Loading...
HomeMy WebLinkAbout5 Erosion Control pg 5 of 7SPECIES SEEDING RATE SUITABLE SITE SUITABIUTY LBS /ACRE L3S /1000 SET. pH DROUGHTY DRAME'D WET LEVEL AND SLOPING, OPEN AREAS 1.0 LBS COVER SEED 1/4 DEEP DRY GEN. SOIL SPRAY TALL FESCUE TALL FESCUE RED CLOVER KENTUCKY BLUGRASS CREEPING RED FESCUE 35 25 5 15 15 8 6 12 4 4 5.5 8.3 5.5 8.3 5.5 7.5 2 2 1 1 1 2 STEEP BANKS AND CUTS 1 20-25 12 -18 7 -21 TALL FESCUE KENTUCKY BLUGRASS TALL FESCUE EMERALD CROWNVETCH 15 25 35 10 4 6 8 25 5.8 7.5 5.5 8.3 2 2 1 1 2 LAWNS AND HIGH MAINTENANCE AREAS MED. 1 25-35 12 -18 10-20 KENTUCKY BLUGRASS CREEPING RED FESCUE PERENNIAL RYEGRASS (TURF TWO TALL FESCUE 40 40 170 170 9 9 24 4 5.8 7.5 5.0 7.5 5.5 8.3 2 2 1 1 1 2 KIND OF SEED PER 1,000 SQ. FT. N M C} REMARKS WF€AT OR RYE 3.5 LBS. OVER SEED 1' TO 1 1/2' DEEP SPRIG OATS 2.3 LBS. COVER SEED 1' DEEP ANNUAL RYEGRASS 1.0 LBS COVER SEED 1/4 DEEP SOIL CONDITION 3ONV2D101 I 30VHS I CLOSE MOYAN,. TO 2 -3 1 /2 INCHES 33NV213101 O IdVfY L S033N A1 num SS3■1021VH 2131N FLOODING TOLERANCE (DAYS) MATURE HEIGHT (INCHES) (SAva) 31111 3ON392131Y3 SALT TOLERANCE WET NORM DRY GEN. SOIL SPRAY CREEPING RED FESCUE FESIUCA RUBRA 2 1 2 1 1 1 MED. 1 20-25 12 -18 7 -21 S KENTUCKY BLUEGRASS POA PROTINSIS 2 1 2 1 1 1 MED. 1 25-35 12 -18 10-20 MT TALL FESCUE FESTUCA L ARUNDNJACEA 2 1 1 1 1 1 LOW 1 24-35 24-36 5-14 T PERENNIAL RYEGRASS LOLIUM PERENNE 2 1 2 1 2 HIGH 2 15-20 12 -18 5-10 MT CROWNVETCH CORANILLA VARIA 1 1 2 LOW 1 5-10 24 14-21 T RED CLOVER 1RIFOLIUM PRATENSE 1 2 MED. 1 7 -10 18 5-10 S S 0 z W I- 3 2 H 0 Z z 0 M U) W r V) 0 CT xQ� ct /Ua) IOawO I- W Z d z) W O Z Z W W CJ W W 0U)wJO x D0LL: It* II gilt 1 iiiiiiIiiiiii!!! 1ii1 t11 1111 11. •Mai... I 0111 1 1 11 1111111111 1 ���N 1 11 ■■■■■1 HIE 1 j PARK NQRTI- STERN` WATERSHED COMMERCIAL ''PARK NORTHWESTERN REGULATED DRAIN 106 TH ST 3" TREE (TYP.) CHARTER ONE BANK 2,385 S.F. F.F. ELEV. 890.80 i t V/ NSTRU :TEMPORARY CO STRI T1ON DRI 1 P \EV 'ANARKING AREA E (SE V ETAI1.),: 891 Y VICINITY MAP SCALE: 1" 500' •4 4 4 V 4 V 11111®1 1111 1111 111111111111111111111111 1 11111111111 111 111 111111111111/1 11111111111111111 -A I s V z Z V ,v z r �y 0 I ;i A V ‘407 44: 4*. -4. c z ,11 a 7 i /f f i z e s.s?•‘ 4 6" PERFORATED v SUBSURFACE DRAIN (SSD) PIPE WITH MINIMUM 0.5% GRADIENT. SEE GRADING PLAN FOR /1 INVERT ELEVATIONS 1,s UNDERCUT DITCH BY 0.2' TO PROPOSED GRADE 1 ALLOW FOR FUTURE SILTING t) \1 PR S EROSION CONTROL BLANKET NORTH AMERICAN GREEN (S -75 OR EQUAL) LOCATED AS SHOWN ON EROSION CONTROL PLAN DRAINAGE DITCH DETAIL SLOPES 1% AND GREATER PROPOSED GRADE #8 GRAVEL VA R e DRAINAGE DITCH DETAIL SLOPES LESS THAN 1% NTS V NTS VARIES 1' -3' a 1. N 2' MIN. DEPTH K) UNDERCUT DITCH BY 0.2' TO ALLOW FOR FUTURE SILTING 7 y /i EROSION CONTROL BLANKET NORTH AMERICAN GREEN (5 -75 OR EQUAL) LOCATED AS SHOWN ON EROSION CONTROL PLAN K) P \V G� 0• 1111111111 1111111111u11111111 30 0 860 860 LEGEND BURIED GEOTEXTILE FABRIC COMPACTED FILL TRENCH DETAIL 0 ERO:'!ON CONTROL BLANKET (NORTH AMERICAN GREEN S -75 OR EQUAL) AND MULCHED SEEDING SODDING (SEE LANDSCAPE PLAN FOR MORE DETAILED PLANTING LOCATIONS) MULCHED SEEDING EXISTING CONTOURS PROPOSED CONTOURS SILT !