
1
1
1
Grass
MO almo limiammmarma am mow
Bell —Horn
MAYFLOWER PARK
CARMEL, IN
a
li
OF g limp
4 4 i :If ii
4 1.44 M
44 ria
I 1:"
r dvsf
‘t
1 f.:
1 1 111110 H I, I5 FRON
1 YA
-am.
t
t
t
t
t
i .r41N.-. i -rimer MOP r
45' U. D.E. ESMT
9
NOTE:
CHANGES IN TREE TYPES MUST BE
APPROVED BY URBAN FORESTER
(317) 571 -2417
40' INGRESS /EGRESS
EASEMENT
1
l
w
10
iQ
0
0
c!')
1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN
AND THE PLANT LIST, THE PLAN SHALL DICTATE
2. ALL SHRUB PLANTING AREAS TO BE COVERED W/
3" LAYER OF SHREDDED HARDWOOD BARK MULCH.
ALL GROUND COVER BEDS SHALL BE COVERED W/
2" SHREDDED HARDWOOD BARK MULCH. MULCH
SHALL BE APPROVED BY LANDSCAPE ARCHITECT
AND SHALL BE UNIFORM IN TEXTURE AND COLOR
AND SHALL BE OBTAINED FROM SAWMILL OR
LUMBERING OPERATION. NO UTILITY MULCH OR
PROCESSED TREE TRIMMINGS WILL BE ALLOWED.
3. AN APPROVED PRE EMERGENT HERBICIDE SHALL
BE APPLIED IN ALL PLANTING BEDS AT A RATE
SPECIFIED BY MANUFACTURER FOR EACH PLANT
VARIETY.
4. FINAL PLACEMENT OF PLANT MATERIALS, ECT.
SHALL BE APPROVED BY LANDSCAPE ARCHITECT
BEFORE PLANTING OPERATIONS ARE TO PROCEED.
ALL TREE LOCATIONS SHALL BE MARKED WITH A
WOOD STAKE INDICATING VARIETY AND SIZE OF
TREE. ALL GROUND COVER AND PLANTING BED
LINES SHALL BE MARKED W/ HIGHLY VISIBLE
PAINT LINES W/ OCCASIONAL WOOD STAKES FOR
REFERENCE. ALL STAKES SHALL BE REMOVED
FOLLOWING PLANTING OPERATIONS. LANDSCAPE
ARCHITECT RESERVES THE RIGHT TO ADJUST
PLANT LOCATIONS ON THE SITE.
6. ALL PLANTS SHALL MEET OR EXCEED AMERICAN
STANDARDS FOR NURSERY STOCK, 1986 EDITION,
AS SET FORTH BY AMERICAN ASSOCIATION OF
NURSERYMEN.
8. ALL LANDSCAPE PLANTINGS SHALL BE
GUARANTEED FOR A PERIOD OF ONE YEAR
FOLLOWING FINAL INSPECTION BY LANDSCAPE
ARCHITECT. AT THE END OF THIS PERIOD, PLANT
MATERIAL OR UNSATISFACTORY BY LANDSCAPE
ARCHITECT TERMED DEAD SHALL BE REPLACED
AT NO ADDITIONAL CHARGE BY THE LANDSCAPE
CONTRACTOR.
LANDSCAPE PLAN
PLANTING NOTES
5. NO SUBSTITUTIONS OF PLANT MATERIALS WILL
BE ALLOWED. IF PLANTS ARE NOT AVAILABLE,
THE CONTRACTOR SHALL NOTIFY LANDSCAPE
ARCHITECT PRIOR TO BID IN WRITING. ALL PLANTS
SHALL BE INSPECTED AND TAGGED WITH PROJECT
I.D. AT NURSERY OR CONTRACTORS OPERATIONS
PRIOR TO MOVING TO JOB SITE. PLANTS MAY BE
INSPECTED AND APPROVED OR REJECTED ON THE
JOB SITE BY LANDSCAPE ARCHITECT.
7. PLANTS AND ALL OTHER MATERIALS TO BE STORED
ON SITE WILL BE PLACED WHERE THEY WILL NOT
CONFLICT W/ CONSTRUCTION OPERATIONS
AND AS DIRECTED BY LANDSCAPE ARCHITECT.
