Loading...
HomeMy WebLinkAboutLS3.0 Landscape RevisionsO _1 PLANTING PROCEDURE I. EXCAVATE ROOTBALL PIT. 2. ADD EXCAVATED SOIL 4 TAMP. SET TREE SUCH THAT ROOT FLARE IS 2 -3" HIGHER THAN FINISHED GRADE. 3. BAGKFILL W/ SOIL MIX 4 "WATER IN 4. COMPLETE BAGKF ILLI NG, CONSTRUCT TRENCH EDGE 4 ADD SPECIFIED MULCH. 5. STAKE 4 GUY SECURELY. SCALE :3 /4 =1' -'0" FILE NAMEtLAPLOOI RUBBER HOSE (AS SPECIFIED) GUY WIRE (AS SPECIFIED) MULCH LAYER (AS SPECIFIED) O SCALE: I /2"= I '-0" FIL1= NAl LAPWO FILE tY ROW SPACING GENERAL NOTES: I. SEE SPECIFICATIONS FOR DRAINAGE TEST REQUIREMENTS PRIOR TO PLANTING. SEC. 02Q00. 2. DO NOT ALLOW AIR POCKETS TO FORM WHEN BAGKF I LL I NG 3. IMMEDIATELY SOAK WITH WATER. 4. DO NOT BREAK ROOTBALL. TYPICAL TREE ROOTBALL PIT 11 1 1 1# .iii .ii .11�. .,s,. .sti._ EVRREN_TRE STAKING AND GUYING IN CULTIVATD AND MULCHED PLANTING AREA 11 ��av��a 1 =1111 flli IIII lllf llll flll 1111 1111 1111 1111 Illi =IIII= IIII =1111 =1111 =IIII =f IIN= 1111- IIII IIII Ill UNI1111 HEDGE PLANTING (DOUBLE sov) REMOVE BURLAP ON TOP 1/2 OF ROOTBALL FINISHED GRADE MULCH LAYER (A5 SPECIFIED) TRENCH EDGE (TYP) PLANTING SOIL MIX (A5 SPEC I F IED) ADD EXCAVATED SOIL AS NEEDED TO BRING TREE TO FINISHED GRADE. TAMP LIGHTLY BUT THOROUGHLY PRIOR TO SETTING TREE TO PREVENT SETTLING. SCARIFY BASE OF PLANT PIT WHEN EXCAVATING PIT. BREAK THROUGH 4 LOOSEN ALL "HARDPAN" (REMOVE AS NECESSARY TO FACILITATE DRAINAGE) GUY WIRE RUBBER HOSE ROOT BALL MULCH AREA (AS SPECIFIED) TOP OF ROOTBALL PIT TREE PLAN SGALE:1 /4 "•1' -0" NOTE: SET TREE PLUMS PRIOR TO STAKING CULTIVATED PLANTING SOIL STAKE (AS SPECIFIED) DRIVE BELOW GRADE ROOTBALL 0.0 SPACING PLAN ROOTBALL I" OF GROWN FOR EVERY FOOT OF BED WIDTH. TOPS OF ROOTBALLS TO BE SET A MINIMUM OF 2" ABOVE FINISHED GRADE. MULCH (A5 SPECIFIED) CULTIVATE A 4" MINIMUM LAYER OF SPECIFIED PLANTING SOIL MIX INTO BED. FINISHED GRADE UNDISTURBED SUBGRADE TRENCH EDGE (TYP) CULTIVATE SOIL WITH ROTO TILLER TO A MINIMUM DEPTH OF 12" BREAK THROUGH ANY EXISTING "HARDPAN" AND REMOVE TO PROVIDE GOOD PERCOLATION 4 POSITIVE DRAINAGE. RUBBER HOSE (As SPECIFIED) GUY WIRE (AS SPECIFIED) MULCH LAYER (AS SPECIFIED) O 141 1;1 FI =1 1 3 .7 w is M i 1_ 11 1 =V l= 1= H11 TREE STAKING AND GUYING B S IN CULTIVATED AND MULCHE PLANTING AREA i_ t-o" O RUBBER HOSE (AS SPECIFIED) GUY WIRE (AS SPECIFIED) MULCH RING STAKE (AS SPECIFIED) DRIVE BELOW GRADE ROOTBALL EXCAVATED SOIL MULTI -TRUNK TREE STAKING AND GUYING SCALE: I /2" =1'-O" FILE NAME:LAPLOII SLOPE SCALE :3 /4" II-O" FILE NAME :L.02 -16 tt PLANTING PROCEDURE I. LAY OUT BED AND OUTLINE WITH TRENCH EDGE. PLACE SOIL FROM EDGE WITHIN BED. 2. ROTOTILL BED TO 12" DEPTH. SPREAD 4" MIN. LAYER OF PLANTING SOIL MIX OVER BED. ROTOTILL SOIL MIX INTO TOP OF BED. 3. INSTALL PLANTS 4 MULCH. WATER THOROUGHLY. SHRUB PLANTING GUY WIRE TOP OF ROOTBALL PIT TREE -4/ s MULCH RING (BOTTOM OF ROOTBALL PIT) RUBBER HOSE ROOT BALL GUY WIRE TOP OF ROOTBALL PIT MULTI -TRUNK TREE- MULCH RING (BOTTOM OF ROOTBALL PIT) RUBBER HOSE ROOT BALL 'i YY •;<I I PLAN SGALEs V4'• 1'-O" NOTE: SET TREE PLUMB PRIOR TO STAKING CULTIVATED PLANTING SOIL STAKE (AS SPECIFIED) DRIVE BELOW GRADE ROOTBALL PLAN SCALE. V4 "•1' -0" NOTE: 1. ATTACH GUYS TO THE CENTRAL LARGEST TRUNK. 