=ENCE SLOPE CHECK CONST LIMITS SANDBAG INLET PROTECTION ROCK CHECK DAM SWALE INLET PROTECTION SCALE: 1"=30' EXISTING CONTOUR INTERVAL 1' PROPOSED CONTOUR INTERVAL 1' ■11 ■■11. 1111111=111=1111111111111•1111=111M ■■1111■■■ iiiiiiiiiiiiiiiii 111111••••••••••••••• ■11 ■11■ ■11••••11■ 111•1111•11111111111•11111•11111111111111 111•1111•11111111111•11111•11111111111111 01111110•11111•11111•11•1101111 01111110•11111•101111110•11111•11111•11•1101111 .1111 111•11111•111111•111111•1111••••• 111•11111•111111•111111•1111••••• 5-5 -411111si. BURIED GEOTEXTILE FABRIC 30 60 SECTION A -A SWALE AND YARD INLET PROTECTION DETAIL FRAME DETAIL NTS FLOW INLET THE FRAME SHALL BE WRAPPED WITH ONE CONTINUOUS PIECE OF GEOTEXTILE FABRIC AND A 2' OVERLAP SHALL BE PROVIDED. 111�11�1 NO. 5 COURSE AGGREGATE GROUND UNE 300 275 250 225 200 175 150 125 100 75 50 25 FT. FALTER FABRIC vartiDs INTO TRENCH 4:1 3:1 2:1 1:1 SLOPE GRADIENT 1.5' 1.5' 0.5' TO 1' ROCK CHECK DAM NTS SLOPE CHECK SOIL NG 6' X 6" 7RE),ICH WOOD, METAL OR SYNTHETIC FRAME LOW FLOW CHANNEL JOINING FENCES IIHDI JOINING 7YY17 W MORE SILT FENCES TIE THE 71Y0 END POSTS TOGETHER N77H EXISTING NYLON CORDS SILT FENCE DETAIL NTS SILT FENCE OVERLAP SAND BAGS BEHIND INLET (TYP.) ONTO CURB SANDBAG INLET PROTECTION NO SCALE r 3.0% 20' (MIN.) 3.0% 3' MAX. MED/HIGH FLOW CHANNEL AN SHORELINE 1 STAPLE 1.5 STAPLES 2 STAPLES 3.5 STAPLE PER SYD PER SYD PER SYD PER SYD EROSION CONTROL BLANKET STAPLE PATTERN DETAIL SPILLWAY CREST ROCK ABUTMENT 3 •r :._o es`ra.a s ..r:;•,- S I. 410g r �I I II Il I. :1 -11 1 11 11- 11 ��y"1d D 50 7" DITCH OR BASIN 15" i RIP -RAP BOTTOM Immingre 00000 )0000 00000000 00000000000000 6" No. 2 STONE SECTION A-A TEMPORARY CONSTRUCTION DRIVE DETAIL NTS PROVIDE CROSS BRACING WHEN ECESSARY ROCK APRON FLOW RANKING 1 GOOD 2 MEDIUM NOT TOLERANT %MEAT OR RYE SPRNG OATS ANNUAL RYEGRASS NON-IRRIGATED IRRIGATED NOT IECESSARY *ERE MULCH IS *PLED. 1-PREFERRED 2-WIU. TOLERATE INNOCULATE WITH SPECIFIC INNOCULANTS SEEDBED PREPARATION APPLY LIME TO RAISE THE pH TO THE LEVEL NEEDED FOR SPECIES BEING SEEDED. APPLY 23 U3S. OF 12-12-12 ANALYSIS FERTIUZER (OR EQUIVALENT) PER 1,000 SQ. FT. (APPROXIMATELY 1,000 LBS. PER ACRE) OR FERTILIZE ACCORDING TO TEST. APPUCATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC MATTER AND FERTILITY WILL GREATLY ENHANCE VEGETATIVE GROWTH. WORK THE FERTILIZER AND LIVE INTO THE SOIL A DEPTH OF 2 TO 3 INCHES YATH A