Loading...
HomeMy WebLinkAbout09050022 C5.1 Stormwater Pollution Prevention PlanBC.; 879.73 "I r BC 8 S79.65 IC 11 a79.50 BC 879.00 57•;0 0C 878.5 IC 879.32 BC 87:'.82 r 879.1 BC 878.6 Tr 878 8C 878 C 8 78.86 0 878.3P TC 878.94 BC `;8.44 IBC, 878.46 TO R 77 PC 87R.73 TC 878.95 0 TC ,87 BC 87R.66 STM. STR. #1 TOR= 876.20 1 876.6.D ;879.95 "Y�1 8 8. BC .78. 8.12 TC 879 0 BC 7R. 5 .,0 879 .1 BC 878.51 a `J 6, 4 pp 87 0/1 5 $8 78.88 878.6b F'P' 15 E R I l /6 017 rp,eiS 1 i 4.11111. WNW NOTE: THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. DEVIATIONS FROM THE APPROVED DESIGN SHALL ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF ANY SUCH DEVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS- BUILT /RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 FPS OR LESS OR 10 FPS OR GREATER (AT FULL FLOW CAPACITY) SHALL REQUIRE AS -BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION, PRIOR TO BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED TO AS -BUILT EACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL. 'WOODED A ;'CA, 1GE HLDE�% 9 j i i v C ;e• 73 ;x S H DER i i' j 1 //7 /j%fi i /ej j f /i %ii_ !i %ij f /j /%ii j f //7 f' �f; i ii i %'f /r .2 i x`71 '1`.'. 4,,..-„„ /j i f t/::/ j 1r .1 G r ';j i j "Q i r.D -E SHLDEF i 0. A i 4a ..,-.p 3E SHLDER L. ROCK CHECK s DONUT SHLDE /z s �a \1 1 .4.1/1,/ /t, mac/ i a 1 _f ''.4..;" i %r i 4! r`•_• EXISTING STORMWATER DETENTION POND n TC 5J 5.3 BC 575.00± IMMO STM. 1 01001. 9•1910 eofto` BC, 876.37 GRAVEL CONSTRUCTION" ENTRANCE REVD RIP RAP RED 1111••■ MEND STM. STR. #9 TOR=877.80 FUTURE 0 879.20 0 878.70 Ezr 1 EROSION CONTROL BLANKET REIM NOTE: NO EAR11-1 DISTURBING ACTIVITIES MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. NOTE: IF IT WILL BE NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OF SUCH RELOCATION SHALL BE THE RESPONSIBILITY OF 'THE DEVELOPER. ALL UTILITY POLES SHALL BE LOCATED WITHIN IN FOOT OF THE PROPOSED RIGHT-OF-WAY. t PROPOSED EROSION CONMQL LEGEND 1111111( SF )111111 SILT FENCE N CrA CATCH-ALL INLET PROTECTION SILT FENCE INLET PROTECTION CROSBY SILT LOAM, 0 TO 3 PERCENT SLOPES EROSION CONTROL BLANKET GRAVEL CONSTRUCTION ENTRANCE SOIL BOUNDARY MIN1 DISTURBED AREA NOTE: CONTRACTOR SHALL MAINTAIN ALL SILT FENCE INLET PROTECTION BOXES UNTIL PAVEMENT IS INSTALLED. AFTER PAVEMENT, CATCH-ALL INLET PROTECTION SHALL BE MAINTAINED IN EACH INLET UNTIL CONSTRUCTION IS COMPLETE. D. M. P. R. FND. SANITARY SEWER MANHOLE STORM SEWER; END SECTION, INLET GAS LINE WATER LINE ELECTRIC LINE (AERIAL) TELEPHONE LINE (AERIAL) CABE TELEVISION (AERIAL) BURIED TELE. CABLE BURIED ELEC. CABLE BURIED CABLE TV RIGHT OF WAY LINE EASEMENT LINE CENTER LINE DEED DIMENSION MEASURED DIMENSION PIAT DIMENSION RADIUS ARC LENGTH FOUND o DENOTES A 5/8" DIA. REBAR WITH YELLOW PLASTIC CAP SET. CAP STAMPED "PI CRIPE FIRM NO. 0055" UNLESS OTHERWISE NOTED. 0 DENOTES A MAG NAIL W/SHINER SET. SHINER STAMPED "P.I CRIPE FIRM NO. 0055" UNLESS OTHERWISE NOTED. 40' 0 43- Al ccb "Ao FLOOD PLAIN STATEMENT THE SITE IS NOT LOCATED WITHIN ANY FLOODPLAIN, FLOODWAY OR FLOODWAY FRINGE AS INDICATED ON THE FLOODWAY INSURANCE RATE MAP COMMUNITY PANEL NUMBERS 18057CO206F AND 18057CO207F DATED FEBRUARY 19, 2003. EROSION CONTROL NOTES 1. LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION. 2. CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL ORDINANCES THAT APPLY. 3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. 4. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON SITE INSPECTION. 5. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE. 6. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROM THE SITE BY STORM WATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED. 7. SEDIMENT BEING TRACKED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE SITE FOR DISPOSAL. 8. SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL BE BE COLLECTED AND RE-DISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND AT LEAST ONCE A WEEK. 9. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 10. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITFIIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT ALLOWED ON SITE. 11. THE SITE IS NOT LOCATED WITHIN ANY FLOODPLAIN, FLOODWAY OR FLOODWAY FRINGE AS INDICATED ON THE FLOODWAY INSURANCE RATE MAP COMMUNITY PANEL NUMBERS 18057CO206F AND 18057CO207F FEBRUARY 19, 2003. 12. SCHEDULE OF EARTHWORK ACTIVITIES: a. THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED AS SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY CEASES FOR MORE THAN 15 DAYS OR AS DIRECTED BY THE ENGINEER. b. TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIMES OF THE YEAR. PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER FINAL GRADING OR AS SOON AS POSSIBLE. CAUTION THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND EVIDENCE including, but not limited to, manholes, inlets, valves, and marks made upon the ground by others AND ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH 'THERE IS NO ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION. 1-800-382-5544 CALL TOLL FREE INDIANA UNDERGROUND 80' POWER POLE GUY WIRE TELEPHONE RISER UTILITY RISER; ELEC. CTV ELECTRIC TRANSFORMER STREET LIGHT LIGHT POLE FLOOD LIGHT TRAFFIC SIGNAL FIRE HYDRANT VALVE; GAS WATER STREET SIGN ELECTRIC MANHOLE TELEPHONE MANHOLE SEWER CLEANOUT WATER METER GAS METER ELECTRIC METER ID PIPELINE MARKER POST Eia PIPELINE PATROL PLANE MARKER PIPELINE CASING VENT PIPELINE TEST STATION MAILBOX SPRINKLER HEAD 0 11111 AMERICAN STRUCTUREPOINT INC 7260 SHADELAND STATION INDIANAPOLIS, IN 46256-3957 TEL 317.547.5580 FAX 317.543,0270 www.structurepoint.com BROWNING INVESTMENTS INC. 6100 W. 96TH STREET SUITE 250 INDIANAPOLIS, IN 46278 INDIANA SPINE GROUP MERIDIAN MAIN CARMEL, INDIANA CONSULTANTS 4 I 41 DRAWN BY. CHECKED BY. N3SUED FOR. 1 ADLS STAFF REVIEW C5.1 4. 0 STATE OF 441 l'';';'4.451 CC Y 7/ DATE. 05.22.09 PROJECT 02009.00631 EBA TIM DATE. 07/03/09 STORM WATER POLLUTION PREVENTION PLAN