Loading...
HomeMy WebLinkAbout09050022 C5.2 Stormwater Pollution Prevention Details,SEASONAL SOIL PROTECTION CHART STABILIZATION PRACTICE JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. PERMANENT SEEDING A /I */1/- DORMANT SEEDING B B TEMPORARY SEEDING C D E 1 SODDING F** /I MULCHING G 0 0 0 THE CATCH -ALL IS AN INLET AND CATCH BASIN FILTRATION DEVICE DEVELOPED TO PREVENT SEDIMENTATION. CATCH -ALLS ARE AVAILABLE TO FIT VIRTUALLY ANY DRAINAGE STRUCTURE CASTING, AND COULD REPRESENT A BEST MANAGEMENT PRACTICE FOR YOUR EPA PHASE 2 PROGRAM. HANDLES FOR EASY REMOVAL POLYESTER MESH REINFORCEMENT (OUTER LAYER) CATCH -ALL STORMWATER INLET PROTECTOR OVERFLOW FEATURE STAINLESS STEEL BAND (HEMMED INTO BAG) POLYPROPYLENE GEOTIXFILTER FABRIC (INNER LAYER) CATCH -ALL HAS BEEN APPROVED FOR USE ON MANY MOT ROAD CONSTRUCTION PROJECTS. INDIANAPOLIS, IN 46220 PHONE (317) 917 -2180 FAX (317) 917 -2181 TOLL FREE (800) 597 -2180 www.d2lwr.com TEMPORARY INSTALLATION: CONSTRUCTION PROJECTS ON HIGHWAYS AND NEW HOUSING DEVELOPMENTS CAN RESULT IN SUBSTANTIAL AMOUNTS OF SEDIMENT DURING A RAINSTORM. TRADITIONAL PRACTICE, USING SILT SCREENS, HAY BALES, AND FILTER FABRIC UNDER STORM GRATES PROVIDE ONLY LIMITED PROTECTION. CATCH -ALL WILL HOLD 2 CUBIC FEET OF GRAVEL, SILT, AND DEBRIS, AND CAN BE MOVED FROM SITE -TO SITE. PERMANENT INSTALLATION: COMMERCIAL AND INDUSTRIAL SITES WITH IMPERVIOUS SURFACES, SUCH AS ROADS AND PARKING LOTS, PRODUCE STORMWATER RUN -OFF THAT MAY INCLUDE PAPER REFUSE, CIGARETTES, SEDIMENT, AND EVEN SOME FLOATING OILS. THESE CONTAMINANTS CAN QUICKLY ADD UP TO A SIGNIFICANT AMOUNT IN CATCH BASINS OR MUNICIPAL SYSTEMS. WITHOUT PROPER TREATMENT, STORMWATER LADEN WITH SUCH MATERIALS CAN POLLUTE STREAMS, LAKES, AND NEAR SHORE WATERS. THE UNIQUE DESIGN OF THE REUSABLE STEEL FRAME OF CATCH -ALL PROVIDES AN OVERFLOW CAPACITY GREATER THAN THE OPEN AREA OF THE GRATE IT FITS UNDER. THIS MEANS LITTLE CHANCE FOR WATER TO BACK UP OR POOL, EVEN BETWEEN SCHEDULED CLEANINGS. THE DURABLE, REINFORCED SEDIMENT BAG CAN BE CLEANED NUMEROUS TIMES AND IS EASILY REPLACED IN THE FIELD. THE ENTIRE UNIT IS INSTALLED BELOW GRADE AND NO REBAR, CLIPS, OR STRAPS ARE EXPOSED ON THE SURFACE. WITH A TOP FLANGE LESS THAN 1/8" THICK, THE ADDITIONAL HEIGHT EXPOSURE OF THE GRATE IS MINIMAL. CATCH -ALL CAN BE AN IMPORTANT SUPPLEMENT FOR CATCH BASINS AND UNDERGROUND STORMWATER STORAGE SYSTEMS THAT ARE USUALLY DIFFICULT TO ACCESS FOR CLEANING. CATCH -ALLS ARE AVAILABLE TO FIT VIRTUALLY ANY DRAINAGE STRUCTURE CASTING. D2 LAND WATER RESOURCE INC. P.O. BOX 20792 FILTER FABRIC NON WOVEN GEOTEXTILE FABRIC FLOW EXTEND FABRIC