Loading...
HomeMy WebLinkAbout03110024 Park Place Center Phase 4 Bldg. 3 Sigma Delta Tau, Condominium Suites pg. 07PROd Ito 911-012 .AA 486 CRADLE DRIVE CARMEL, INDIANA 46032 InfoCtikeelerwebb.corn PHONE (317) 574-0140 FAX (317) 574-126g ..■••ots, i A A RE'Y SPCC, STOOK COMM, REVIEW r Op./4 MN p i4 MI 8' ARCHITECTS PLANNERS 716 ADAMS STREET, SUITE F CARMEL itt 4603Z i .1 Box 757 F.C.0 gam; el, IN: 46034 6m1 tAseicS6dibi NOTES 4 TAILS LAC] RE 0 PROd Ito 911-012 DATE 11 -11 -03 RE'Y SPCC, STOOK COMM, REVIEW r Op./4 MN p i4 MI 8' ti►+�►r p er 0 CHECKED BY SHEET 0 r PIPE SIZE a' TO 13' 18' 4 OvERt BEDDINCs BELOW T PiPE BARREL Op./4 MN p i4 MI 8' r „r .SLAY WEST REGIONAL SANITARY SEWER. SPECIFICATIONS 1. Standard specifications 'of the Cloy Waste District and I diano Deportment of Highways shall apply for oil work and materials. Pipe shall be installed in accordance with Section 715. Sanitary sewer pipe shall be PVC in accordance with ASTM 0-3034 (S.D,R. 35) and ASTM 2321. PVC pipe shall have grooved bell and gasket. The pipe shall be made of PVC plastic having a cell classification of 124548. 3. PVC sewer finings shalt conform to the requirements of ASTM D-3034-89 specification. Fittings in sizes through 8" shall be molded in one piece with elastomeric joints and frlinimurn socket depths as specified in sections 6.2 and 7.3.2 Fittings 10" and larger shall be molded or fabricated in accordance with section 7.11 with manufacturers standards pipe bells and gaskets. Wall thickness of fittings shall be SDR 26 as defined in section 7.4.1 of the specifications. Gaskets for elostomeric joints shall be molded with a minimum cross-sectional area of 0.20 square inches and cOnforrn to ASTM F -477 specification. Fittings shall be manufactured by Harco or equal. 4. All sanitary kanholes shall be "pre cast concrete" manholes in accordance with ASTM C -478 and Section 720. 0 -rings shall conform to C -443. Kent Seal or equivalent shall also be applied to all joints and between riser rings and castings. Manhole step spacing shall be no more than 16- inches, Manholes shall be air tested for leakage in accordance with ASTM C1 244 -93, Standard Test Method for Concrete Sewer Manholes by the Negative Air Pressure (Vacuum) Test. A. Installation and operation of vacuum equipment and indicating devices must be in accordance with manufacturer's recommendations and performance specifications which have been provided by the manufacturer and accepted by the Engineer. B. With the vacuum tester set in place: 1. Inflate the compression band to forty (40) psi to effect a seal between the vacuum base and the structure. 2. Connect the vacuum pump to the outlet port with the valve open. 3. Draw a vacuum of ten (10) inches of Hg. and close the valve. C. Accepted standards for leakage will be established from the elapsed time for a negative pressure change from ten (10) in. f Hg. to nine (9) in. of Hg. The maximum allowa leakage rate for a four (4) foot diameter manhole must be in accordance with the following: Manhole Depth For manholes five feet in' diameter, add in additional fiftee (15) seconds and for manholes six (6) feet i iameter add an additional thirty (30) seconds to the time requirements f four 4) foot diameter Manholes. For all manholes deeper than twenty-five (25) applicable feet, the Engineer will determine the a licable minimum