HomeMy WebLinkAboutE100 Electrical Site Lighting & PowerGENERAL NOTES
A. DRAWINGS ARE DIAGRAMMATIC. ALL DIMENSIONS SHOWN ARE
APPROXIMATE. ALL LOCATIONS SHALL BE FIELD VERIFIED.
B. ALL WORK SHALL BE IN CONFORMANCE WITH THE NATIONAL
ELECTRICAL CODE LATEST EDITION ADOPTED BY INDIANA, THE
INDIANA ELECTRICAL CODE AMENDMENTS, LOCAL /MUNICIPAL CODES,
AND THE AUTHORITY HAVING JURISDICTION.
C. ALL CONNECTIONS TO EQUIPMENT SUBJECT TO MOVEMENT OR
VIBRATION SHALL BE LIQUID TIGHT FLEXIBLE METAL CONDUIT, NOT
LESS THAN 12" IN LENGTH, NOR GREATER THAN 36" IN LENGTH.
D. ALL CONDUIT PENETRATIONS SHALL BE SEALED WITH APPROPRIATE
CONDUIT SEALING MATERIAL.
E. ALL CABLE SIZES SHALL UTILIZE COPPER CONDUCTORS.
F. FIELD VERIFY LOCATIONS OF BUILDING EXPANSION JOINTS WHEN
ROUTING CONDUIT. ALL CONDUITS CROSSING EXPANSION JOINTS
SHALL BE INSTALLED WITH EXPANSION FITTINGS. EXPANSION FITTINGS
SHALL BE INSTALLED IN ACCORDANCE WITH THE NEC, AND
MANUFACTURER'S WRITTEN RECOMMENDATIONS.
I. HOME RUNS SHALL NOT BE COMBINED IN A RACEWAY UNLESS SHOWN
ON THE CONTRACT DRAWINGS. SINGLE PHASE BRANCH CIRCUIT HOME
RUNS MAY BE COMBINED AT THE CONTRACTOR'S DISCRETION NOT
GREATER THAN (3) PHASE CONDUCTORS, (3) NEUTRAL CONDUCTORS,
AND A GROUNDING CONDUCTOR.
EACH SINGLE PHASE BRANCH CONDUCTOR SHALL HAVE A DEDICATED
NEUTRAL BACK TO THE PANEL.
CONDUITS 2" AND LARGER THAT PENETRATE EXTERIOR WALLS SHALL
USE LINK SEALS.
WHERE LOW VOLTAGE (CONTROL) CABLING IS ALLOWED TO BE
INSTALLED WITHOUT A RACEWAY, IT SHALL BE SUPPORTED NOT
EXCEEDING INTERVALS OF 48 INCHES, AND NOT MORE THAN 6 INCHES
FROM CABINETS, BOXES, FITTINGS, OUTLETS, RACKS, FRAMES AND
TERMINALS.
M. ALL SITE WIRING FOR LIGHTING FIXTURES SHALL BE IN CONDUIT, SIZE
#10 AWG MINIMUM.
N. COORDINATE INSTALLATION OF PRIMARY CONDUIT WITH DUKE ENERGY
PRIOR TO CONSTRUCTION.
J.
K.
L.
0 SHEET KEYNOTES
NEW DUKE ENERGY 400A, 240 120V, SINGLE PHASE METER.
2. PROVIDE NEW POLE MOUNTED LIGHTING LITHONIA
DM19AS2 -250M -SR5S- 120- SPA -SF WITH LITHONIA POLE
STS- 20 -5 -5F OR APPROVED EQUIVALENT.
3. PROVIDE NEW POLE MOUNTED LIGHTING LITHONIA
DM28AS2 -250M -SR5S- 120 SPA -SF WITH LITHONIA POLE
STS- 20 -5 -5F OR APPROVED EQUIVALENT.
4. PROVIDE NEW FLAG LIGHTING LITHONIA 7000 -70M- 120 -YM -BL OR
APPROVED EQUIVALENT.
5. PROVIDE 6 POLE, NEMA -1 RATED, MAGNETICALLY HELD CONTACTOR
WITH REMOTE PHOTOCELL. MOUNT THE CONTACTOR INSIDE MECHANICAL
ROOM. ALL PARKING, FLAG AND PERIMETER LIGHTINGS SHALL BE
CONTROLLED FROM THIS DEVICE.
6. STUB 1" CONDUIT FROM POLE BASE AND CAP FOR FUTURE PARKING
LOT LIGHTING.
SCALE: 1/16" 1' -0"
TURN UP AT
SERVICE POLE
0
r
4" SCHEDULE 80 PVC
4
CONDUIT FOR DUKE
ENERGY PRIMARY
4'
8'
16'
ELECTRICAL SITE LIGHTING AND POWER PLAN
Carmel
Redevelopment Commission
111 West Main Street
Carmel, Indiana 46032
317.571 -2787 (ARTS)
RS
C
C
G)
E
to
0
Scope Drawings:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
Revisions:
Issue Data
01/20/09
Drawn By
KIA
Checked By
BKS
Drawing Title:
ELECTRICAL
SITE LIGHTING
AND POWER
PLANS
Certified By
e �vaemeen RS !�v
mss..
a
fidk /ON Ai.
/3 7 1' 111
PE19700197
ms m
STATE OF
tr
77
L'Acquis Project Number:
08109