Loading...
HomeMy WebLinkAbout07050001 Westmont Sec. 1, Large Plan pg. 05r•1 r-I N N N ,--I N O 0 N d .-i 0 C J a 0 C a) C6 C 0 0 a L Q) (J) 1 O O rn U Is ,—I (I) Lfl THIS SHEET TO BE USED FOR EROSION CONTROL ONLY. PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL: KENNETH R. BRASSEUR PLATINUM PROPERTIES L.L.C. PHONE: (317) 818-2900 Denotes Construction Limits SF Denotes Silt Fence A9. Specific Points Where Stormwater Discharge Will Leave this Site: An outlet pipe in Pond #1 and the Existing Pond. Temporary "Coconut Fiber Mat" or Below Grade "Drop Inlet Protection Basket" 0 Temporary 'Drop Inlet Protection Basket "Sediment Control Devices Q SNOUT hood to be installed. CONFIGURATION DETAIL 1' PVC ANTI.SIPHON PIPE ADAPTER REMOVABLE f \CCE33 PO I Iu4OUN11N0 FLAN GE 4 OUTLET PIPE (HIDDEN) FRONT VIEW SIDE VIEW SNOUT OIL WATER DEBRIS SEPARATOR 1. ALL HOODS AND TRAPS FOR CATCH BASINS AND WATER QUALITY STRUCTURES SHALL BE AS MANUFACTURED BY: BEST MANAGEMENT PRODUCTS, INC. 53 MT, ARCHER RD. LYME, CT 06371 (860) 434 -0277, (860) 4344195 FAX TOLL FREE: (800) 504 -8008 OR (888) 354 -7585 WEB SITE: www.tlastmp.com OR PRE APPROVED EQUAL 2. ALL HOODS SHALL BE CONSTRUCTED OF A GLASS REINFORCED RESIN COMPOSITE WITH ISO GEL COAT EXTERIOR FINISH WITH A MINIMUM 0.125' LAMINATE THICKNESS, 3. ALL HOODS SHALL BE EQUIPPED WITH A WATERTIGHT ACCESS PORT, A MOUNTING FLANGE, AND AN ANTI -SIPHON VENT AS DRAWN. (SEE CONFIGURATION DETAIL) 4, THE SIZE AND POSITION OF THE HOOD SHALL BE DETERMINED BY OUTLET PIPE SIZE AS PER MANUFACTURER'S RECOMMENDATION. 6. THE BOTTOM OF THE HOOD SHALL EXTEND DOWNWARD A DISTANCE EQUAL TO 112 THE OUTLET PIPE DIAMETER WITH A MINIMUM DISTANCE OF 6 FOR PIPES <12' ID. 6. THE ANTI SIPHON VENT SHALL EXTEND ABOVE HOOD BY MINIMUM OF 3' AND A MAXIMUM OF 24' ACCORDING TO STRUCTURE CONFIGURATION. 7. THE SURFACE OF THE STRUCTURE WHERE THE HOOD IS MOUNTED SHALL BE FINISHED SMOOTH AND FREE OF LOOSE MATERIAL. 8. THE HOOD SHALL BE SECURELY ATTACHED TO STRUCTURE WALL WITH 318' STAINLESS STEEL BOLTS AND OIL RESISTANT GASKET AS SUPPLIED BY MANUFACTURER. I(SEE INSTALLATION DETAIL) 9. INSTALLATION INSTRUCTIONS SHALL BE FURNISHED WITH MANUFACTURER SUPPLIED INSTALLATION KIT. INSTALLATION KIT SHALL INCLUDE: A. INSTALLATION INSTRUCTIONS B. PVC ANTI SIPHON VENT PIPE AND ADAPTER C. OIL RESISTANT CRUSHED CELL FOAM GASKET WITH PSA BACKING D. 318' STAINLESS STEEL BOLTS E. ANCHOR SHIELDS US Patent 6126817 The following is a list in sequence of construction activities to control soil erosion: Seedbed Preparation for Permanent Seeding 1. The contractor shall schedule a Pre construction 10.Additional seeding and erosion control measures meeting with the City of Carmel prior to any may be required during construction as specified 1. Test soil to determine pH and nutrient levels. construction on the site being started. Contractor by Engineer or City of Carmel. Payment for (Contact you county SWCD or Cooperative Extension office for assistance and soils information, including and /or Developer to notify IDEM and City of Carmel additional erosion control measures shall be at the available testing services.) 48 hours prior to construction beginning. contractor expense. Payment for additional 2. The construction entrance installed. rip —rap (not shown on plans) and seeding shall be 2. If soil pH is unsuitable for the species to be 3.Maintenance and Refueling area constructed paid for on a unit basis. seeded, apply lime according to test recommendations. 