Kitchen Equipment Plan
1 4 1 0
Kitchen Equipment Key
n
4
U
10
m
115
16
17
D
19
20
21
22
24
25
26
POT SINK ADVANCE TABCO FC -3- 1818 -24RL OR EQUAL
HAND SINK ADVANCE TABCO 7 -PS -68 OR EQUAL
MOP SINK W/ CUSTOM MOP HOLDER
REACH -IN FREEZER TRUE T -23F OR EQUAL
FRYER ANETS SILVERLINE 14" GAS FRYER MODELSLG40 OR EQUAL
6 BURNER RANGE W/ OVEN SOUTHBEND 336D/336D -1G RESTAURANT RANGE OR EQUAL
GRIDDLE ON STAND STAR -MAX 636MD WITH STAND OR EQUAL
EXHAUST HOOD W/ FIRE SYSTEM
CONVECTION OVEN SOUTHBEND SLGS /12SC OR EQUAL
REACH -IN REFRIGERATOR TRUE T -72 OR EQUAL
REACH -IN FREEZER TRUE T -49F OR EQUAL
SUM JIM
WORK TABLE ADVANCE TABCO SUPER SAVER SERIES OR EQUTAL
HOT FOOD TABLE RANDELL 3613 OR EQUAL
ICE MAKER W/ BIN ICE -O -MATIC ICE0500 OR EQUAL
BACK BAR COOLER
WAITRESS STATION
LIQUOR DISPLAY STEPS CHALLENGER CRUZ -36 OR EQUAL
BAR SINK CHALLENGER CRB -64 OR EQUAL
ICE CHEST W/ BUILT -IN COLD PLATE CHALLENGER CRI- 16 -36 -7 OR EQUAL
BLENDER STATION CHALLENGER CR -RS -15 OR EQUAL
BACK BAR REFRIGERATOR GLASTENDER BB60 OR EQUAL
BOTTLE COOLER TRUE 1D -95 -38 OR EQUAL
FILLERS DRAIN BOARDS CHALLENGER CRD -42 OR EQUAL
HAND SINK W/ SOAP TOWEL DISPENSER CHALLENGER SC- 15 -TS -S OR EQUAL
VEGETABLE SINK
c8
Carmel
Redevelopment Commission
111 West Main Street
Cannel, Indiana 46032
317.571 -2787 (ARTS)
c
c
E
Scope Drawings:
These drawings indicate the general scope of the project
H terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
Revisions:
Issue Date
1/21/09
Drawn By
D.M.C.
Checked By
B.D.B.
Drawing Title:
itchen
Equipment
Pln
Certified By:
Drawing Number:
A701
Project Number:
28133