Loading...
HomeMy WebLinkAboutC11a Maintenance of TrafficI Pi TAKE FOR 96TH STREET FLASHING ARROW BOARD River' Ridge •Larle 150' DRUMS SPACED 20' APART (TYP.) (Si; LANE 5' MX ELECTRIC UNE EASBIEHIS FOR ANCHORS 130' J 2' NON—ACCESS EASEMENT /NM •MIIM0 2' NON—ACCESS EASEMENT OINNOMIN *I TYPE III BARRICADE NO LEFT TURN ROAD CLOSED 15' D. U.E. 60' B.S.L. 200' 96th. STREET MAINTENANCE OF TRAFFIC PLAN SCALE: 1" 50' 15' LM.E. D. U.E. In DRUMS SPACED 20' APART (TYP.) 15' LM.E. D. U.E. 431VMS 431VMS 4•39VMS 31VMS (•31VMS DRUMS SPACED 20' APART (TYP.) OI'd "35, P: 14 P 60' B.S.L. GRAY RD. MAINTENANCE OF TRAFFIC PLAN SCALE: 1" LOT 2 4 2.31 AC (BASED ON NEW R/W, NOT al INCLUDING STORMWATER MANAGEMENT) t OUTLOT 2 2.89 ACRES DRUMS SPACED 20' APART (TYP.) 15' LM.E. D. U.E. Ii I :c.wer :':52 NOTE: CONTRACTOR TO COORDINATE WITH THE CITY OF CARMEL ON TRAFFIC SIGNAL DURING CONSTRUCTION. CONTACTS: SIGNAL MAINTENANCE FOR CARMEL DAN HILL (317) 894-0120 CITY OF CARMEL INSPECTOR DAN GRESKAMP (317) 571-2441 DRUMS SPACED 20' APART DUD 2' NON—ACCESS EASEMENT TEMPORARY 4" PAVEMENT TAPE, WHITE 4" PERMANENT WHITE SKIP ON COMPLETION 1 3 0 0 15' L.M.E. D. U.E. 60' HALF RIGHT—OF—WAY .4 't 1 TEMPORARY 4" PAVEMENT TAPE, WHITE 4" PERMANENT WHITE SKIP ON COMPLETION 11\ SWALE-)-- --4 31VMS ÷31VMS +37VMS. 88' fb. 711111111111111111 DRUMS SPACED 20' APART (TYP.) 0.0 TEMPORARY 4" PAVEMENT TAPE, WHITE 4" PERMANENT WHITE SKIP ON COMPLETION TIMING 1. CONTRACTOR TO MAINTAIN 2 TRAVEL LANES ALONG WEST BOUND 96th STREET FROM 6:00 AM TO 10:00 AM WEEKDAYS. 2. CONTRACTOR TO MAINTAIN 2 TRAVEL LANES ALONG EAST BOUND 96tH STREET FROM 3:00 PM TO 7:00 PM WEEKDAYS. 3. THE PLAN SHOWN HEREON SHOWS THE ONE LANE SETUP FOR BOTH LANES IN THE TIMES ALLOWED. FOR TIMES WHERE TWO LANES ARE REQUIRED, THE CENTER BARRELS ARE TO BE PLACED ADJACENT TO THE PROPOSED CENTER CURB LEAVING THE SECOND REQUIRED TRAVEL LANE. 60' B.S.L. 200' 120' 15' L.M.E. D. U.E. 2' NM—ACCESS EASEMENT ./ariss SWALE*---- (•31VMS +31VMS 31VMS "DON'T DIG BLIND" 150' 1-800-382-5544 CALL, BEFORE YOU DIG 0.0 DRUMS SPACED 20' APART (TYP. 0 0 Iplo•-••••-•-••1 100' 200' 500' 200' 500' 60' HALF RIGHT—OF—WAY TBM 1 HARRISON MONUMENT, SE COR. SE 1/4 SECTION 8—T17N—R4E. INTERSECTION OF 96TH STREET AND GRAY ROAD. ELEVATION 740.75 ■■•••=0. 150' NOT APPROVAL REVISIONS REV. MO CD CD Lf) r•r) RELEASED FOR CONSTRUCTION DATE 11/7/03 6.$ a) C 0 0 H bJ H PROJECT NO SHEET TITLE SHEET NO 0 0 d LEI 0 0 1— Z w 0 o. J r cn I- D N 0 1. w 0 ft I I— I's X 4, X X 0 0 MID—STATES Job Number: 121-5345 DESCRIPTION CHANGE BULLETIN 6 N z L.] F— (I) 20-01024.02 APRIL 10 2003 DATE MAINTENANCE OF TRAFFIC Clla of 16 lAid L:89:£ £00Z/01./1-1- I. 30Vd I. NIVid IOVi NVid gt.E9 oc