9. LAWNS SHALL BE SEEDED FOLLOWING SCARIFYING,
FINAL GRADING, FERTILIZING, AND RAKING. LAWN
SHALL BE FERTILIZED W/ 12 -12 -12 ANALYSIS
FERT. AT A RATE OF 10Ibs. /1000s.f.AND LIME
APPLIED AS DICTATED BY SOILS TEST PRIOR TO
SEEDING. LAWNS TO BE SEEDED W/ MECHANICAL
SPREADER AT A RATE OF 51bs. /1000s.f. APPLY
SEED 1/2 ONE DIRECTION AND 1/2 PERPENDICULAR
TO THE FIRST. LIGHTLY RAKE, ROLL W/ 200Ibs.
ROLLER,AND APPLY HYDROMULCH (NO STRAW
MULCH) AFTER SEEDING.
SCALE:
1" 20'
Scale: I 20'
10. TIME LANDSCAPE CONTRACTOR SHALL OBTAIN
AND PAY FOR ALL PERMITS AND FEES THAT
MAY BE EQUIRED FOR HIS PORTION OF WORK.
11. PEATMOSS TO BE USED ON PROJECT SHALL BE
DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE
BROWN IN COLOR AND COMPOSED OF PARTIALLY
DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS
TO BE MILDLY ACIDIC IN CHARACTER AND SHALL
BE APPROVED BY LANDSCAPE ARCHITECT.
12. LANDSCAPE CONTRACTOR SHALL NOTIFY
LANDSCAPE ARCHITECT IN WRITING PRIOR TO BID
DATE OF ANY PLANTS HE /SHE FEELS MAY NOT
SURVIVE IN LOCATIONS NOTED ON PLANS.
13. ALL DISTURBED LAWN AREAS SHALL BE SEEDED
OR SODDED AS NOTED. PERMANENT SEEDED
LAWNS AND SODDED LAWNS SHALL BE SEED MIX
AS APPROVED BY LANDSCAPE ARCHITECT. SEED
MIX SHALL CONSIST OF:
34 POUNDS WABASH OR BARON KENTUCKY
BLUEGRASS, 20 POUNDS PARK KENTUCKY
BLUEGRASS, 10 POUNDS PENNLAWN FESCUE
AND 26 POUNDS CERTIFIED FINE BLADED
PERENNIAL RYEGR ASS.
14. ALL LAWNS SHALL BE GUARANTEED TO HAVE A
FULL UNIFORM STAND OF ACCEPTABLE GRASS AT
THE END OF THE ONE YEAR GUARANTEE PERIOD
WITH NO BARE SPOTS COMPRISING MORETHAN 2%
OE ANY LAWN AREA. ANY AREA SO NOTED WILL BE
SEEDED OR SODDED UNTIL AN ACCEPTABLE STAND
OF GRASS IS ESTABLISHED.
15. ALL LANDSCAPE PLANTINGS TO BE MAINTAINED BY
CONTRACTOR FOR 60 DAYS FOLLOWING FINAL
INSPECTION BY LANDSCAPE ARCHITECT. ALL
SEEDED LAWNS SHALL BE MAINTAINED FOR 60
DAYS AND SODDED LAWNS 30 DAYS FOLLOWING
FINAL INSPECTION BY LANDSCAPE ARCHITECT
AFTER WRITTEN REQUEST FROM THE LANDSCAPE
CONTRACTOR. MAINTENANCE TO INCLUDE WATERING
WEEDING, CULTIVATING, MULCHING, MOWING, AND
ALL OTHER NECESSARY OPERATIONS REQUIRED FOR
PROPER ESTABLISHMENT OF LAWNS AND PLANTINGS
16. C TO SUBMIT UNIT PRICES ON EVERY
TYPE OF WORK AS REQUIRED BY LANDSCAPE
ARCHITECT.
17. ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO
RECEIVE 4 -6" APPROVED TOPSOIL PRIOR TO
SEEDING OPERATIONS.
18. BACKFILL FOR TREE PLANTING SHALL BE 75%
APPROVED TOPSOIL AND 25% APPROVED PEAT
MOSS. TOP LAYER OF BACKFILL SHALL BE 100%
EXISTING TOPSOIL. A 5 -10 -5 ANALYSIS SLOW
RELEASE FERTILIZER SHALL BE INCORPORATED
INTO FILL AT APPROVED RATES.