WIRE TO 6" BELOW SURFACE SPACE POSTS PER I MANUFACTURER I RECOMMENDATIONS WIRE WOOD POST NOTE: SILT FENCE CONSTRUCTION NOT TO SCALE POSTS SHALL HAVE A MINIMUM LENGTH OF 36 INCHES PLUS BURIAL DEPTH. POST MATERIAL SHALL BE WOOD, STEEL, OR SYNTHETIC, AND SHALL BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE DURING INSTALLATION AND TO SUPPORT APPLIED LOADS. FABRIC SHALL BE A WOVEN GEOTEXTILE FABRIC CONSISTING OF STRONG, ROT RESISTANT, MATERIALS RESISTANT TO DETERIORATION FROM ULTRAVIOLET AND HEAT EXPOSURE. MINIMUM 6' FABRIC BURY REQUIRED. SILT FENCE INSTALLATION REQUIREMENT$ SITE PREPARATION 1. PLAN FOR THE FENCE TO BE AT LEAST 10 ft. FROM THE TOE OF THE SLOPE TO PROVIDE A SEDIMENT STORAGE AREA. 2. PROVIDE ACCESS TO THE AREA IF SEDIMENT CLEANOUT WILL BE NEEDED. OUTLET CONSTRUCTION (OPTIONAL) 1. DETERMINE THE APPROPRIATE LOCATION FOR A REINFORCED, STABILIZED BYPASS FLOW OUTLET (UNLESS THE FENCE IS DESIGNED TO RETAIN ALL RUNOFF FROM A 2 YEAR FREQUENCY, 24 HR DURATION STORM EVENT) 2. SET THE OUTLET ELEVATION SO THAT WATER DEPTH CANNOT EXCEED 1%229 ft. AT THE LOWEST POINT ALONG THE FENCE LINE. 3. LOCATE THE OUTLET WEIR SUPPORT POSTS NO MORE THAN 4 ft. APART, AND INSTALL A HORIZONTAL BRACE BETWEEN THEM. (WEIR HEIGHT SHOULD BE NO MORE THAN 1 ft. DEEP, 5 ft. WIDE, AND F ft. LONG ON LEVEL GRADE. 4. EXCAVATE THE FOUNDATION FOR THE OUTLET SPLASH PAD TO MINIMUMS OF 1 ft. AND WATER DEPTH NO MORE THAN 1 ft. ANYWHERE ELSE ALONG THE FENCE.) 5. FILL THE EXCAVATED FOUNDATION WITH INDOT CA NO. 1 STONE, BEING CAREFUL THAT THE FINISHED SURFACE BLENDS WITH THE SURROUNDING AREA, ALLOWING NO OVERFILL. 6. STABILIZE THE AREA AROUND THE PAD. FENCE CONSTRUCTION 1. ALONG THE ENTIRE INTENDED FENCE LINE, DIG AN 8 in. DEEP FLAT BOTTOMED OR V- SHAPED TRENCH. 2. ON THE DOWNSIDE SLOPE OF THE TRENCH, DRIVE THE WOOD OR STEEL SUPPORT POSTS AT LEAST 1 ft. INTO THE GROUND (THE DEEPER THE BETTER!), SPACING THEM NO MORE THAN 8 ft. APART IF THE FENCE IS SUPPORTED BY WIRE OR 6 ft. IF EXTRA STRENGTH FABRIC IS USED WITHOUT SUPPORT WIRE. ADJUST SPACING, IF NECESSARY, TO ENSURE THAT POSTS ARE SET AT THE LOW POINTS ALONG THE FENCE LINE. (NOTE: IF THE FENCE HAS PRE ATTACHED POSTS OR STAKES, DRIVE THEM DEEP ENOUGH SO THE FABRIC IS SATISFACTORILY IN THE TRENCH AS DESCRIBED IN STEP 6). 3. FASTEN SUPPORT WIRE FENCE (IF THE MANUFACTURER RECOMMENDS ITS USE) TO THE UPSLOPE SIDE OF THE POSTS, EXTENDING IT 8 in. INTO THE TRENCH. 