HARROW, DISK, OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE. FER1lUZER AND UME SHALL MEET REQUIREMENTS OF INDOT STANDARD SPECIFICATIONS 1995. SEMING SELECT A SEED MIXTURE BASED ON PROICTED USE OF THE AREA WHILE CONSIDERING BEST SEEDING DATES. DOCKET 093-03 DP/ADLS SOIL MAP AND DESCRIPTION N TS BROOKSTON SILTY CLAY LOAM (Br) THIS NEARLY LEVEL SOIL IS IN DEPRESSIONS, ON FLATS, AND IN NARROW DRAINAGEWAYS BETWEEN BETTER DRAINED SOILS ON BROAD, UNDULATING PLAINS. RUNOFF IS VERY SLOW. CROSBY SILT LOAM, 0% TO 2% SLOPES, (CrA) THIS NEARLY LEVEL SOIL IS ON BROAD PLAINS, ON RIDGETOPS IN ROLLING AREAS, OR IN LOW DRAINAGEWAYS. RUNOFF IS SLOW. 3 2 NO PERMANENT TEMPORARY SEEDING DATES so OCT NOV DEC IN IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL EROSION AT ILES OMR THAN IN THE SHADED AREAS, USE MULCH. LATE SUMER SEEM DATES MAY BE WENDED 5 DAYS F MULCH IS APPLED. INCREASE SEEDING APPUCATION BY 50,1 TEMPORARY SALT TOLERANCE (TO BOTH SOIL SALTS AND SPRAY) MT MEDIUM TOLERANCE S SLIGHT TOLERANCE 1/5/03 12/4/03 DATE MONITORING AND MAINTENANCE GUIDELINES GRAVEL CONSTRUCTION DRIVE AND PARKING AREA: A. INSPECT WEEKLY AND AFTER EACH STORM EVENT. TOPSOIL: A. INSPECT WEEKLY UNTIL VEGETATION IS ESTABLISHED. TEMPORARY AND PERMANENT SEEDING: A. INSPECT PERIODICALLY, ESPECIALLY AFTER STORM EVENTS, UNTIL THE STAND IS SUCCESSFULLY ESTABLISHED. B. PLAN TO ADD FERTILIZER THE FOLLOWING GROWING SEASON ACCORDING TO SOIL TEST RECOMMENDATIONS. C. REPAIR DAMAGED, BARE, OR SPARSE AREAS BY FILLING ANY GULLIES, RE-FERTILIZING, OVER- OR RE-SEEDING, AND MULCHING. D. IF PLANT COVER IS SPARSE OR PATCHY, REVIEW THE PLANT MATERIALS CHOSEN, SOIL FERTILITY, MOISTURE CONDITION, AND MULCHING; REPAIR THE AFFECTED AREA EITHER BY OVER-SEEDING OR BY RE-SEEDING AND MULCHING AFTER RE-PREPARING THE SEED BED. E. IF VEGETATION FAILS TO GROW, CONSIDER SOIL TESTING TO DETERMINE ACIDITY OR NUTRIENT DEFICIENCY PROBLEMS. F. IF ADDITIONAL FERTILIZATION IS NEEDED TO GET A SATISFACTORY STAND, DO SO ACCORDING TO SOIL TEST RECOMMENDATIONS. G. REFERENCE INDOT SPECIFICATION 621.05. MULCHING: A. INSPECT AFTER STORM EVENTS TO CHECK FOR MOVEMENT OF MULCH OR FOR EROSION. B. IF WASHOUT, BREAKAGE, OR EROSION IS PRESENT, REPAIR THE SURFACE, THEN RE-SEED, RE-MULCH, AND IF APPLICABLE, INSTALL NEW NETTING. C. CONTINUE INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED. D. REFERENCE INDOT SPECIFICATION 621.05. REVETMENT RIPRAP: A. INSPECT PERIODICALLY FOR DISPLACED ROCK MATERIAL, SLUMPING, AND EROSION AT EDGES, ESPECIALLY DOWNSTREAM OR DOWNSLOPE. SILT FENCE: A. B. C. D. E. INSPECT TI-IE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION MMEDIATELY. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING ThE FABRIC TO BULGE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, EMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE ISTURBED AREA TO GRADE AND STABILIZE. SANDBAG INLET PROTECTION: A. INSPECT THE SANDBAG INLET PROTECTION PERIODICALLY AND AFTER EACH STORM EVENT. B. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE SANDBAGS AT THE LOWEST POINT. C. REMOVE THE SANDBAG INLET PROTECTION AND SEDIMENT DEPOSITS PRIOR TO THE COMMENCEMENT OF PAVING OPERATIONS. CONSTRUCTION SEQUENCE SCHEDULE OF EROSION CONTROL IMPLEMENTATION 1. SILT FENCE AND/OR STRAW BALES SHALL BE PLACED AROUND EXISTING STRUCTURES AND IN DITCHES AS SHOWN IN THESE PLANS BEFORE ANY LAND DISTURBING ACTIVITIES ARE STARTED. 2. CONSTRUCT TEMPORARY GRAVEL ENTRANCE AND PARKING AREA IN ACCORDANCE WITH THE "INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING AREAS." 3. STRIP TOPSOIL AND REMOVE FROM SITE. 4. ROUGH GRADE SITE. DISTURBED AREAS SHOULD BE SEEDED IMMEDIATELY FOLLOWING ROUGH GRADING. AREAS THAT WILL NOT BE DISTURBED AGAIN SHOULD BE PERMANENTLY SEEDED. NO UNVEGETATED AREAS SHOULD BE EXPOSED FOR MORE THAN SEVEN DAYS. 6. CONSTRUCT BUILDING STRUCTURES, INSTALL CURB, STORM STRUCTURES AND FINAL GRADE SITE. INSTALL STORM SEWER AND DRAINAGE SWALE RELATED EROSION CONTROL MEASURES AS SOON AS INSTALLATION AND FINAL GRADING IS COMPLETE. ALL EROSION CONTROL BLANKETS SHALL BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AS SOON AS FINAL GRADING IS COMPLETE. 7. FINAL PAVING OPERATIONS. TEMPORARY EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL VEGETATION IS SECURE. PROJECT DESCRIPTION AND GENERAL NOTES: 1. THIS PROJECT INVOLVES THE CONSTRUCTION OF A COMMERCIAL BUILDING HOUSING A BANK AND RETAIL SPACE. CURBS, WALKS, AND PARKING NECESSARY FOR THE DEVELOPMENT SHALL BE CONSTRUCTED AS WELL. SURFACE DRAINAGE AND A STORM DRAIN SYSTEM SHALL BE UTILIZED FOR STORM WATER COLLECTION. DRAINAGE WILL BE DETAINED IN AND UNDERGROUND DETENTION SYSTEM AND DISCHARGED INTO AN ADJACENT REGULATED DRAIN. WATER, SANITARY SEWER, GAS, AND ELECTRIC UTILITIES SHALL ALSO SERVICE THE PROPERTY. 2. NO WETLANDS ARE LOCATED WITHIN MESE PROJECT LIMITS. 3. THERE ARE NO FLOOD PLAINS, FLOODWAY FRINGES, OR FLOODWAYS WITHIN THE PROJECT LIMITS PER FIRM MAP #1800810011C, MAY 19, 1981. 4. THE RECEIVING WATER FOR THE SEDIMENT FOREBAY AND EXISTING DETENTION POND IS CEMETERY CREEK. 5. THERE ARE NO POTENTIAL AREAS WHERE STORM WATER MAY ENTER THE GROUNDWATER. 6. THE EXISTING SITE IS PRESENTLY COVERED IN GRASS WITH TREES AS NOTED ON THE PLAN. 7. THERE WILL BE NO STOCKPILING OF TOPSOIL OR BORROW AREAS. MISCELLANEOUS REVISIONS PER TECHNICAL ADVISORY COMMITTEE REVIEW RH ADDED MONUMENT SIGN ON NORTH CORNER OF PROPERTY RH REVISIONS BY EROSION CONTROL PLAN JOB No. DATE NOVEMBER 21, 2003 10460 MICHIGAN ROAD DRAWN RH DESIGNED TEN CHECKED TEN APPROVED TEN TEN TEN APPR Transportation Sc Development Consultants 3417 S. SIOPW4 IR BEECH RIVE IN 4617 (317) 780 SHEET 5 OF SLOPE