19. ALL EXISTING TREES TO BE RELOCATED SHALL BE
DIRECT TRANSPLANTED BY A MECHANICAL TREE
SPADE IN A PROPER SIZE AS DETERMINED BY
AMERICAN ASSOC. OF NURSERYMEN STANDARDS
FOR PLANT MATERIAL. ALL TRANSPLANTING OF
TREES SHALL BE DONE DURING THE PROER SEASON
FOR EACH SPECIES. TREES SHALL BE RELOCATED
DIRECTLY TO NEW LOCATIONS OR TO HOLDING AREA
FOR LATER TRANSPLANT FOLLOWING CONSTRUCTION
FINAL LOCATION AND SIZE ARE NOTED ON PLANS.
PROJECT /.D.
CTCO4C
A
t5TE'
0.
900103
STATE OF
04 (PP AL IA,„P:o
//I1111't
BY://7",
S Nt`7y
C105
4
RECOMMENDED PLANTING SCHEDULE
KEY
NUMBER
BOTANICAL
NAME
COMMON
NAME
REMARKS
A
3
AESCULUS x CARNEA
'BRIOTII'
RUBY RED
HORSECHESTNUT
B
5
BETULA NIGRA
RIVER BIRCH
C
6
LIRIODENDROM
TULIPIFERA
TULIPTREE
0
7
CORNUS KOUSA
KOUSA DOGWOOD
E
5
SYRINGA RETICULA
'IVORY SILK'
IVORY SILK JAPANESE
LILAC TREE
F
27
COTONEASTER
APICULATUS
CRANBERRY
COTONEASTER
G
24
SP x BUMALDA
'CRISPA'
SPIRAEA CRISP LEAF
H
8
TAXUS x MEDIA
SPREADING YEW
.a• .1.. -M/MM UMW i ai..1..rw .0lailmmas.- i almaM1l■ Imam POMMMOMPOIMMSM .nimma--■ alb .i am-a..il
5' REAR YARD
Existing Woods
.l• ..mp m..... r .mwrm. ma* w ..pawamaamm i awwr
REVISIONS
DATE
E'er
rah
Grass
ill
cr
411 11P
C4 Irk, it
0 fib 4111P'4.-
MUM Milalummalrama
44‘•-
mimmma
IMINVOIM
Ma AM
PROPOSED
WAREHOUSE
12,000 S. F:
itti e IR Ili El
f
e
fa erre
Ad
l
P
Oa MO
PROPOSED AIR
CONDITIONER UNIT
PROPOSED AIR
CONDI TI ONER UNIT
PROPOSED
OFFICE
3,000 S.F.
G
0
Airzer
119 ird
A Piiiii010
-411
Fer \wr. T
'1
Otti
kr
F r
1
pir
rill
5' SIDE YARD
0....ai MaalaMIMIMPD ..r..MMOr. ..M.MPrrnilr s iMOMM.I. all *M■i•.• MO r.i= 411. gaMlialhar Mg "!I'i'Y0.i
REVISIONS
Existing Concrete
Building Pad
TREE PROTECTION FENCE
SEE DETAIL C106
4E1
ao
-•mmsamm r ..iii.,..
DRAWN BY:
DESIGNED er.
CHECKED BY:
KAM
MAS
D4T September 3, 2004
Existing Concrete
awake-
1
fl' JV'/N ,ER/NG
�7
Eng/rrecrs CarAsu'lt, eryts
Ind /rnapo/!s„ !nd /Ana
Existing Pavement
5' SIDE YARD:
i iorewimo rr
Existing Concrete
Edge of Concrete
ammiamammamm N. Ma
aft Ma
1
1
1
Grass
MO almo limiammmarma am mow
Bell —Horn
MAYFLOWER PARK
CARMEL, IN
a
li
OF g limp
4 4 i :If ii
4 1.44 M
44 ria
I 1:"
r dvsf
‘t
1 f.:
1 1 111110 H I, I5 FRON
1 YA
-am.
t
t
t
t
t
i .r41N.-. i -rimer MOP r
45' U. D.E. ESMT
9
NOTE:
CHANGES IN TREE TYPES MUST BE
APPROVED BY URBAN FORESTER
(317) 571 -2417
40' INGRESS /EGRESS
EASEMENT
1
l
w
10
iQ
0
0
c!')
1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN
AND THE PLANT LIST, THE PLAN SHALL DICTATE
2. ALL SHRUB PLANTING AREAS TO BE COVERED W/
3" LAYER OF SHREDDED HARDWOOD BARK MULCH.