4. RUN A CONTINUOUS LENGTH OF GEOTEXTILE FABRIC IN FRONT UPSLOPE) OF THE SUPPORT WIRE AND POSTS, AVOIDING JOINTS, PARTICULARLY AT LOW POINTS IN THE FENCE LINE. 5. IF A JOINT IS NECESSARY, NAIL THE OVERLAP TO THE NEAREST POST WITH LATH. 6. PLACE THE BOTTOM 1 ft. OF FABRIC IN THE 8 in. DEEP TRENCH, EXTENDING THE REMAINING 4 in. TOWARD THE UPSLOPE SIDE. 7. BACKFILL THE TRENCH WITH COMPACTED EARTH OR GRAVEL. NOTE: IF USING A PRE- PACKED COMMERCIAL SILT FENCE RATHER THAN CONSTRUCTING ONE, FOLLOW MANUFACTURER'S INSTALLATION INSTRUCTIONS. SILT FENCE MAINTENANCE REQUIREMENTS 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. MAINTENANCE REQUIREMENTS FOR EROSION CONTROL MEASURES TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS 1. INSPECT ENTRANCE PAD AND SEDIMENT AREA WEEKLY AND AFTER STORM EVENTS OF HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOP DRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT ROCK TRAP OR BASIN. 5. REPAIR ANY BROKEN PAVEMENT IMMEDIATELY. EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS 1. DURING VEGETATIVE ESTABLISHMENT INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT CHECK THE TREATED AREA PERIODICALLY. RIPRAP MAINTENANCE REQUIREMENTS 1. INSPECT PERIODICALLY FOR DISPLACED ROCK MATERIAL, SLUMPING, AND EROSION AT EDGES, ESPECIALLY DOWNSTREAM OR DOWNSLOPE. SILT FENCE MAINTENANCE REQUIREMENTS 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. SIDE DITCH MAINTENANCE REQUIREMENTS 1. INSPECT SIDE DITCHES FOLLOWING STORM EVENTS DURING AND AFTER VEGETATIVE ESTABLISHMENT; MAKE NEEDED REPAIRS IMMEDIATELY. 2. CHECK DITCH OUTLET AND ROAD CROSSINGS FOR BLOCKAGE, SEDIMENT, BANK INSTABILITY AND PIPING OR SCOUR HOLES; REMOVE ANY BLOCKAGE, AND MAKE PIPING REPAIRS IMMEDIATELY. 3. REMOVE SIGNIFICANT SEDIMENT AND DEBRIS FROM THE CHANNEL TO MAINTAIN DESIGN CROSS SECTION AND GRADE AND TO PREVENT SPOT EROSION. 4. TEMPORARY ROCK CHECK DAMS SHALL BE CONSTRUCTED TO CONTROL EROSION IF VEGETATION CANNOT BE ESTABLISHED DUE TO WEATHER OR OTHER UNFORESEEN CONDITIONS. TEMPORARY ROCK CHECK DAMS, IF REQUIRED SHALL BE REMOVED ONLY WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. GRASS LINED CHANNEL MAINTENANCE REQUIREMENTS 1. INSPECT THE CHANNEL FOLLOWING STORM EVENTS DURING AND EVEN AFTER VEGETATION ESTABLISHMENT; MAKE NEEDED REPAIRS IMMEDIATELY. 2. CHECK THE CHANNEL OUTLET AND ROAD CROSSINGS FOR BLOCKAGE, SEDIMENT, BANK INSTABILITY, AND PIPING OR SCOUR HOLES; REMOVE ANY BLOCKAGE AND MAKE REPAIRS IMMEDIATELY. 3. REMOVE SIGNIFICANT SEDIMENT AND DEBRIS FROM THE CHANNEL TO MAINTAIN CROSS SECTION AND GRADE AND TO PREVENT SPOT EROSION. TEMPORARY SEDIMENT TRAP 1. INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS. 2. CHECK ENBANKMENT FOR EROSION AT PIPING HOLES, REPAIR IMMEDIATELY. 3. CHECK POOL AREA SIDE SLOPES FOR EROSION, REPAIR IMMEDIATELY. 4. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE HALF OF VOLUME. 5. PROMPTLY REPLACE ANY DISPLACED RIPRAP, BEING CAREFUL THAT NO STONES IN SPILLWAY ARE ABOVE DESIGN GRADE. 6. REPLACE SPILLWAY AGGREGATE FACING IF THE SEDIMENT POOL DOES NOT DRAIN WITHIN 48 TO 72 HOURS FOLLOWING A STORMWATER RUNOFF EVENT. SANDBAG 10 MIL PLASTIC LINING LINING SECTION A -A LATH FLAGGING ON ALL SIDES CI CIS C:I I1 v v v L n 10' MIN. I A ll 10 MIL PLASTIC CONCRETE TRUCK WASH OUT DETAIL NOT TO SCALE SANDBAG 1. LOCATE WASH OUT AREA AT LEAST 50 FEET FROM STORM DRAINS, OPEN DITCHES, OR BODIES OF WATER. DO NOT ALLOW RUNOFF FROM THIS AREA BY CONSTRUCTING A TEMPORARY PIT OR BERMED AREA LARGE ENOUGH FOR LIQUID AND SOLID WASTE. 2. TEMPORARY WASH OUT FACILITIES SHOULD HAVE A TEMPORARY PIT AREA OF SUFFICIENT VOLUME TO COMPLETELY CONTAIN ALL LIQUID AND SOLID WASTE CONCRETE MATERIALS GENERATED DURING WASH OUT PROCEDURES. 3. ONLY CONCRETE FROM MIXER TRUCK CHUTES SHOULD BE WASHED INTO WASH OUT PIT. 4. PLASTIC LINING MATERIAL SHOULD BE A MINIMUM OF 10 MIL POLYETHYLENE SHEETING AND SHOULD BE FREE OF HOLES, TEARS, OR OTHER DEFECTS THAT COMPROMISE THE IMPERMEABILITY OF THE MATERIAL. 5. THE CONCRETE WASHOUT AREA SHALL BE INSPECTED DAILY FOR PUNCTURES OR TEARS IN THE PLASTIC LINER. THE LINER SHALL BE REPLACED UPON REMOVAL OF HARDENED CONCRETE. 6. TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD BE MAINTAINED TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM FREEBOARD OF 12 INCHES FOR BELOW GRADE FACILITIES. MAINTAINING TEMPORARY CONCRETE WASH OUT FACILITIES SHOULD INCLUDE REMOVING AND DISPOSING OF HARDENED CONCRETE AND RETURNING THE FACILITY TO A FUNCTIONAL CONDITION. HARDENED CONCRETE MATERIALS SHOULD BE REMOVED AND DISPOSED OF. IN ACCORDANCE WITH LOCAL STANDARDS. 7. CONCRETE WASHOUT AREAS SHALL BE CLEARLY MARKED WITH LAN FLAGGING AND A SIGN POSTED AND LABELED "CONCRETE WASHOUT". LATH AND FLAGGING SHOULD BE COMMERCIAL TYPE. S. THE CONCRETE WASH OUT AREA SHALL BE REPAIRED AND /OR ENLARGED AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE. 9. WASHOUT FACILITIES MUST BE CLEANED, OR NEW FACILITIES MUST BE CONSTRUCTED AND READY FOR USE ONCE THE WASHOUT IS 75% FULL. 10. AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE AND LEGALLY DISPOSED OF AT AN APPROVED SITE EROSIOU AND SEDIMENT CONTROL CONSTRUCTION SEQUENCE 1. A pre- construction meeting should be scheduled with the City of Carmel Engineering Department at least 48 hours prior to construction commencement. 2. Install construction entrance. 3. Utilize the gravel construction entrance for installation of the perimeter silt fence. Add stone if needed. Post the NOI at the entrance. Add protection measures to existing inlets. 