HomeMy WebLinkAboutLS3.0 Landscape RevisionsO
_1
PLANTING PROCEDURE
I. EXCAVATE ROOTBALL PIT.
2. ADD EXCAVATED SOIL 4 TAMP.
SET TREE SUCH THAT ROOT FLARE
IS 2 -3" HIGHER THAN FINISHED GRADE.
3. BAGKFILL W/ SOIL MIX 4 "WATER IN
4. COMPLETE BAGKF ILLI NG, CONSTRUCT TRENCH
EDGE 4 ADD SPECIFIED MULCH.
5. STAKE 4 GUY SECURELY.
SCALE :3 /4 =1' -'0"
FILE NAMEtLAPLOOI
RUBBER HOSE
(AS SPECIFIED)
GUY WIRE
(AS SPECIFIED)
MULCH LAYER
(AS SPECIFIED)
O
SCALE: I /2"= I '-0"
FIL1= NAl LAPWO
FILE
tY
ROW
SPACING
GENERAL NOTES:
I. SEE SPECIFICATIONS FOR DRAINAGE TEST REQUIREMENTS PRIOR TO PLANTING. SEC. 02Q00.
2. DO NOT ALLOW AIR POCKETS TO FORM WHEN BAGKF I LL I NG
3. IMMEDIATELY SOAK WITH WATER.
4. DO NOT BREAK ROOTBALL.
TYPICAL TREE ROOTBALL PIT
11 1 1 1#
.iii .ii
.11�. .,s,. .sti._
EVRREN_TRE STAKING AND GUYING
IN CULTIVATD AND MULCHED PLANTING AREA
11 ��av��a 1
=1111 flli IIII lllf llll flll 1111 1111 1111 1111 Illi
=IIII= IIII =1111 =1111 =IIII =f IIN= 1111- IIII IIII
Ill UNI1111
HEDGE PLANTING (DOUBLE sov)
REMOVE BURLAP
ON TOP 1/2 OF
ROOTBALL
FINISHED GRADE
MULCH LAYER
(A5 SPECIFIED)
TRENCH EDGE (TYP)
PLANTING SOIL MIX
(A5 SPEC I F IED)
ADD EXCAVATED SOIL AS
NEEDED TO BRING TREE
TO FINISHED GRADE. TAMP
LIGHTLY BUT THOROUGHLY
PRIOR TO SETTING TREE TO
PREVENT SETTLING.
SCARIFY BASE OF PLANT PIT
WHEN EXCAVATING PIT. BREAK
THROUGH 4 LOOSEN ALL
"HARDPAN" (REMOVE AS
NECESSARY TO FACILITATE
DRAINAGE)
GUY WIRE
RUBBER HOSE
ROOT BALL
MULCH AREA
(AS SPECIFIED)
TOP OF
ROOTBALL PIT
TREE
PLAN
SGALE:1 /4 "•1' -0"
NOTE:
SET TREE PLUMS
PRIOR TO STAKING
CULTIVATED PLANTING
SOIL
STAKE (AS SPECIFIED)
DRIVE BELOW GRADE
ROOTBALL
0.0
SPACING
PLAN
ROOTBALL
I" OF GROWN FOR EVERY FOOT OF BED
WIDTH. TOPS OF ROOTBALLS TO BE SET
A MINIMUM OF 2" ABOVE FINISHED GRADE.
MULCH (A5 SPECIFIED)
CULTIVATE A 4" MINIMUM LAYER OF
SPECIFIED PLANTING SOIL MIX INTO BED.
FINISHED GRADE
UNDISTURBED SUBGRADE
TRENCH EDGE (TYP)
CULTIVATE SOIL WITH ROTO TILLER TO A
MINIMUM DEPTH OF 12" BREAK THROUGH
ANY EXISTING "HARDPAN" AND REMOVE
TO PROVIDE GOOD PERCOLATION 4
POSITIVE DRAINAGE.
RUBBER HOSE
(As SPECIFIED)
GUY WIRE
(AS SPECIFIED)
MULCH LAYER
(AS SPECIFIED)
O
141
1;1 FI =1
1 3 .7
w is M
i 1_ 11 1 =V l= 1=
H11
TREE STAKING AND GUYING
B S IN CULTIVATED AND MULCHE PLANTING AREA
i_ t-o"
O
RUBBER HOSE
(AS SPECIFIED)
GUY WIRE
(AS SPECIFIED)
MULCH RING
STAKE (AS SPECIFIED)
DRIVE BELOW GRADE
ROOTBALL
EXCAVATED SOIL
MULTI -TRUNK TREE STAKING AND GUYING
SCALE: I /2" =1'-O"
FILE NAME:LAPLOII
SLOPE
SCALE :3 /4" II-O"
FILE NAME :L.02 -16
tt
PLANTING PROCEDURE
I. LAY OUT BED AND OUTLINE WITH TRENCH EDGE. PLACE SOIL FROM
EDGE WITHIN BED.
2. ROTOTILL BED TO 12" DEPTH. SPREAD 4" MIN. LAYER OF PLANTING
SOIL MIX OVER BED. ROTOTILL SOIL MIX INTO TOP OF BED.
