Loading...
HomeMy WebLinkAboutMass Earthwork Plans Grading PlanL 0 0 (0= R i Ri 3/0 z O O rn� cn 3 m BUILDING AD AREA SEE SHEET NO.2, ITEM 02220, #4 STONE CAP 8" #53 STONE COMPACTED AS STATED 0 SWALE NO 2, ITEM 02220, #4 .c 1111■•••—dmit TEMPORARY DIVERSION SWALE 734.00 I1141Pk'N MN S op•z 679" 116WAIMMERMINwalm mil t leviratv 1 0 LOT #2 GRADING GENERAL \OTES: 1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD LOCATIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 2. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTOR'S AND /OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 3. PROVIDE POSTIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS AFTER INSTALLATION. CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, PONDING CONDITIONS EXIST. 4. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (location, size, and depth) SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENATIVE OF THAT UTILITY COMPANY CAN BE PRESENT TO INSTRUCT AND OBSERVE DURING CONSTRUCTION. 5. ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS. 6. SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE ELEVATIONS INDICATED. 7. ALL EXCESS DIRT TO BE REMOVED FROM SITE. East 96th Street Auto Park Sub. In s tr. #2001-00000285 REMO b VEG TATION 8. TEMPORARY DIVERSION SWALES TO BE CONSTRUCTED AND MAINTAINED THROUGHOUT FILLING PROCESS. SWALES ARE DIRECT RUNOFF INTO THE POND. 9. POND IS TO REMAIN UNLINED THROUGHOUT ENTIRE FILLING PROCESS. PERIODIC PUMPING OF THE POND MAY BE REQUIRED. CONTACT THE ENGINEER FOR A LOCATION OF DISCHARGE WHEN PUMPING IS REQUIRED. 10. CONTRACTOR SHALL MAINTAIN DRAINAGE OF DIVERSION SWALE ACROSS CONSTRUCTION ENTRANCE AT ALL TIMES. LOT CONSTRUCTION ENTRANCE 0 LEGE \D 50' 100' SCALE: 1" 50' 200' ti "DON'T DIG BLIND" A 1 -800 -382 -5544 CALL BEFORE YOU DIG II TBM 1 HARRRISON MONUMENT, SE COR. SE 1/4 SECTION 8—T17N—R4E. INTERSECTION OF 96TH STREET AND GRAY ROAD. ELEVATION 740.75 RELEASED FOR CONSTRUCTION APPROVAL .REVI'SI0NS REV. NO Q) O— y DATE 1 1 1 1 1 w fE 0 F- w a- U) 0 F- D Q w I F- PROJECT NO DATE SHEET TITLE MASS EARTHWORK GRADING PLAN SHEET NO DESCRIPTION 0 AD OM z C 4 X O o a o a 2 cL I N V_ 0 O t- N Q� I o xN N lO O Q rn03 MID STATES Job Number: 111 -1390 0 z LL! 0 z W U 20- 01024.02 April 8, 2003 4of6