4. Install staging area, fueling station, material storage area and concrete truck washout. 5. Strip the top soil and grade. 6. Complete the cut and fills on the site. Final grade and seed the pond slopes. Install check dams or stabilize the slopes with erosion control blankets. 7. Areas left dormant for more than 15 days, must be temporarily seeded. 8. Install storm sewer and other utilities. Provide inlet protection immediately upon completion of the inlets. Final grade and stabilize slopes when inlets are functioning. 9. Seed the perimeter of the site. 10. Start Building Construction. 11. Complete utility installation, curbs, paving and building construction. 12. Install landscaping plant material and stabilize all disturbed areas. 13. Remove all erosion and sediment control practices when areas have a uniform grass cover. 10 i1 300 275 250 225 200 175 SLOPE LENGTH 150 FT. 125 100 75 50 25 3 O A 3' X X in 1 STAPLE PER SQ. YD. 1 STAPLES PER SQ. YD. GENERAL STAPLE RECOMMENDATIONS B A C B A c B c B C 4:1 3:1 2:1 SLOPE GRADIENT °0 o c.� 0.0° 0 n b O 0 O o O °n'°0 o 000000 0 0 O o'.o 1:1 CHANNEL LINING 50' MIN. a 6" MIN. INDOT GRADATION NO. 2 CRUSHED STONE NOTES: 3' EROSION CONTROL MAT INSTALLATION GUIDE DETAIL NOT TO SCALE GRAVEL CONSTRUCTION ENTRANCE NOT TO SCALE A KENTUCKY BLUEGRASS 100 LBS. /ACRE; CREEPING RED FESCUE 100 LBS. /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 20 LBS. /ACRE B KENTUCKY BLUEGRASS 120 LBS. /ACRE; CREEPING RED FESCUE 120 LBS. /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS. /ACRE C SPRING OATS 3 BUSHELS /ACRE D WHEAT OR RYE 2 BUSHELS /ACRE E ANNUAL RYEGRASS 40 LBS. /ACRE 1 LB /1000 SQ. FT. F SOD G STRAW MULCH 2 TONS /ACRE /I IRRIGATION NEEDED DURING JUNE, JULY, AUGUST AND /OR SEPTEMBER IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER SUPPLYING SOD C X x X X 2 STAPLES PER SQ. YD. ADDITIONAL STAPLES AS REQUIRED DUE TO DEPTH OF FLOW CHANNEL LININGS UTILIZE STAPLE PATTERN 'C' WITH ADDITIONAL STAPLES ON SIDE SLOPES AT PROJECTED WATER LINE. STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE RAINFALL. AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE BLANKETS, STAPLE PATTERN 'C' SHOULD BE UTILIZED. EROSION CONTROL BLANKET (SURFACE APPLIED) INSTALLATION REQUIREMENTS 1. SELECT THE TYPE AND WEIGHT OF EROSION CONTROL BLANKET TO FIT THE SITE CONDITIONS (e.g., SLOPE, CHANNEL FLOW VELOCITY). 2. INSTALL ANY PRACTICES NEEDED TO CONTROL EROSION AND RUNOFF, SUCH AS TEMPORARY OR PERMANENT DIVERSION, SEDIMENT BASIN OR TRAP, SILT FENCE, AND STRAW BALE DAM. 3. GRADE THE SITE AS SPECIFIED IN THE CONSTRUCTION PLAN. 4. ADD TOPSOIL WHERE APPROPRIATE. 