ALL GROUND COVER BEDS SHALL BE COVERED W/
2" SHREDDED HARDWOOD BARK MULCH. MULCH
SHALL BE APPROVED BY LANDSCAPE ARCHITECT
AND SHALL BE UNIFORM IN TEXTURE AND COLOR
AND SHALL BE OBTAINED FROM SAWMILL OR
LUMBERING OPERATION. NO UTILITY MULCH OR
PROCESSED TREE TRIMMINGS WILL BE ALLOWED.
3. AN APPROVED PRE EMERGENT HERBICIDE SHALL
BE APPLIED IN ALL PLANTING BEDS AT A RATE
SPECIFIED BY MANUFACTURER FOR EACH PLANT
VARIETY.
4. FINAL PLACEMENT OF PLANT MATERIALS, ECT.
SHALL BE APPROVED BY LANDSCAPE ARCHITECT
BEFORE PLANTING OPERATIONS ARE TO PROCEED.
ALL TREE LOCATIONS SHALL BE MARKED WITH A
WOOD STAKE INDICATING VARIETY AND SIZE OF
TREE. ALL GROUND COVER AND PLANTING BED
LINES SHALL BE MARKED W/ HIGHLY VISIBLE
PAINT LINES W/ OCCASIONAL WOOD STAKES FOR
REFERENCE. ALL STAKES SHALL BE REMOVED
FOLLOWING PLANTING OPERATIONS. LANDSCAPE
ARCHITECT RESERVES THE RIGHT TO ADJUST
PLANT LOCATIONS ON THE SITE.
6. ALL PLANTS SHALL MEET OR EXCEED AMERICAN
STANDARDS FOR NURSERY STOCK, 1986 EDITION,
AS SET FORTH BY AMERICAN ASSOCIATION OF
NURSERYMEN.
8. ALL LANDSCAPE PLANTINGS SHALL BE
GUARANTEED FOR A PERIOD OF ONE YEAR
FOLLOWING FINAL INSPECTION BY LANDSCAPE
ARCHITECT. AT THE END OF THIS PERIOD, PLANT
MATERIAL OR UNSATISFACTORY BY LANDSCAPE
ARCHITECT TERMED DEAD SHALL BE REPLACED
AT NO ADDITIONAL CHARGE BY THE LANDSCAPE
CONTRACTOR.
LANDSCAPE PLAN
PLANTING NOTES
5. NO SUBSTITUTIONS OF PLANT MATERIALS WILL
BE ALLOWED. IF PLANTS ARE NOT AVAILABLE,
THE CONTRACTOR SHALL NOTIFY LANDSCAPE
ARCHITECT PRIOR TO BID IN WRITING. ALL PLANTS
SHALL BE INSPECTED AND TAGGED WITH PROJECT
I.D. AT NURSERY OR CONTRACTORS OPERATIONS
PRIOR TO MOVING TO JOB SITE. PLANTS MAY BE
INSPECTED AND APPROVED OR REJECTED ON THE
JOB SITE BY LANDSCAPE ARCHITECT.
7. PLANTS AND ALL OTHER MATERIALS TO BE STORED
ON SITE WILL BE PLACED WHERE THEY WILL NOT
CONFLICT W/ CONSTRUCTION OPERATIONS
AND AS DIRECTED BY LANDSCAPE ARCHITECT.
9. LAWNS SHALL BE SEEDED FOLLOWING SCARIFYING,
FINAL GRADING, FERTILIZING, AND RAKING. LAWN
SHALL BE FERTILIZED W/ 12 -12 -12 ANALYSIS
FERT. AT A RATE OF 10Ibs. /1000s.f.AND LIME
APPLIED AS DICTATED BY SOILS TEST PRIOR TO
SEEDING. LAWNS TO BE SEEDED W/ MECHANICAL
SPREADER AT A RATE OF 51bs. /1000s.f. APPLY
SEED 1/2 ONE DIRECTION AND 1/2 PERPENDICULAR
TO THE FIRST. LIGHTLY RAKE, ROLL W/ 200Ibs.
ROLLER,AND APPLY HYDROMULCH (NO STRAW
MULCH) AFTER SEEDING.