3. INSTALL PLANTS 4 MULCH. WATER THOROUGHLY.
SHRUB PLANTING
GUY WIRE
TOP OF
ROOTBALL PIT
TREE -4/
s
MULCH RING (BOTTOM
OF ROOTBALL PIT)
RUBBER HOSE
ROOT BALL
GUY WIRE
TOP OF
ROOTBALL PIT
MULTI -TRUNK TREE-
MULCH RING (BOTTOM
OF ROOTBALL PIT)
RUBBER HOSE
ROOT BALL
'i YY •;<I
I
PLAN
SGALEs V4'• 1'-O"
NOTE:
SET TREE PLUMB
PRIOR TO STAKING
CULTIVATED PLANTING
SOIL
STAKE (AS SPECIFIED)
DRIVE BELOW GRADE
ROOTBALL
PLAN
SCALE. V4 "•1' -0"
NOTE:
1. ATTACH GUYS TO THE
CENTRAL LARGEST TRUNK.
2. SPACE STAKES EVENLY
AROUND (4 OUTSIDE)
ROOTBALL PIT SUCH THAT
WIRES DO NOT COME IN
CONTACT WITH OTHER TRUNKS.
3. SET TREE PLUMB
PRIOR TO STAKING
SHRUB (AS SPECIFIED)
LEAVE NO ROOTS EXPOSED
MULCH LAYER (AS SPECIFIED)
PLANTING SOIL MIX (AS SPECIFIED)
FINISHED GRADE
TRENCH EDGE (TYP)
UNDISTURBED SUB6RADE
CULTIVATE SOIL IN LANDSCAPE
AREA TO MINIMUM DEPTH OF 12"
BREAK THROUGH ANY EXISTING
"HARDPAN" AND REMOVE AS
NECESSARYTO PROVIDE GOOD
PERCOLATION 4 POSITIVE
DRAINAGE.
RUBBER HOSE
(AS SPECIFIED)
GUY WIRE
(AS SPECIFIED)
MULCH LAYER
(AS SPECIFI
STAKE (AS SPECIFIED)
DRIVE BELOW GRADE
ROOTBALL
REFER TO
ROOTBALL PIT DETAIL
L5 -3
7-1111E1111
TREE STAKING AND GUYING
SCALE: 1/2"=1
FILE NAMEsLAPLOO4
1
1
1
1
1
,1!"::.= I'e'�_`.r r' :t t;
11 11fZ
MULCH RING (BOTTOM
OF ROOTBALL PIT)
I l L .010'►• 1 i
,,t t,, t' 1 +11111111
..�...r•. 11111
1111 ��ryr`' HI 1111=
11 .11 Y WIN K' r. 1111 111 1
1IIIIIHIIII 1 II1 1 11 1 11 1 11 1 1 ill lilt=
m-
HEDGE PLANTING (SINGLE ROV'4)
SCALE: I =1'-0"
FILE NA) E:LAPLOIg1
PLANTING PROCEDURE
I. LAY OUT BED AND OUTLINE WITH TRENCH EDGE.
PLACE SOIL FROM EDGE WITHIN BED.
2. ROTOTILL BED TO 12" DEPTH. SPREAD 3" MIN.
LAYER OF PLANTING SOIL MIX OVER BED.
ROTOTILL SOIL MIX INTO TOP OF BED.
3. INSTALL PLANTS 4 MULCH. WATER THOROUGHLY
JUNIPER PLANTING IN MULCHED
8 CULTIVATED PLANTING AREA
FIL.I= NAME =LAFLO21
GUY WIRE
TOP OF
ROOTBALL PIT
TREE
RUBBER HOSE
ROOT BALL
NOTE:
SET TREE PLUMB
PRIOR TO STAKING
O.G.
SPACING
PLAN
ROOTBALL
GROWN BED 2 -3 TOP OF ROOTBALL TO
BE A MIN. OF 2" ABOVE FINISHED GRADE.
MULCH (A5 SPECIFIED)
CULTIVATE A 4" MINIMUM LAYER OF
SPECIFIED PLANTING SOIL MIX INTO BED.
FINISHED GRADE
UNDISTURBED SUB6RADE
TRENCH EDGE (TYP.)
CULTIVATE SOIL WITH ROTO- TILLER TO A
MINIMUM DEPTH OF 12" BREAK THROUGH
;f ANY EXISTING "HARDPAN" AND REMOVE
TO PROVIDE GOOD PERCOLATION 4
POSITIVE DRAINAGE.
UNDISTURBED SUSGRADE
BREAK THROUGH ANY EXISTING
HARDPAN AND REMOVE AS
NECESSARY TO PROVIDE GOOD
PERCOLATION 4 POSITIVE
DRAINAGE.
CULTIVATE SOIL IN LANDSCAPE
AREA TO MINIMUM DEPTH OF 12"
JUNIPER (AS SPECIFIED)
LEAVE NO ROOTS EXPOSED
MULCH LAYER (AS SPECIFIED)
PLANTING SOIL MIX (A5 SPECIFIED)
FINISHED GRADE
TRENCH EDGE (TYP)
EDGE OF LANDSCAPE AREA,
PAVEMENT EDGE, OR BACK OF
CURB.
REV. NO
r2
6 EXECUTIVE PARK DR 0 STE 300
ATLANTA 0 GEORGIA 30329
P 404 1 24811960
F 404 1 248 1 1092
EMAIL hgor@ hgor.com
www.hgor.com
FILE#
01237LD1
RELEASED FOR CONSTRUCTION
APPROVAL
REVISIONS
DATE
4/10/02
03/26/03
04/10/03
05/23/03
0
W
1—
PROJECT NO
SHEET TITLE
SHEET NO
DESCRIPTION
CITY COMMENTS
90% DISTRIBUTION SET
00% CONSTRUCTION DOCUMENTS
ADDENDUM #1
0
7
W
0
1—
J
W
U
z
cz
0
c.)
20- 01024.02
3/1/02
DATE
LANDSCAPE
DEVELOPMENT
DETAILS
LS3.0