Loading...
HomeMy WebLinkAbout04090013 Mayflower Park Blk 1 Lot 7, Construction Plans for Bell-Horn pg. 06.a• .1.. -M/MM UMW i ai..1..rw .0lailmmas.- i almaM1l■ Imam POMMMOMPOIMMSM .nimma--■ alb .i am-a..il 5' REAR YARD Existing Woods .l• ..mp m..... r .mwrm. ma* w ..pawamaamm i awwr REVISIONS DATE E'er rah Grass ill cr 411 11P C4 Irk, it 0 fib 4111P'4.- MUM Milalummalrama 44‘•- mimmma IMINVOIM Ma AM PROPOSED WAREHOUSE 12,000 S. F: itti e IR Ili El f e fa erre Ad l P Oa MO PROPOSED AIR CONDITIONER UNIT PROPOSED AIR CONDI TI ONER UNIT PROPOSED OFFICE 3,000 S.F. G 0 Airzer 119 ird A Piiiii010 -411 Fer \wr. T '1 Otti kr F r 1 pir rill 5' SIDE YARD 0....ai MaalaMIMIMPD ..r..MMOr. ..M.MPrrnilr s iMOMM.I. all *M■i•.• MO r.i= 411. gaMlialhar Mg "!I'i'Y0.i REVISIONS Existing Concrete Building Pad TREE PROTECTION FENCE SEE DETAIL C106 4E1 ao -•mmsamm r ..iii.,.. DRAWN BY: DESIGNED er. CHECKED BY: KAM MAS D4T September 3, 2004 Existing Concrete awake- 1 fl' JV'/N ,ER/NG �7 Eng/rrecrs CarAsu'lt, eryts Ind /rnapo/!s„ !nd /Ana Existing Pavement 5' SIDE YARD: i iorewimo rr Existing Concrete Edge of Concrete ammiamammamm N. Ma aft Ma 1 1 1 Grass MO almo limiammmarma am mow Bell —Horn MAYFLOWER PARK CARMEL, IN a li OF g limp 4 4 i :If ii 4 1.44 M 44 ria I 1:" r dvsf ‘t 1 f.: 1 1 111110 H I, I5 FRON 1 YA -am. t t t t t i .r41N.-. i -rimer MOP r 45' U. D.E. ESMT 9 NOTE: CHANGES IN TREE TYPES MUST BE APPROVED BY URBAN FORESTER (317) 571 -2417 40' INGRESS /EGRESS EASEMENT 1 l w 10 iQ 0 0 c!') 1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT LIST, THE PLAN SHALL DICTATE 2. ALL SHRUB PLANTING AREAS TO BE COVERED W/ 3" LAYER OF SHREDDED HARDWOOD BARK MULCH. ALL GROUND COVER BEDS SHALL BE COVERED W/ 2" SHREDDED HARDWOOD BARK MULCH. MULCH SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND SHALL BE UNIFORM IN TEXTURE AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR LUMBERING OPERATION. NO UTILITY MULCH OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED. 3. AN APPROVED PRE EMERGENT HERBICIDE SHALL BE APPLIED IN ALL PLANTING BEDS AT A RATE SPECIFIED BY MANUFACTURER FOR EACH PLANT VARIETY. 4. FINAL PLACEMENT OF PLANT MATERIALS, ECT. SHALL BE APPROVED BY LANDSCAPE ARCHITECT BEFORE PLANTING OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOOD STAKE INDICATING VARIETY AND SIZE OF TREE. ALL GROUND COVER AND PLANTING BED LINES SHALL BE MARKED W/ HIGHLY VISIBLE PAINT LINES W/ OCCASIONAL WOOD STAKES FOR REFERENCE. ALL STAKES SHALL BE REMOVED FOLLOWING PLANTING OPERATIONS. LANDSCAPE ARCHITECT RESERVES THE RIGHT TO ADJUST PLANT LOCATIONS ON THE SITE. 6. ALL PLANTS SHALL MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK, 1986 EDITION, AS SET FORTH BY AMERICAN ASSOCIATION OF NURSERYMEN. 8. ALL LANDSCAPE PLANTINGS SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. AT THE END OF THIS PERIOD, PLANT MATERIAL OR UNSATISFACTORY BY LANDSCAPE ARCHITECT TERMED DEAD SHALL BE REPLACED AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR. LANDSCAPE PLAN PLANTING NOTES 5. NO SUBSTITUTIONS OF PLANT MATERIALS WILL BE ALLOWED. IF PLANTS ARE NOT AVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID IN WRITING. ALL PLANTS SHALL BE INSPECTED AND TAGGED WITH PROJECT I.D. AT NURSERY OR CONTRACTORS OPERATIONS PRIOR TO MOVING TO JOB SITE. PLANTS MAY BE INSPECTED AND APPROVED OR REJECTED ON THE JOB SITE BY LANDSCAPE ARCHITECT. 7. PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE PLACED WHERE THEY WILL NOT CONFLICT W/ CONSTRUCTION OPERATIONS AND AS DIRECTED BY LANDSCAPE ARCHITECT. 9. LAWNS SHALL BE SEEDED FOLLOWING SCARIFYING, FINAL GRADING, FERTILIZING, AND RAKING. LAWN SHALL BE FERTILIZED W/ 12 -12 -12 ANALYSIS FERT. AT A RATE OF 10Ibs. /1000s.f.AND LIME APPLIED AS DICTATED BY SOILS TEST PRIOR TO SEEDING. LAWNS TO BE SEEDED W/ MECHANICAL SPREADER AT A RATE OF 51bs. /1000s.f. APPLY SEED 1/2 ONE DIRECTION AND 1/2 PERPENDICULAR TO THE FIRST. LIGHTLY RAKE, ROLL W/ 200Ibs. ROLLER,AND APPLY HYDROMULCH (NO STRAW MULCH) AFTER SEEDING. SCALE: 1" 20' Scale: I 20' 10. TIME LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE EQUIRED FOR HIS PORTION OF WORK. 11. PEATMOSS TO BE USED ON PROJECT SHALL BE DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR AND COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS TO BE MILDLY ACIDIC IN CHARACTER AND SHALL BE APPROVED BY LANDSCAPE ARCHITECT. 12. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT IN WRITING PRIOR TO BID DATE OF ANY PLANTS HE /SHE FEELS MAY NOT SURVIVE IN LOCATIONS NOTED ON PLANS. 13. ALL DISTURBED LAWN AREAS SHALL BE SEEDED OR SODDED AS NOTED. PERMANENT SEEDED LAWNS AND SODDED LAWNS SHALL BE SEED MIX AS APPROVED BY LANDSCAPE ARCHITECT. SEED MIX SHALL CONSIST OF: 34 POUNDS WABASH OR BARON KENTUCKY BLUEGRASS, 20 POUNDS PARK KENTUCKY BLUEGRASS, 10 POUNDS PENNLAWN FESCUE AND 26 POUNDS CERTIFIED FINE BLADED PERENNIAL RYEGR ASS. 14. ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT THE END OF THE ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS COMPRISING MORETHAN 2% OE ANY LAWN AREA. ANY AREA SO NOTED WILL BE SEEDED OR SODDED UNTIL AN ACCEPTABLE STAND OF GRASS IS ESTABLISHED. 15. ALL LANDSCAPE PLANTINGS TO BE MAINTAINED BY CONTRACTOR FOR 60 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. ALL SEEDED LAWNS SHALL BE MAINTAINED FOR 60 DAYS AND SODDED LAWNS 30 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT AFTER WRITTEN REQUEST FROM THE LANDSCAPE CONTRACTOR. MAINTENANCE TO INCLUDE WATERING WEEDING, CULTIVATING, MULCHING, MOWING, AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF LAWNS AND PLANTINGS 16. C TO SUBMIT UNIT PRICES ON EVERY TYPE OF WORK AS REQUIRED BY LANDSCAPE ARCHITECT. 17. ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO RECEIVE 4 -6" APPROVED TOPSOIL PRIOR TO SEEDING OPERATIONS. 18. BACKFILL FOR TREE PLANTING SHALL BE 75% APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS. TOP LAYER OF BACKFILL SHALL BE 100% EXISTING TOPSOIL. A 5 -10 -5 ANALYSIS SLOW RELEASE FERTILIZER SHALL BE INCORPORATED INTO FILL AT APPROVED RATES. 19. ALL EXISTING TREES TO BE RELOCATED SHALL BE DIRECT TRANSPLANTED BY A MECHANICAL TREE SPADE IN A PROPER SIZE AS DETERMINED BY AMERICAN ASSOC. OF NURSERYMEN STANDARDS FOR PLANT MATERIAL. ALL TRANSPLANTING OF TREES SHALL BE DONE DURING THE PROER SEASON FOR EACH SPECIES. TREES SHALL BE RELOCATED DIRECTLY TO NEW LOCATIONS OR TO HOLDING AREA FOR LATER TRANSPLANT FOLLOWING CONSTRUCTION FINAL LOCATION AND SIZE ARE NOTED ON PLANS. PROJECT /.D. CTCO4C A t5TE' 0. 