HomeMy WebLinkAbout08110007-8 Kite PUD Rezone, Expansion, Key Bank, Site Plan0
KEY
SITE PLAN DESCRIPTION
LINE TYPE/
SYMBOL
DETAIL
REFERENCE
S1A
8" HIGH CHAIRBACK CURB AND GUTTER
CU -1A
S1
6" HIGH CHAIRBACK CURB AND GUTTER
CU -1
S2
STRAIGHT CURB
CU -8
S3
CURB END TRANSITION
CU -6
S4
COMBINED WALK AND CURB
PA-4
S5
CONCRETE SIDEWALK
J PA -3
AC-6
S6
CURB RAMP
S7
CONCRETE COLLAR FOR CASTING WITHIN ASPHALT
PA -10
S8
STANDARD DUTY ASPHALT PAVEMENT SECTION
NO PATTERN
PA 1 S
S9
HEAVY DUTY ASPHALT PAVEMENT SECTION
PA -1H
S10
PAVEMENT SECTION WITHIN THE RIGHT -OF -WAY
PA -1R
311
CONCRETE PAVEMENT SECTION
PA -2
S12
PAVEMENT STRIPING
PA -7
S13
ACCESSIBLE PARKING SPACE WITH SIGN
AC- 1 +AC -2
S14
CURB RAMP
AC-4A AC -5C
S15
DUMPSTER ENCLOSURE WITH CONCRETE LANDING PAD
DU -1
S16
LANDSCAPE AREA SEE LANDSCAPE PLAN
S47
CONCRETE JOINTS C CONTROL E EXPANSION K KEYWAY
PA -2B
S18
KEY BANK SIGN 1
S19
10' CONCRETE WALL
S20
BICYCLE PARKING
BL -1
S21
10' ASPHALT PATH
PARKING SPACE COUNT 10