Loading...
HomeMy WebLinkAbout09050022 C3.1 Utility PlanKIEL THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. DEVIATIONS FROM THE APPROVED DESIGN SHALL ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF ANY SUCH DEVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS- BUILT /RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 FPS OR LESS OR 10 FPS OR GREATER (AT FULL FLOW CAPACITY) SHALL REQUIRE AS -BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION, PRIOR TO BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED TO AS -BUILT EACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL. WOOGL. D .!,PEA r I 1111111111111 WIMP Cs .0* 1" 1 o 7' it 1 TR. #13 STM. UMW MOO 67 L.F. OF 6" PVC SANITARY LATERAL 0 1.0% SLOPE MIN. SAN I 1% SLOPE MIN. TYPE 3 SAN. CLEANOUT INV =871.80 1 st6 4 TYPE 3 SAN. CLEANOUT INV =872.09/' 1 36 L.F. OF 6" PVC SANITARY LATERAL 0 1% SLOPE MIN. INV =863.7 TYPE 3 SAN. CLEANOUT INV= 871.16 INV= 871.13 100 L.F. OF 6" PVC SANITARY LATERAL 0 1% SLOPE MIN. FIRE HYDRANT ASSEMBLY 6" FIRE LINE STM. STR. #6 UTILITIES TO B -BORED BENEATH ROAD PROPOSED BULDING SEE SANITARY LATERAL 58,280 S.F. BUILDING CONNECTION 4.5 AC± DETAIL F.F.E.= 879.95 6" FIRE LINE (SIZE TO BE VER IFIED) CONTRACTOR TO COORDINATE ELECTRIC, TELEPHONE AND CABLE CONNECTIONS WITH CITY SERVICE PROVIDER �sl 43. CONTRACTOR TO COORDINATE TAPPING SLEEVE AND VALVE INSTALLATION WITH WATER COMPANY S T S f T watsrassum=ama ::T ST irmssamszassminmaa f STM. STR. #11 ST O =BEC o BEC "'SEC B BEC CONTRACTOR TO COORDINATE WITH VECTREN ON GAS SERVICE LINE AND CONNECTION. STM. STR. #10 STM. STR. #9 FIRE HYDRANT ASSEMBLY THRUST BLOCK REQ'D. TYP. 5T oftemoomemexecorma ST ST ST WOOD D AR A WATER SERVICE CONNECTION DETAIL SCALE: 1 =10' B v6EC B BTCBEC 970 BEC r3 is DEC SANITARY LATERAL BUILDII4Q CONNECTION DETAIL SCALE: 1"=10' PROPOSED UTILITY LEGEND G E T W GM SANITARY C.O. TOR= 879.80 I NV=872.00 SANITARY C.O. TOR= 879.75 INV= 871.80 SANITARY SEWER LINE GAS LINE ELECTRIC LINE TELEPHONE LINE WATER LINE GAS METER ELECTRICAL TRANSFORMER VALVE WATER METER PIT MANHOLE PROPOSED LIGHT NOTE: DOUBLE CHECK ASSEMBLY FOR FIRE PROTECTION LINE AND BACKFLOW PREVENTORS AND WATER METERS FOR DOMESTIC SERVICE LINE TO BE LOCATED INSIDE THE BUILDING. REFER TO FIRE PROTECTION PLUMBING PLANS FOR EXACT LOCATION DETAIL. FIRE PROTECTION ENGINEER TO COORDINATE LOCATION OF F.D.C. W/ LOCAL FIRE MARSHAL. NOTES: 1. CONTRACTOR TO COORDINATE UTILITIES 0 BUILDING LOCATION WITH ARCHITECTURAL AND MEP PLANS. 2. REFER TO FIRE PROTECTION AND PLUMBING PLANS FOR FIRELINE AND DOMESTIC WATER LOCATIONS AND SIZES. WATERMAIN LOCATION TO BE FIELD VERIFIED. CONTACT ENGINEER AND WATER COMPANY IF A CONFLICT EXISTS 7 1 W BT" BEC :2 BEC BEC "BEC 2 mew -c- -0- -0- -0- -0- -0- -0- -0- r- w- r- r- w- r- -w -w- -E -E -E -E -E -E -E -T -T -T -T -T 'T -CIV- -car- -C1V- -mV- -WV- -01V- -clV- -STD- -rTO- -.10- -9m- -910- -91D-- -RTC- -103- -EEC- -SEC- -SEC- -SEC- -MED- -SEC- -SCIV- -9CN- -SCItl- -alav- -SCIV- -SCN- D. M. P. R. L. FND. SCALE: 1 =40' 0' BUSTING LEGBD SANITARY SEWER MANHOLE STORM SEWER; END SECTION, INLET M.H. c GAS LINE WATER LINE ELECTRIC LINE (AERIAL) TELEPHONE LINE (AERIAL) CABLE TELEVISION (AERIAL) BURIED TELE. CABLE BURIED ELEC. CABLE BURIED CABLE TV RIGHT OF WAY LINE EASEMENT LINE CENTER LINE GM RIO DEED DIMENSION MEASURED DIMENSION PLAT DIMENSION RADIUS ARC LENGTH FOUND o DENOTES A 5/8" DIA. REBAR WITH YELLOW PLASTIC CAP SET. CAP STAMPED "P.1. CRIPE FIRM NO. 0055" UNLESS OTHERWISE NOTED. 