elapsed time. 10 feet or leas >10 feet but <15 feet >15 feet but <25 feet see DETAIL 'n'#4 SHEET FOR SANITARY SEWER MANHOLES BEDDING, AND LATERAL CONNECTIONS SEE SHEET C6 FOR PLAN VIEW OF EXISTING AND PROPOSED SANITARY SEWER I- IORiZONTAL SCALE: t" 40 VERTICAL SCALE I' 1' HORIZONTAL SCALE t' 4 0' vERTiCAL SCALE. I' Minimum Elapsed Time for ct Pressure Change of 1 Inch of Hg. 60 seconds 75 seconds 90 seconds VERIFY EXISTNGINVERT OF S' P V.0 sTt, a ADJUST UPSTREAM PNERTS TO MAINTAIN 04X MIN. SLOPE P 0 a w 0 a) 4 25 :04 50 :09 75 :13 100 :18 125 :22 150 :28 175 :31 200 :35 225 :40 250 :44 275 :48 300 :53 350 1:02 400 1:10 450 1 :19 500 1:28 550 1 :37 600 1 :46 650 1:53 0. If manhole foil§ the test, necessary repairs frfust be 'made and the vacuum test and repairs must be repeated until the manhole passes the test. E. If manhole joint sealants are pulled out during the vacuum test, the manhole must be disassembled and the joint sealants replaced. F. Manholes will be subject to visual inspection with all visual leaks being repaired. 5. Butyl rubber coating shall be applied around each manhole joint from 6- inchet above to 6-inches below each joint. The appropriate primer shall be applied prior to applying the rubber coating. Inside joints to be filled with pre coat plug material. 6. The manhole chimney's including all riser rings shall, be sealed using Infi shield "Unibond" or approved equal. Prior to placement, the top 4- inches of the manhole cone and casting frame shalt be cleaned and primed. The Uniband shall extend from 3- inches below the top of the cone section to 2-inches over the flange of the manhole casting frame. 7. The casting elevations ore set by plan. However, the castings are to be adjusted in the field by the Engineer's representative, should o discrepancy occur between plan grade and existing grade. New manhole ring and cover shall be installed to establish grade. Maximum height of adjusting rings shall be 12- inches, 8. Bock fill around` all structures and alt cuts under paved areas with granular material. Trenches opening within 5-feet of paved roadways shall be bock filled with granular material in accordance with Section 211. Back fill under sidewalks shall be granular, unless the walks ore constructed a minimum of 6 months after back fill has been in place; 9. The Contractor Shall be responsible for verifying that all state highways, city and county permits have been obtained by the developer prior to start of construction. 10. The contractor, shalt be required to furnish the developer's Engineer with a set of prints, marked in red pencil, showing actual sewer location and invert, to include lateral location, depth and length. Such "as built" prints must be received by the Engineer before the final contract payment can be authorized. The sanitary sewer laterals and stubs termination shall be indicated on the surface with a metal fence post set immediately above the sold termination point. 11. All sanitary sewer lines upon* completion will be required to pass a low pressure air test. Said test shall be conducted accordirig to ASTM 1417 -92, and shall be witnessed by an. Engineer and a representative, of the Ciay Waste District. The testing shall be in accordance with Table 1. Add 0.5 psig for each foot of water above the sewer line being tested. 