4. Posting information area shall be constructed. All 11. Contractor shall install all sanitary sewers, storm 3. Fertilize as recommended by the soil test. If testing items, as outlined in the in the O &M manual for sewers, subsurface drains, curbs, pavement and was not done, consider applying 400 -600 lbs. /acre of Post Constuction water quality measures shall be water mains. Disturbed areas will be stabilized 12 -12 -12 analysis, or equivalent, fertilizer. placed in this area. after the storm and sanitary are installed. 5. Perimeter Silt fencing to be installed. Disturbed areas will be stabilized after curbs, SSD 4. Till the soil to obtain a uniform seedbed, working 6. Grade the site (sides of swales, mounds and and pavement are completed unless utilities are the fertilizer and lime into the soil 2 -4 in. deep with ponds to be stabilized with erosion control starting construction within 15 days of completing a disk or rake operated across the slope. blankets and to be seeded and mulched the curbs. Stabilize disturbed areas after the immediately upon completion). If the site remains utilities are installed. inactive for a period of 15 days, stabilization is 12. Complete Landscaping and seeding all remaining required to take place in the form of temporary disturbed areas and remove all BMP's when areas are NOTE seeding, mulch or spray on palimar. For stabilized. 1 ANY ADDITIONAL EROSION CONTROL MEASURES MAY temporary seeding, the contractor shall utilize a 13. Contractor to sweep streets at least twice per BE REQUIRED IN THE FIELD BY THE INSPECTOR fast growing seed of either oats, annual week during construction season or after a storm ryegrass, wheat or rye depending on time of event. year. Disturbed areas should be kept to a 14. Perimeter protection for each lot should be 2. IF SITE REMAINS INACTIVE FOR A PERIOD OF 2 minimum at all times. installed before excavation of basement /foundation WEEKS, THEN STABILIZATION IS REQUIRED TO TAKE 7. Concrete washout area to be constructed. has begun. perimeter protection on lots shall remain PLACE IN THE FORM OF TEMPORARY SEEDING MULCH 8. Storm inlets are to be protected immediately after in place until the lot is stabilized with at least 70% SCALE: 1 80' installation with Drop Inlet Protection. cover. all trash and construction debris shall be OR SPRAY ON PALIMAR 9. Contractor shall control mud accumulation on all disposed properly into an enclosed waste receptacle. streets surrounding project by installing stone See sheet C302 for individual lot control plan. surface at all locations where construction traffic leaves the site. Dust shall be kept to a minimum by utilizing sprinkling, Calcium Chloride, Vegetative cover, spray on adhesives or other approved methods 3 ass awl a>r Q N 0 ,1111 111 111:,,, s• STOEPp ,tSTE,q'• �F o No. 19358 i\ STATE OF Q �/DIAN ONAL EN f ff //f111111 CD 0O z O 0 c Q 0 w O wO I Z ry O O Z<W U) Q 0 0 Z O O D ZwO z O owZLiW ir >O w W D w I 0 U) W r- 0 0 Ln 0 W LL H- ry W U CI :Im Co w V) O z z w Co Oz w O 0 z UJ w C) 0 Q w w a- a- 0 0 w w In (n w w w N U O V!! V J 1:►�i w 1 1..0 W C, I Lf) O Ln (N 00 V) cD (0 ck J 48 (I) W W �.1.� F_ J cry 0 U 1_ 0) V) U) U) O (I) O LU LCD N- N (C) I O7 �J co h Li CD O Ln o0 Ln I cii 00 0 N 0 t 0 Z J w o- 3F �z oLU N� o- 00 J J O a z oz O U W W LiJ N C DRAWN BY: CHECKED BY: BAH EEF SHEET NO. r.,