2. SPACE STAKES EVENLY AROUND (4 OUTSIDE) ROOTBALL PIT SUCH THAT WIRES DO NOT COME IN CONTACT WITH OTHER TRUNKS. 3. SET TREE PLUMB PRIOR TO STAKING SHRUB (AS SPECIFIED) LEAVE NO ROOTS EXPOSED MULCH LAYER (AS SPECIFIED) PLANTING SOIL MIX (AS SPECIFIED) FINISHED GRADE TRENCH EDGE (TYP) UNDISTURBED SUB6RADE CULTIVATE SOIL IN LANDSCAPE AREA TO MINIMUM DEPTH OF 12" BREAK THROUGH ANY EXISTING "HARDPAN" AND REMOVE AS NECESSARYTO PROVIDE GOOD PERCOLATION 4 POSITIVE DRAINAGE. RUBBER HOSE (AS SPECIFIED) GUY WIRE (AS SPECIFIED) MULCH LAYER (AS SPECIFI STAKE (AS SPECIFIED) DRIVE BELOW GRADE ROOTBALL REFER TO ROOTBALL PIT DETAIL L5 -3 7-1111E1111 TREE STAKING AND GUYING SCALE: 1/2"=1 FILE NAMEsLAPLOO4 1 1 1 1 1 ,1!"::.= I'e'�_`.r r' :t t; 11 11fZ MULCH RING (BOTTOM OF ROOTBALL PIT) I l L .010'►• 1 i ,,t t,, t' 1 +11111111 ..�...r•. 11111 1111 ��ryr`' HI 1111= 11 .11 Y WIN K' r. 1111 111 1 1IIIIIHIIII 1 II1 1 11 1 11 1 11 1 1 ill lilt= m- HEDGE PLANTING (SINGLE ROV'4) SCALE: I =1'-0" FILE NA) E:LAPLOIg1 PLANTING PROCEDURE I. LAY OUT BED AND OUTLINE WITH TRENCH EDGE. PLACE SOIL FROM EDGE WITHIN BED. 2. ROTOTILL BED TO 12" DEPTH. SPREAD 3" MIN. LAYER OF PLANTING SOIL MIX OVER BED. ROTOTILL SOIL MIX INTO TOP OF BED. 3. INSTALL PLANTS 4 MULCH. WATER THOROUGHLY JUNIPER PLANTING IN MULCHED 8 CULTIVATED PLANTING AREA FIL.I= NAME =LAFLO21 GUY WIRE TOP OF ROOTBALL PIT TREE RUBBER HOSE ROOT BALL NOTE: SET TREE PLUMB PRIOR TO STAKING O.G. SPACING PLAN ROOTBALL GROWN BED 2 -3 TOP OF ROOTBALL TO BE A MIN. OF 2" ABOVE FINISHED GRADE. MULCH (A5 SPECIFIED) CULTIVATE A 4" MINIMUM LAYER OF SPECIFIED PLANTING SOIL MIX INTO BED. FINISHED GRADE UNDISTURBED SUB6RADE TRENCH EDGE (TYP.) CULTIVATE SOIL WITH ROTO- TILLER TO A MINIMUM DEPTH OF 12" BREAK THROUGH ;f ANY EXISTING "HARDPAN" AND REMOVE TO PROVIDE GOOD PERCOLATION 4 POSITIVE DRAINAGE. UNDISTURBED SUSGRADE BREAK THROUGH ANY EXISTING HARDPAN AND REMOVE AS NECESSARY TO PROVIDE GOOD PERCOLATION 4 POSITIVE DRAINAGE. CULTIVATE SOIL IN LANDSCAPE AREA TO MINIMUM DEPTH OF 12" JUNIPER (AS SPECIFIED) LEAVE NO ROOTS EXPOSED MULCH LAYER (AS SPECIFIED) PLANTING SOIL MIX (A5 SPECIFIED) FINISHED GRADE TRENCH EDGE (TYP) EDGE OF LANDSCAPE AREA, PAVEMENT EDGE, OR BACK OF CURB. REV. NO r2 6 EXECUTIVE PARK DR 0 STE 300 ATLANTA 0 GEORGIA 30329 P 404 1 24811960 F 404 1 248 1 1092 EMAIL hgor@ hgor.com www.hgor.com FILE# 01237LD1 RELEASED FOR CONSTRUCTION APPROVAL REVISIONS DATE 4/10/02 03/26/03 04/10/03 05/23/03 0 W 1— PROJECT NO SHEET TITLE SHEET NO DESCRIPTION CITY COMMENTS 90% DISTRIBUTION SET 00% CONSTRUCTION DOCUMENTS ADDENDUM #1 0 7 W 0 1— J W U z cz 0 c.) 20- 01024.02 3/1/02 DATE LANDSCAPE DEVELOPMENT DETAILS LS3.0