Loading...
HomeMy WebLinkAboutC9 Stormwater ExtensionSTORM SEWER STRUCTURE DATA TABLE a STRUCTURE TYPE CASTING TYPE PIPE ELEVATIONS SLOPE CONNECT TO STRUCT. REMARKS IF SIZE TYPE T.O.0 U/S D/S E.S. End Section 117' 27" RCP N/A 732.39 732.28 0.11X 190 190 Manhole Type "J" NEENAH R -1642 120' 27" RCP 738.00 732.26 732.13 0.11% 191 191 Manhole Type "J" NEENAH R- 2580 -D1 134' 27" RCP 737.50 732.13 731.99 0.10% 194 192 Manhole Type "J" NEENAH R- 2560 -D1 44' 27" RCP 735.85 732.42 732.31 0.25% 193 E.S. Outfall Structure 38' 27" RCP N/A 732.50 732.42 0.22% 192 193 Manhole Type "J" NEENAH R -1642 298' 27" RCP 738.75 732.31 731.99 0.11X 194 194 Manhole Type "J" NEENAH R -1842 239' 27" RCP 740.25 731.99 731.73 0.11X 195 195 Manhole Type "J" NEENAH R- 2580 -D1 138' 27" RCP 738.60 731.73 731.58 0.11% 198 198 Manhole Type "J" NEENAH R- 2560 -D1 200' 27" RCP 735.80 731.58 731.38 0.11X 197 197 Manhole Type "J" NEENAH R -1842 320' 27" RCP 739.35 731.36 731.00 0.11X 198 198 Manhole Type "J" NEENAH R -1842 113' 27" RCP 739.20 731.00 730.89 0.10% 198A 198A Manhole Type "J" NEENAH R -1642 197' 27" RCP 739.65 730.89 730.70 0.10% 199 199 Manhole Type "J" NEENAH R -1842 107' 27" RCP 740.50 730.70 730.50 0.19% ES Conn. to Conc. End Seat. I I ,�ttii�ra?%r /is�t��l/i�e��'� 1 f. INV W.= '30.89 INV E;%-1730.89 INV 113 LF OF 27, NV RCP 0.10% TE TEMPORARY DITCH CHECK TO BE REMOVED AFTER CONSTRUCTION E*ISTING OF PAVE WIDE ELECTRIC TS FOR ANCHORS 6F 27" 1 GV ao C1 I ce TC= 736.72 1 x.65 r A IA fi 1 N x r, I r''/ 1 r, ''p r I N tE CARMEL CREEKI`'730 F,, VV CREEK 741 'I- N\ ER 18057CO237F DATED: FEB. 19, 200`3. f I RIGHT -OF -WAY PER INF. #200100000285 \J J fib ra 'V I 1: i t •p, I t ix 107 '\.LF\OF (27" t Jc' RIFY TO CREEK AN4L AC E ENy le-RAP x t 'l g✓ Ji Ire G ;/G! 5s, J Y n bG R vo O.1go R/W 1 4.-- 24" s TEMPo RAVEL EROSION CO! itROL BA TO BE ITEM 0 VED AFTER CONSTE UCT1ON /4,31S, COMPLE SE DETAIL SHEET C13. K, i /i �C =740. s INV W. 30.70 INV ,E=730.70 t ``Mew fi J 1 i ts; \t` ::::litO T EXISTING EDGE \t OF PAVEMENT A r f 1� i PROPOSE) 5' WIDE ItLECTRIC INE EASEMENTS FOR ANCHORS 97 LF, .CAF RCP 0.1 n STORM SEWER NOTE THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. DEVIATIONS FROM THE APPROVED DESIGN SHALL ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF ANY SUCH DEVIATION SHALL BE INC LUDED AS A REQUIREMENT ON AS -BUILT /RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 FPS OR LESS (AT FULL FLOW CAPACITY) SHALL REQUIRE AS-BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION. THE CONTRACTOR IS INSTRUCTED TO AS -BUILT EACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS, AND AS APPROVED BY THE CITY OF CARMEL. WINO WINO .11=0 j ca" A.. 1/4`. 1.V N t9°58'44" W G 1 X 'Z' STEEL GUARDRAIL b\` L 1 V� R/W STEEL x GUARDRA,k C M i I 740 96TH STREET WIDTH OF ASPHALT VARIES r ri G:141 I VV W r" c GV -BTC BTC 8TC 8TC 8TC 8TC BTC BTC y ,r i PROPOSED 5' WIDE ELECTRIC LINE EASEMENTS FOR ANCLIORS t V t r: .0 V' X 4, ,:G 7,, NC. BRIDGE-- ABU CC MENT A D I WITH METAL' RAILING ,J'x I WV JA L r:, f,� .-W- EXISTING EDGE= OF PAVEMENT K r C, ‘yJ SCALE: 1" 30' CONC. BRIDGE ABUTMENT 1 1 1 1 t /J I r 1 1 A J 'i t 1 1 j1 CONCRETE BRIDGE DECKING X J e day R /W t3 4 4, A A V ASPHALT CARMEL CREEK OUTFALL DETAIL CONTRACTOR :\f‘DJU,§T CAS'TINGS TO MACH EXISTING „GRAD,r I EAS OFFS1TE STORM WATER EXTENSION EROSION CONTROL STEEL GUARDRAIL CD SCALE: 1" 30' V TEMPORARY DITCH CHECK BE REMOVED AFTER CONStRUCT1ON EASEVENTS FOR ANCHORS RAISE/ ROLES/GUY WIRES:- AS NEEDD 'FOR CON,STRUdtION 20,0V OF 27" gariL,Ank.,,arozi: UTILITY CONTACTS INV W.