Loading...
HomeMy WebLinkAboutA701 Kitchen Equipment PlanNORTH IIIIIIIIIIIIIIII I IIIIIIII IIIIII I PANELIZED REFRIDGERATED COOLER UNIT TO BE SUPPLIED COMPLETE. ANY MODIFICATIONS TO THE EXISTING STRUCTURE TO ACCOMODATE THIS UNIT ARE TO BE SUB CONTRACTED BY THE FOOD SERVICE EQUIPMENT CONTRACTOR. FLIP UP COUNTER \\1\ Kitchen Equipment Plan 1 4 1 0 Kitchen Equipment Key n 4 U 10 m 115 16 17 D 19 20 21 22 24 25 26 POT SINK ADVANCE TABCO FC -3- 1818 -24RL OR EQUAL HAND SINK ADVANCE TABCO 7 -PS -68 OR EQUAL MOP SINK W/ CUSTOM MOP HOLDER REACH -IN FREEZER TRUE T -23F OR EQUAL FRYER ANETS SILVERLINE 14" GAS FRYER MODELSLG40 OR EQUAL 6 BURNER RANGE W/ OVEN SOUTHBEND 336D/336D -1G RESTAURANT RANGE OR EQUAL GRIDDLE ON STAND STAR -MAX 636MD WITH STAND OR EQUAL EXHAUST HOOD W/ FIRE SYSTEM CONVECTION OVEN SOUTHBEND SLGS /12SC OR EQUAL REACH -IN REFRIGERATOR TRUE T -72 OR EQUAL REACH -IN FREEZER TRUE T -49F OR EQUAL SUM JIM WORK TABLE ADVANCE TABCO SUPER SAVER SERIES OR EQUTAL HOT FOOD TABLE RANDELL 3613 OR EQUAL ICE MAKER W/ BIN ICE -O -MATIC ICE0500 OR EQUAL BACK BAR COOLER WAITRESS STATION LIQUOR DISPLAY STEPS CHALLENGER CRUZ -36 OR EQUAL BAR SINK CHALLENGER CRB -64 OR EQUAL ICE CHEST W/ BUILT -IN COLD PLATE CHALLENGER CRI- 16 -36 -7 OR EQUAL BLENDER STATION CHALLENGER CR -RS -15 OR EQUAL BACK BAR REFRIGERATOR GLASTENDER BB60 OR EQUAL BOTTLE COOLER TRUE 1D -95 -38 OR EQUAL FILLERS DRAIN BOARDS CHALLENGER CRD -42 OR EQUAL HAND SINK W/ SOAP TOWEL DISPENSER CHALLENGER SC- 15 -TS -S OR EQUAL VEGETABLE SINK c8 Carmel Redevelopment Commission 111 West Main Street Cannel, Indiana 46032 317.571 -2787 (ARTS) c c E Scope Drawings: These drawings indicate the general scope of the project H terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. Revisions: Issue Date 1/21/09 Drawn By D.M.C. Checked By B.D.B. Drawing Title: itchen Equipment Pln Certified By: Drawing Number: A701 Project Number: 28133