12. Deflection tests shall be performed on all flexible* pipe after the final back fill has been in place at least .30 days. No pipe shall exceed a vertical deflection of 59 deflection test results. *The following are considered non flexible pipes: concrete pipe, ductile iron pipe and cast =iron pipe). The deflection test shall be performed with a nine -point mandrel. Proving rings Shall be available. 13. All mandrel testing shall be observed by a Professional Engineer for certification and a representative of the Clay Waste District. 14. The ends of laterals are to be plugged tight with a braced plastic disc or cap capable of withstanding a low pressure air test without leakage, 15. Bedding for flexible pipes shall be No. 8 crushed stone from 6- inches below the pipe to 12- inches above the pipe, Bedding for rigid pipe shall be No. 8 crushed stone from 6- inches below the pipe to the spring tine of the pipe and from this point to 12- inches above shall be fill sand or equivalent. Manholes shalt be placed on nd less than 6- inches of No. 8 crushed stone bedding. 16. Water and sewer line crossings and separations shalt be in accordance with Ten States' Standards. 17. Trench shall' be opened sufficiently ahbad of pipe laying to reveal obstruction, and shall be property protected and /or. barricaded when left unattended. 18. too water shati 61 permitted t`d flaw into the sanitary sewer system during construction. Contractor shall utilize a pump to keep the water level below the pipe. Pump discharge shall be directed to a storm outlet. Any pipe entering existing sewers shall be plugged with screw type mechanical, braced plug until such time as all tests on the sewers have been completed and the lines have passed all punch lists, 19. All sewer .laterals installed by the mainline Contractor shall be bedded the same as the main line sewer. 20. Forty -eight (48) hours notice shall be given to the Clay Regional Waste District prior to the ,start of ,sewer Fonstruction. Also, 48 hours notice shall be given prior to any testing done in the sewer. 21. Manhole casting's shall be starriped *SANITARY SEWER" (Neenah Casting It 1642 or equal) and be self sealing type. Waterproof castings Shall be Neenah R-1916-F1 and stamped 'SANITARY SEWER 22. The Minimum slope for sewer acceptance by the Clay Township Regional Waste District are: ,Size of Pipe Minimum Constructed Slope 8 -inch 10-inch 12 inch 15 --inch 18-inch 23. The Contractor shall provide ;zneo Urements of the slope of the sewer for each manhole section as construction progresses. Such measurements shall be certified by a Registered Land Surveyor or Engineer and be available on -site for observatioft by the District's inspector. No more than three manhole sections can be constructed in advance of such measurements. 24. In the event the Contractor does not meet the minimum slopes, the sewer section and any other affected sewer sections shall be reconstructed to meet such minimum slopes. 