=731.58 E SANITARY SEWER City of Carmel Water Wastewater Utilities 130 1st Ave. SW Carmel, Indiana 46032 Jim Haag (317) 571-2648 STORM SEWER Dept of Engineering One Civic Square Carmel, Indiana 46032 Dick Hill (317) 571-2441 GAS Citizens Gas Coke Utility 2020 North Meridian Street Indianapolis, IN 46202 Wendoll Brown (317) 927-4372 ELECTRIC Indianapolis Power Light Company 3600 N. Arlington Avenue Indianapolis, IN 46218 Linda Rhea (317) 261-5274 Cinergy 1441 S. Guilford Carmel, Indiana 46032 Larry Griffin (765) 454-6571 WATER Indianapolis Water Company 1220 Vqaterway Boulevard Indianapolis, IN 46202 Bill Bruce (317) 263-6309 STREETS Dept of Ensgineering One Civic Square Carmel, Indiana 46032 Dick Hill (317) 571-2441 TELEPHONE Ameritech 5858 North College Avenue Indianapolis, IN 46220 Steve Krebs (317) 252-4275 CABLE TV Comcast Cable of Indianapolis, Inc. 5330 E. 65th Street Indianapolis, IN 46220 Gary Richardson (317) 872-2225 en EXISTING PROPOSED UTILITY GENERAL NOTES: LEGEND STORM SEWER SANITARY SEWER MANHOLE INLET END SECTION STRUCTURE NO. STRUCTURE NO. WATER UNE LATERAL FORCE MAIN AIR PRESSURE RELEASE VALVE HOSE BIB DOUBLE WATER METER PIT WATER VALVE FIRE HYDRANT PERMANENT SEEDING STRAW BALES DITCH CHECK 4. DO NOT SCALE FROM THESE PLANS FOR SURVEY FIELD LOCATIONS. 5. TRENCHES FOR ALL STORM AND SANITARY PIPES ARE TO BE BACKFILLED COMPLETELY WITH ENGINEERED GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT. 1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESOPNSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 2. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTOR'S AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 3. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (LOCATION, SIZE, AND DEPTH) SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE OF THE UTILITY MAY BE PRESENT TO INSTRUCT AND OBSERVE DURING CONSTRUCTI )N. FM 6. CONTACT UTILITY COMPANIES PRIOR TO REMOVAL OR ABANDONING OF ANY EXISTING UTILITY LINE SERVING THE SITE. 7. SEE SHEETS C3 C4 FOR SITE PLAN. 8. SEE SHEETS C5 C6 FOR GRADING PLAN 9. UTILITY POLE RELOCATIONS TO BE DETERMINED BY UTILITY COMPANIES. CONTRACTOR TO COORDINATE RELOCATION WITH UTILITY COMPANIES. (STORM) 0 (SANITARY) 10. CONTRACTOR TO PHOTOGRAPH ALL EXISTING CONDITIONS AND KEY ELEMENTS. PRIOR TO BEGINNING WORK AND RESTORE GROUND TO EXISTING CONDITIONS AFTER CONSTRUCTION. AS-BUILT SURVEY TO VERIFY. IN WHICH OFFS1TE WORK IS TO BE PERFORMED IN WRITING AT LEAST ONE WEEK PRIOR TO START OF WORK. OWNER TO BE COPIED ON THIS CORRESPONDENCE. 12. CONTRACTOR TO LIMIT WORK TO AREA WITHIN THE PUBLIC RIGHT-OF-WAY 1 3. CONTRACTOR TO OPEN CUT ENTRANCE DRIVE TO PLACE PIPE. TRENCH TO BE BACKFILLED WITH FLOWABLE FILL. PAVEMENT TO BE PLACED, MUST MATCH EXISTING THICKNESS. 14. CONTRACTO TO REPLACE ANY PATHS, CURBS, SIDEWALKS AND SEEDING WITHIN THE PUBLIC RIGHT-OF-WAY, WHICH WILL BE DISTURBED OR REMOVED DURING OFFSITE STORM CONSTRUCTION. NOT da co APPROVAL S REVISIONS REV. NO DATE 7/24/03 9/9/03 10/02/03 10/09/03 0 PRO NO DATE SHEET TITLE SHEET NO 0 0 0 cn MID-STAMS Job Number: 121-5345 0 ui Ili (4 IV C CC C41) 4er. ao. sc 0 0 e 0 in a. *a Pa g m RELEASED FOR CONSTRUCTION DESCRIPTION CHANGE BULLETIN 1 CHANGE BULLETIN 4 CHANGE BULLETIN 4 CHANGE BULLETIN 5 0 LIJ LLI rh 20-01024.02 May 8, 2003 STORMWATER EXTENSION C9 of 15 SUPERSTORE