SCALE:
1" 20'
Scale: I 20'
10. TIME LANDSCAPE CONTRACTOR SHALL OBTAIN
AND PAY FOR ALL PERMITS AND FEES THAT
MAY BE EQUIRED FOR HIS PORTION OF WORK.
11. PEATMOSS TO BE USED ON PROJECT SHALL BE
DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE
BROWN IN COLOR AND COMPOSED OF PARTIALLY
DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS
TO BE MILDLY ACIDIC IN CHARACTER AND SHALL
BE APPROVED BY LANDSCAPE ARCHITECT.
12. LANDSCAPE CONTRACTOR SHALL NOTIFY
LANDSCAPE ARCHITECT IN WRITING PRIOR TO BID
DATE OF ANY PLANTS HE /SHE FEELS MAY NOT
SURVIVE IN LOCATIONS NOTED ON PLANS.
13. ALL DISTURBED LAWN AREAS SHALL BE SEEDED
OR SODDED AS NOTED. PERMANENT SEEDED
LAWNS AND SODDED LAWNS SHALL BE SEED MIX
AS APPROVED BY LANDSCAPE ARCHITECT. SEED
MIX SHALL CONSIST OF:
34 POUNDS WABASH OR BARON KENTUCKY
BLUEGRASS, 20 POUNDS PARK KENTUCKY
BLUEGRASS, 10 POUNDS PENNLAWN FESCUE
AND 26 POUNDS CERTIFIED FINE BLADED
PERENNIAL RYEGR ASS.
14. ALL LAWNS SHALL BE GUARANTEED TO HAVE A
FULL UNIFORM STAND OF ACCEPTABLE GRASS AT
THE END OF THE ONE YEAR GUARANTEE PERIOD
WITH NO BARE SPOTS COMPRISING MORETHAN 2%
OE ANY LAWN AREA. ANY AREA SO NOTED WILL BE
SEEDED OR SODDED UNTIL AN ACCEPTABLE STAND
OF GRASS IS ESTABLISHED.
15. ALL LANDSCAPE PLANTINGS TO BE MAINTAINED BY
CONTRACTOR FOR 60 DAYS FOLLOWING FINAL
INSPECTION BY LANDSCAPE ARCHITECT. ALL
SEEDED LAWNS SHALL BE MAINTAINED FOR 60
DAYS AND SODDED LAWNS 30 DAYS FOLLOWING
FINAL INSPECTION BY LANDSCAPE ARCHITECT
AFTER WRITTEN REQUEST FROM THE LANDSCAPE
CONTRACTOR. MAINTENANCE TO INCLUDE WATERING
WEEDING, CULTIVATING, MULCHING, MOWING, AND
ALL OTHER NECESSARY OPERATIONS REQUIRED FOR
PROPER ESTABLISHMENT OF LAWNS AND PLANTINGS
16. C TO SUBMIT UNIT PRICES ON EVERY
TYPE OF WORK AS REQUIRED BY LANDSCAPE
ARCHITECT.
17. ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO
RECEIVE 4 -6" APPROVED TOPSOIL PRIOR TO
SEEDING OPERATIONS.
18. BACKFILL FOR TREE PLANTING SHALL BE 75%
APPROVED TOPSOIL AND 25% APPROVED PEAT
MOSS. TOP LAYER OF BACKFILL SHALL BE 100%
EXISTING TOPSOIL. A 5 -10 -5 ANALYSIS SLOW
RELEASE FERTILIZER SHALL BE INCORPORATED
INTO FILL AT APPROVED RATES.
19. ALL EXISTING TREES TO BE RELOCATED SHALL BE
DIRECT TRANSPLANTED BY A MECHANICAL TREE
SPADE IN A PROPER SIZE AS DETERMINED BY
AMERICAN ASSOC. OF NURSERYMEN STANDARDS
FOR PLANT MATERIAL. ALL TRANSPLANTING OF
TREES SHALL BE DONE DURING THE PROER SEASON
FOR EACH SPECIES. TREES SHALL BE RELOCATED
DIRECTLY TO NEW LOCATIONS OR TO HOLDING AREA
FOR LATER TRANSPLANT FOLLOWING CONSTRUCTION
FINAL LOCATION AND SIZE ARE NOTED ON PLANS.
PROJECT /.D.
CTCO4C
A
t5TE'
0.
900103
STATE OF
04 (PP AL IA,„P:o
//I1111't
BY://7",
S Nt`7y
C105
4