0 DENOTES A MAG NAIL W /SHINER SET. SHINER STAMPED "P.I CRIPE FIRM NO. 0055" UNLESS OTHERWISE NOTED. PROPERTY CORNERS WERE ONLY SET FOR THE INDIGO HOTEL PROPERTY 40' 0 POWER POLE GUY WIRE TELEPHONE RISER UTILITY RISER; ELEC. CTV ELECTRIC TRANSFORMER STREET LIGHT LIGHT POLE FIRE HYDRANT VALVE; GAS WATER STREET SIGN ELECTRIC MANHOLE TELEPHONE MANHOLE SEWER CLEANOUT WATER METER GAS METER ELECTRIC METER PIPELINE MARKER POST PIPELINE PATROL PLANE MARKER PIPELINE CASING VENT PIPELINE TEST STATION 1 80' FLOOD LIGHT TRAFFIC SIGNAL MAILBOX SPRINKLER HEAD GENERAL UTILITY NOTES 1. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATIONS. 2. SITE GRADING SHALL NOT PROCEED UNTIL EROSION CONTROL MEASURES HAVE BEEN INSTALLED, AND STORM WATER MANAGEMENT PERMIT IS ISSUED. 3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS (VERTICAL AND HORIZONTAL) IN THE FIELD PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 4 THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTOR'S AND /OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 5. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (location, size and depth SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE OF THAT UTILITY COMPANY CAN BE PRESENT TO INSTRUCT AND OBSERVE DURING CONSTRUCTION. 6. TRENCHES FOR ALL STORM DRAINS SHALL BE BACKFILLED IN ACCORDANCE WITH THE CITY OF CARMEL'S 10 -28 BACKFILL DETAIL FOUND ON SHEET C6.3. AFTER STRIPPING TOPSOIL MATERIAL, PROOFROLL WITH A MEDIUM WEIGHT ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE MATERIAL. THE NECESSITY FOR SUBDRAINS AND /OR REMOVAL OF ANY UNSUITABLE MATERIAL WITHIN THE PROPOSED PARKING AREAS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION. 8. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, "BIRD BATH" CONDITIONS. 9. ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS. 10. SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE ELEVATIONS INDICATED. 11. ALL STORM SEWER MATERIALS AND INSTALLATION SHALL CONFORM TO LOCAL STANDARDS. 13. WATER AND SEWER BACKFILL WITHIN LIMITS OF FUTURE RIGHT -OF -WAY SHALL CONFORM TO CITY STANDARDS PER NOTES ON SHEET C3.2. 14. THERE SHALL BE NO WATER VALVES, FRAMES OR CASTINGS WITHIN THE PAVEMENT, CURB OR SIDEWALK /ASPHALT PATH WITH THE EXCEPTION OF CURB INLETS WITHIN THE EXISTING OR PROPOSED RIGHT -OF -WAY. NOTE: NO EARTH DISTURBING ACTIVITIES MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. NOTE: IF IT WILL BE NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OF SUCH RELOCATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. ALL UTILITY POLES SHALL BE LOCATED WITHIN IN FOOT OF THE PROPOSED RIGHT -OF -WAY. 12. INVERTS AT PIPE OUTLETS ARE GIVEN AT END OF PIPE END SECTION. CAUTION THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND EVIDENCE including, but not limited to, manholes, inlets, valves, and marks made upon the ground by others AND ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION. 1 -800- 382 -5544 CALL TOLL FREE INDIANA UNDERGROUND 01.1111. STRUCTUREPOINT 7260 SHADELAND STATION INDIANAPOLIS, IN 46256 -3957 TEL 317.547.5580 FAX 317.543.0270 www.structurepoint.com BROWNING INVESTMENTS INC. 6100 W. 96TH STREET SUITE 250 INDIANAPOLIS, IN 46278 INDIANA SPINE GROUP MERIDIAN MAIN CARMEL, INDIANA CONSULTANTS DRAWN BY. CHECKED BY' DATE. 05.22.09 ISSUED FOR. ADLS STAFF REVIEW PROJECT u' mix! UTILITY PLAN C3.1 FED BY 7 02009.00531 EEM TMJ DATE. 07/03/09