Loading...
HomeMy WebLinkAbout03110012 VOWC Sec. 10003, Construction Plans pg. 05ii .ii.i-ii_ i i.i-ii.ii. HATCH PATTERN DENOTES TEMPORARY SEEDING ti n HATCH PATTERN DENOTES PERMANENT SEEDING SHEET TITLE: EROSION CONTROL PLAN HATCH PATTERN DENOTES EROSION CONTROL BLANKET f 4 CURB INLET SEDIMENT BARRIER (TYP) BEEHIVE INLET PROTECTION #s STRAW BALES (TYP) -x--x SILTATION FENCE CONSTRUCTION LIMITS TEMPORARY SEDIMENT FILTER /BARRIER i BRENWICK DEVELOPMENT CO. CARMEL, INDIANA DRAWN BY: DCC CHECKED BY: SHEET TITLE: EROSION CONTROL PLAN DRAWING FILES: N: \1238 \1003 \DWGS \C103— C104.DWG XREF: 1003 BS.DWG XREF: 1002 BS.DWG XREF: 1004— ABS.DWG XREF: CA5.DWG, CA6.DWG, CA7.DWG, CA8.DWG XREF: 1003 ERO.DWG SHEET NO.: c DATE: 10/31/03 PROJECT NO.: 1238.1003 DRAWN BY: DCC CHECKED BY: SHEET TITLE: EROSION CONTROL PLAN DRAWING FILES: N: \1238 \1003 \DWGS \C103— C104.DWG XREF: 1003 BS.DWG XREF: 1002 BS.DWG XREF: 1004— ABS.DWG XREF: CA5.DWG, CA6.DWG, CA7.DWG, CA8.DWG XREF: 1003 ERO.DWG SHEET NO.: c BLOCK A COMMONS CHURCHILL POND NORMAL POOL =887.00 100 YEAR ELEV= 888.70 BOTTOM ELEV. 879.00 MIN. fOP OF BANK: 890.70 4m. rte:. FINCHLEY ROAD 0 w IT T 8: 8 9 Li FOR CONTINUATION SEE SHEET C103 Existing Village of WestClay Section 10004-A 7 CD w J ..11-t 1 0 A 0 10 1 A IV::: ir V 0 I 1 r 0 .v 0 y 7 -1 V\ y x 7 :7' x RYI TION CE 1� Future. Village, of WestClay SECTI'QN 10003 BRENWICK TND COMMUNITIES LC)/ 7 IL) Future Village of WOtpay s€ C-TIOa 109q? ENWICK TND COMMU!■IT ES, LLC) NOTE: ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. 1 1 1 1 1 1 HOLEY MOLEY SAYS "DON'T DIG BLIND" "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1- 800 382 -5544 CALL TOLL FREE PER INDIANA STATE LAW IS -69 -1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. 0 L o h o ASSUMED NORTH SCALE: 1 50 1 1 1 EROSION CONTROL AND SEQUENCING 1. CONTRACTOR SHALL INSTALL ALL REQUIRED SILT FENCES, SILT TRAPS, TREE PROTECTION AND INLET PROTECTION FOR EXISTING INLETS PRIOR TO THE START OF ANY EARTH MOVING OR STRIPPING. 2. CONTRACTOR SHALL INSTALL A STONE CONSTRUCTION ENTRANCE OR SOME OTHER DEVISE PRIOR TO THE START OF EARTHWORK AS NECESSARY TO PREVENT SOIL FROM BEING TRACKED OR WASHED INTO EXISTING ROADWAYS. 3. LAND ALTERATIONS WHICH STRIP THE LAND OF VEGETATION, INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION. WHENEVER FEASIBLE, NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED. AS GRADING IS DONE, INSTALL SILT TRAPS, SILT FENCES, SLOPE DRAINS, TEMPORARY DIVERSIONS AND OTHER RUNOFF CONTROL MEASURES AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT CONTAINED ON SITE. 4. ALL DISTURBED AREAS SHALL BE SEEDED AND STRAW MULCHED AS SHOWN ON THE PLANS IMMEDIATELY AFTER COMPLETION OF GROUND ACTIVITY. FOR LARGE PROJECTS, THIS SEEDING SHOULD BE COMPLETED IN PHASES AS THE DIFFERENT AREAS OF THE SITE ARE COMPLETED. 5. PERMANENT AND FINAL VEGETATION OR STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED AS SOON AS PRACTICAL UNDER THE CIRCUMSTANCES. 6. THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM DEPENDING UPON THE WEATHER. IF CONSTRUCTION ACTIVITY IS TO CEASE FOR MORE THAN TWO WEEKS, THE DISTURBED AREAS SHALL BE TEMPORARILY SEEDED. 7. ALL STORM SEWER INLET PROTECTION DEVICES SHALL BE PUT IN PLACE AT THE TIME EACH INLET IS CONSTRUCTED. 8. THE CONTRACTOR SHALL MAINTAIN EROSION CONTROL MEASURES AND DEVICES DURING CONSTRUCTION AND UNTIL SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR. 9. ONCE ONSITE EROSION AND SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR, THE CONTRACTOR SHALL REMOVE AND DISPOSE OF THE TEMPORARY EROSION CONTROL DEVICES. 10. THESE GENERAL PROCEDURES MAY NOT COVER ALL SITUATIONS. REFER TO EROSION CONTROL PLANS FOR SPECIFIC NOTES AND ADDITIONAL DETAILS 11. EROSION CONTROL TO COMPLY WITH INDIANA 327 IAC AND RULE #5, AND INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING AREAS 12. THE H.C.S.W.C.D. HAS THE AUTHORITY TO REQUEST ADDITIONAL EROSION CONTROL MEASURES OR AMEND EROSION CONTROL PLANS SUBJECT TO ACTUAL SITE CONDITIONS. TBM #44 USGS BENCHMARK CUT "X" NORTH BONNET BOLT IN FIRE HYDRANT EAST SIDE HOOVER RD. ±100' SOUTH OF CLARIDGE FARM ENTRANCE. ELEVATION 893,39 t Existing Storm Sewer New Storm Sewer Existing Sanitary Sewer New Sanitary Sewer Existing Contour WARNING THIS SHEET TO BE USED FOR EROSION CONTROL PURPOSES ONLY. FOR ANY OTHER INFORMATION SEE DEVELOPMENT PLAN. J //i No.• c zq 0000075 STATE OF ONA urrrlrnnuulnl ,E4,4,004., DATE: 11/12/03 THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. COPYRIGHTED BY THE SCHNEIDER CORP. (2003) ‘b Schneider THE SCHNEIDER CORPORATION 12821 E. New Market Street Suite 100 Carmel, IN 46032 Telephone: 317.569.8112 Fax: 317.826.6410 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS *LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering SEE SHEET CONTINUATION