25. See sheet C7 for plan and profile of sanitary sewer extention. TABLE 1 TIME IN MINUTES AND SECONDS REQUIRED FOR PRESSURE DROP FROM 3.5 PSIG TO 2.5 PSIG (Based on 0.003 cfm per so. ft. and 2.0 cfm) 6 :10 :20 :30 :40 :50 :59 1;09 1:19 1 :29 1 :39 1:49 1:59 2:19 2:38 2:50 8 10 :18 :28 :35 :55 :53 1:23 1:11 1:50 1:28 2:18 1 :46 2:45 2:03 3:13 2 :21 3:40 2:38 4:08 2:56 4 :35 3:14 4:43 3:31 3:47 12 :40 1:19 1:59 2 :38 3:18 3:58 4 :37 5:17 5:40 Pipe Diameter D in inches 15 1:02 2:04 3;06 4:08 5:09 6:11 7 :05 18 1:29 2:58 4:27 5:56 7:26 8:30 21 2 :01 4 :03 6:04 8 :05 9:55 0.40% 0.28% 0.22% 0.15% 0.12% 24 2;58 5 :17 7:55 10:39 11:20 27 3:20 6:41 10:01 12:45 30 4:08 8:15 12:23 14:11 33 4:59 9:59 14 :58 15:35, 36 5:56 11.53 17:00 39 6 :58 13:57 18:25 25 50 75 100 125 150 175 200 225 250 275 300 350 400 450 500 556 600 2:50 3:47 4:43 5:40 7:05 8:30 9:55 11:20 12:45 14:11 15 :35 17:00 18:25 650 s FROM-i BUtLDtNC* (TYP) *8 CRtte IEtt> STONE HAND TAMPED OR WALKED 1N TO 1/2 O.D. 6' PER SPECS NQT TO 5C,4L„ eELL. HOLES SHALL BE PROVIDED UNDER PiPE PAVIi4G MESH 6x6 1112 9xt112 ULF ,,ti 111_11F- 1---T 1 I e- 45• LONG SWEEP BEND SCALE 1/2' I A r1lNtt' rt 4' t to PIPE CLEANOU'1' SHALL eE INSTALLED WITHIN (3) FEET OF OUTSIDE BUILDiNGa. WALL A PLUCs SPECIFIED Err THE PiPE MANUFACTURER SHALL OE USED TO ENSURE 100% WATERTIGHTNESS I v8 BEND Milo; PALL`= 1•/4' PER FOOT fi ELEVATION �a Q 12' BEDDING D ,41L facypir) rovc Calb0SITE MPS emwrraRr.tAreraAu:. CLEAN-OUT TRUNK LINE LATERAL MININILPi SIZE 6', 6ERVICE WYE RUSHED STONE WITH LL HOLE EXCAVATED F"tN: Cst�'ADE IPHEHILEI BEI'DiNG MATERIAL I" C.I. LOCATOR ROD OR MAG- NETIC TAPE INSTALLED PER SECTION 102 17111411111111 PLAN VIEW O.D. BACKFILL WITH C AN GRANULAR MAT IAL PER REQUI NTS OF INDIANA cI ARTMENT OF NiGNW S (MECH CAL COMPACTION TO 95 PROCTOR DENSITY) CRUSHED STONE HAND TAMPED OR WALKED iN TO I/2' OD., PER SPECS 6' MIN. (BELOW THE BARREL) C.I. CLEANOUT W/ ADJUSTABLE HOUSING FERRULE W/ COUNTERSUNK PLUG 4 ROUND C I. VANDALPROOF COVER STRJCTURAL CONCRETE BRANCH STRUCTURAL CONCRETE ENCASEMENT' ALL AROUND LSUtLO 1NG LATERAL I MiNIMUM t SIZE• 4' i COMPACT ION OF GRANULAR i9ACKFILL IS CRITICAL UNDER UTE AND BEND IF PROPER COMPACTION CANNOT BE ACHIEVED, PLACE A MIN. OP 6' OF CLASS B CONCRETE AROUND us L3END SIVE C AT ED STEPS R EL E rN A ED E M THE RE IREM O -RING GASKET BETWEEN ALL RISER AND CONE SECTIONS, PLUS 1/2' EXTRUDABLE GASKET (KENT SEAL OR EQUAL) B 6' LEVEL, OTH SINES 3' MIN 6' OR 16 PER SECTION 5.0 S' 5 ‘7" 5CALE S w►, EE u INC RING DETAIL 3' P1 N role POLE r The anhate chimney's including all riser rings shall be seated using infi- shield "Unit nd'' or approved equal Prior to placement, the top 4- inches of the manhol cane d casting frame shall be cleaned and ()rimed. The Uniband shall extend from .a nches below the top of the cane section to 2- inches over the flange the manhole casting frame 8 PO YPROP&E'NE O 1`f RGLASS MATERIA HE C OPOLYMER POLYPROPYL.EN S DL RMED 3/8 MIN DI TER RE ING CO O RM ING TO TW REQUIREMENT OF' ASTM A-615. GRADE C: 0 CIN OR A APPROVED NON- CORR NON -C OAT D CAST IRON 3 PS ARE NOT ACCEPTABLE FRAME AND COVE (SEE NOMINAL L'2' eLITYL. R JBBBER BASE EXTRUPABLE GASKET MATERIAL (TYP CAST C RING 4' MIN. (SEE D RETIS ADJUSTER 2' MAX AIL) CCENTRIC CONE SECTION NOTE MANHOLE CO•PORM5 TO ASTM C -4'1S JOINT CONFORMS TO ASTM C -443 3 [MUM ER "FOOT SLOPE Si' CONCRETE S a.0 -eW. ASE SET TONE AS SPECIFIED T 3) PLACE I DIAM ER EXTR DABLE PREFO ED GASKET MATERIAL IN EACH TWAT (SEE T T,Af1) fy, X THESE QETAILS DO NOT APPLY TO PHASE 4 NOTE: BUTYL RUBBER COATIN SHALL? BE APPLIED AROUND EACH 'MANHOLE JOINT FROM 6" ABOVE TO 6" BELOW EACH JOINT. THE APPROPRIATE PRIMER, SHALL BE APPLIED PRIOR TO APPLYING THE RUBBER COATING, INSIDE JOINTS TO BE FILLED WITH PRECOAT PLUG MATERIAL. `s 4 z C