900103 STATE OF 04 (PP AL IA,„P:o //I1111't BY://7", S Nt`7y C105 4 RECOMMENDED PLANTING SCHEDULE KEY NUMBER BOTANICAL NAME COMMON NAME REMARKS A 3 AESCULUS x CARNEA 'BRIOTII' RUBY RED HORSECHESTNUT B 5 BETULA NIGRA RIVER BIRCH C 6 LIRIODENDROM TULIPIFERA TULIPTREE 0 7 CORNUS KOUSA KOUSA DOGWOOD E 5 SYRINGA RETICULA 'IVORY SILK' IVORY SILK JAPANESE LILAC TREE F 27 COTONEASTER APICULATUS CRANBERRY COTONEASTER G 24 SP x BUMALDA 'CRISPA' SPIRAEA CRISP LEAF H 8 TAXUS x MEDIA SPREADING YEW .a• .1.. -M/MM UMW i ai..1..rw .0lailmmas.- i almaM1l■ Imam POMMMOMPOIMMSM .nimma--■ alb .i am-a..il 5' REAR YARD Existing Woods .l• ..mp m..... r .mwrm. ma* w ..pawamaamm i awwr REVISIONS DATE E'er rah Grass ill cr 411 11P C4 Irk, it 0 fib 4111P'4.- MUM Milalummalrama 44‘•- mimmma IMINVOIM Ma AM PROPOSED WAREHOUSE 12,000 S. F: itti e IR Ili El f e fa erre Ad l P Oa MO PROPOSED AIR CONDITIONER UNIT PROPOSED AIR CONDI TI ONER UNIT PROPOSED OFFICE 3,000 S.F. G 0 Airzer 119 ird A Piiiii010 -411 Fer \wr. T '1 Otti kr F r 1 pir rill 5' SIDE YARD 0....ai MaalaMIMIMPD ..r..MMOr. ..M.MPrrnilr s iMOMM.I. all *M■i•.• MO r.i= 411. gaMlialhar Mg "!I'i'Y0.i REVISIONS Existing Concrete Building Pad TREE PROTECTION FENCE SEE DETAIL C106 4E1 ao -•mmsamm r ..iii.,.. DRAWN BY: DESIGNED er. CHECKED BY: KAM MAS D4T September 3, 2004 Existing Concrete awake- 1 fl' JV'/N ,ER/NG �7 Eng/rrecrs CarAsu'lt, eryts Ind /rnapo/!s„ !nd /Ana Existing Pavement 5' SIDE YARD: i iorewimo rr Existing Concrete Edge of Concrete ammiamammamm N. Ma aft Ma 1 1 1 Grass MO almo limiammmarma am mow Bell —Horn MAYFLOWER PARK CARMEL, IN a li OF g limp 4 4 i :If ii 4 1.44 M 44 ria I 1:" r dvsf ‘t 1 f.: 1 1 111110 H I, I5 FRON 1 YA -am. t t t t t i .r41N.-. i -rimer MOP r 45' U. D.E. ESMT 9 NOTE: CHANGES IN TREE TYPES MUST BE APPROVED BY URBAN FORESTER (317) 571 -2417 40' INGRESS /EGRESS EASEMENT 1 l w 10 iQ 0 0 c!') 1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT LIST, THE PLAN SHALL DICTATE 2. ALL SHRUB PLANTING AREAS TO BE COVERED W/ 3" LAYER OF SHREDDED HARDWOOD BARK MULCH. ALL GROUND COVER BEDS SHALL BE COVERED W/ 2" SHREDDED HARDWOOD BARK MULCH. MULCH SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND SHALL BE UNIFORM IN TEXTURE AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR LUMBERING OPERATION. NO UTILITY MULCH OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED. 3. AN APPROVED PRE EMERGENT HERBICIDE SHALL BE APPLIED IN ALL PLANTING BEDS AT A RATE SPECIFIED BY MANUFACTURER FOR EACH PLANT VARIETY. 4. FINAL PLACEMENT OF PLANT MATERIALS, ECT. SHALL BE APPROVED BY LANDSCAPE ARCHITECT BEFORE PLANTING OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOOD STAKE INDICATING VARIETY AND SIZE OF TREE. ALL GROUND COVER AND PLANTING BED LINES SHALL BE MARKED W/ HIGHLY VISIBLE PAINT LINES W/ OCCASIONAL WOOD STAKES FOR REFERENCE. ALL STAKES SHALL BE REMOVED FOLLOWING PLANTING OPERATIONS. LANDSCAPE ARCHITECT RESERVES THE RIGHT TO ADJUST PLANT LOCATIONS ON THE SITE. 6. ALL PLANTS SHALL MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK, 1986 EDITION, AS SET FORTH BY AMERICAN ASSOCIATION OF NURSERYMEN. 8. ALL LANDSCAPE PLANTINGS SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. AT THE END OF THIS PERIOD, PLANT MATERIAL OR UNSATISFACTORY BY LANDSCAPE ARCHITECT TERMED DEAD SHALL BE REPLACED AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR. LANDSCAPE PLAN PLANTING NOTES 5. NO SUBSTITUTIONS OF PLANT MATERIALS WILL BE ALLOWED. IF PLANTS ARE NOT AVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID IN WRITING. ALL PLANTS SHALL BE INSPECTED AND TAGGED WITH PROJECT I.D. AT NURSERY OR CONTRACTORS OPERATIONS PRIOR TO MOVING TO JOB SITE. PLANTS MAY BE INSPECTED AND APPROVED OR REJECTED ON THE JOB SITE BY LANDSCAPE ARCHITECT. 7. PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE PLACED WHERE THEY WILL NOT CONFLICT W/ CONSTRUCTION OPERATIONS AND AS DIRECTED BY LANDSCAPE ARCHITECT. 9. LAWNS SHALL BE SEEDED FOLLOWING SCARIFYING, FINAL GRADING, FERTILIZING, AND RAKING. LAWN SHALL BE FERTILIZED W/ 12 -12 -12 ANALYSIS FERT. AT A RATE OF 10Ibs. /1000s.f.AND LIME APPLIED AS DICTATED BY SOILS TEST PRIOR TO SEEDING. LAWNS TO BE SEEDED W/ MECHANICAL SPREADER AT A RATE OF 51bs. /1000s.f. APPLY SEED 1/2 ONE DIRECTION AND 1/2 PERPENDICULAR TO THE FIRST. LIGHTLY RAKE, ROLL W/ 200Ibs. ROLLER,AND APPLY HYDROMULCH (NO STRAW MULCH) AFTER SEEDING. SCALE: 1" 20' Scale: I 20' 10. TIME LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE EQUIRED FOR HIS PORTION OF WORK. 11. PEATMOSS TO BE USED ON PROJECT SHALL BE DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR AND COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS TO BE MILDLY ACIDIC IN CHARACTER AND SHALL BE APPROVED BY LANDSCAPE ARCHITECT. 12. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT IN WRITING PRIOR TO BID DATE OF ANY PLANTS HE /SHE FEELS MAY NOT SURVIVE IN LOCATIONS NOTED ON PLANS. 13. ALL DISTURBED LAWN AREAS SHALL BE SEEDED OR SODDED AS NOTED. PERMANENT SEEDED LAWNS AND SODDED LAWNS SHALL BE SEED MIX AS APPROVED BY LANDSCAPE ARCHITECT. SEED MIX SHALL CONSIST OF: 34 POUNDS WABASH OR BARON KENTUCKY BLUEGRASS, 20 POUNDS PARK KENTUCKY BLUEGRASS, 10 POUNDS PENNLAWN FESCUE AND 26 POUNDS CERTIFIED FINE BLADED PERENNIAL RYEGR ASS. 14. ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT THE END OF THE ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS COMPRISING MORETHAN 2% OE ANY LAWN AREA. ANY AREA SO NOTED WILL BE SEEDED OR SODDED UNTIL AN ACCEPTABLE STAND OF GRASS IS ESTABLISHED. 15. ALL LANDSCAPE PLANTINGS TO BE MAINTAINED BY CONTRACTOR FOR 60 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. ALL SEEDED LAWNS SHALL BE MAINTAINED FOR 60 DAYS AND SODDED LAWNS 30 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT AFTER WRITTEN REQUEST FROM THE LANDSCAPE CONTRACTOR. MAINTENANCE TO INCLUDE WATERING WEEDING, CULTIVATING, MULCHING, MOWING, AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF LAWNS AND PLANTINGS 16. C TO SUBMIT UNIT PRICES ON EVERY TYPE OF WORK AS REQUIRED BY LANDSCAPE ARCHITECT. 17. ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO RECEIVE 4 -6" APPROVED TOPSOIL PRIOR TO SEEDING OPERATIONS. 18. BACKFILL FOR TREE PLANTING SHALL BE 75% APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS. TOP LAYER OF BACKFILL SHALL BE 100% EXISTING TOPSOIL. A 5 -10 -5 ANALYSIS SLOW RELEASE FERTILIZER SHALL BE INCORPORATED INTO FILL AT APPROVED RATES. 19. ALL EXISTING TREES TO BE RELOCATED SHALL BE DIRECT TRANSPLANTED BY A MECHANICAL TREE SPADE IN A PROPER SIZE AS DETERMINED BY AMERICAN ASSOC. OF NURSERYMEN STANDARDS FOR PLANT MATERIAL. ALL TRANSPLANTING OF TREES SHALL BE DONE DURING THE PROER SEASON FOR EACH SPECIES. TREES SHALL BE RELOCATED DIRECTLY TO NEW LOCATIONS OR TO HOLDING AREA FOR LATER TRANSPLANT FOLLOWING CONSTRUCTION FINAL LOCATION AND SIZE ARE NOTED ON PLANS. PROJECT /.D. CTCO4C A t5TE' 0. 900103 STATE OF 04 (PP AL IA,„P:o //I1111't BY://7", S Nt`7y C105 4