5. PREPARE THE SEEDBED, FERTILIZE (AND LIME, IF NEEDED), AND SEED THE AREA IMMEDIATELY AFTER GRADING. 6. FOLLOWING MANUFACTURER'S DIRECTIONS, LAY THE BLANKETS ON THE SEEDED AREA SUCH THAT THEY ARE IN CONTINUOUS CONTACT WITH THE SOIL AND THAT THE UPSLOPE OR UPSTREAM ONES OVERLAP THE LOWER ONES BY AT LEAST 8 in. 7. TUCK THE UPPERMOST EDGE OF THE UPPER BLANKETS INTO A CHECK SLOT (SILT TRENCH), BACKFILL WITH SOIL, AND TAMP DOWN. 8. ANCHOR THE BLANKETS AS SPECIFIED BY THE MANUFACTURER. THIS TYPICALLY INVOLVES DRIVING 6 -8 in. METAL STAPLES INTO THE GROUND IN A PATTERN DETERMINED BY THE SITE CONDITIONS. EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS 1. DURING VEGETATIVE ESTABLISHMENT INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT CHECK THE TREATED AREA PERIODICALLY. °a 0 Q o o o o o a Q•o Yooci •o o Q• .nnO :0!).0000 a o o Q coo o o o 4 �b p p o Q O o Q. o �o TEMPORARY GRAVEL CONSTRUCTION ENTRANCE INSTALLATION REQUIREMENTS 1. AVOID LOCATING ON STEEP SLOPES OR AT CURVES IN PUBLIC ROADS. 2. REMOVE ALL VEGETATION AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA, AND GRADE AND CROWN FOR POSITIVE DRAINAGE. 3. IF SLOPE TOWARDS THE ROAD EXCEEDS 2%, CONSTRUCT A 6 -8 in. HIGH WATER BAR (RIDGE) WITH 3:1 SIDE SLOPES ACROSS THE FOUNDATION AREA ABOUT 15 ft. FROM THE ENTRANCE TO DIVERT RUNOFF AWAY FROM THE ROAD. 4. INSTALL PIPE UNDER THE PAD IF NEEDED TO MAINTAIN PROPER PUBLIC ROAD DRAINAGE. 5. IF WET CONDITIONS ARE ANTICIPATED, PLACE GEOTEXTILE FABRIC ON THE GRADED FOUNDATION TO IMPROVE STABILITY. 6. PLACE STONE TO DIMENSIONS AND GRADE SHOWN IN THE EROSION /SEDIMENT CONTROL PLAN, LEAVING THE SURFACE SMOOTH AND SLOPED FOR DRAINAGE. 7. DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE STONE PAD TO A SEDIMENT TRAP OR BASIN. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS 1. INSPECT ENTRANCE PAD AND SEDIMENT AREA WEEKLY AND AFTER STORM EVENTS OF HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOP DRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT ROCK TRAP OR BASIN. 5. REPAIR ANY BROKEN PAVEMENT IMMEDIATELY. 0 N 0 STRUCTUREPOINT III BROWNING INVESTMENTS INC. 6100 W. 96TH STREET SUITE 250 INDIANAPOLIS, IN 46278 INDIANA SPINE GROUP MERIDIAN MAIN CARMEL, INDIANA CONSULTANTS DATE. 4 O DRAWN BY. CHECKED BY. ISSUED FOR. 7260 SHADELAND STATION INDIANAPOLIS, IN 46256 -3957 TEL 317.547.5580 FAX 317.543.0270 www.structurepoint.com ,•`4 J 10708270 o' STATE OF /4 V 4/1 "liolunitio 0 PROJECT 02009.00531 C5.2 0622.09 EEM TMJ DATE. STORM WATER POLLUTION PREVENTION DETAILS