Loading...
HomeMy WebLinkAboutP200 Plumbing Under SlabEX GOO SCALE: 1 /8" 1' -0" EX 2 "Wfi SHEET KEYNOTES -DEMO 1. REMOVE EXISTING BABTISTY DRAIN AND PIPING COMPLETELY. 2. SAW CUT FLOOR, REMOVE EXISTING 2" WASTE PIPING AND PREPARE FOR NEW 4" INSTALLATION. 3. REMOVE PIPING COMPLETELY. PLUMBING UNDER SLAB DEMOLITION PLAN 0 N.T.S. 4' 8' 16' EX 4 "VTR 4 "FD -1 EX TOILETS SANITARY WASTE AND VENT ISO EX GOO 3 "FD -1 FCO PLUMBING UNDER SLAB PLAN SCALE: Custom 0 4' 8' 16' SHEET KEYNOTES 1. SAW CUT FLOOR, ADD PIPING AS SHOWN, PATCH CONCRETE TO MATCH EXISTING SURROUNDING SURFACES. 2. CONNECT TO EXISTING AT THIS POINT. 3. 4" WASTE FROM ABOVE. 4. 2" VENT UP. 5. 2" WASTE FROM ABOVE. 6. 3" WASTE WITH DEEP SEAL P —TRAP FROM ABOVE. 7. 2" WASTE UP TO FCO. 8. 4" FIRE AND 1" DOMESTIC WATER SERVICE UP. 9. 3" WASTE FROM ABOVE. 10. 4" WASTE DOWN W /DEEP SEAL P —TRAP FROM FLOOR DRAIN ABOVE. 11. 3/4" HOT AND COLD WATER FROM ABOVE. 12. 3/4" HOT AND COLD WATER UP. 13. 3/4" HOT AND COLD WATER UP, 2" ISLAND WASTE AND VENT FROM ABOVE. 14. 3/4" COLD WATER UP. 00 \.t;\ N w H w cr N W 4 0 v Z El Z Q1 L x U z V) w o E--+ N Z Wan o 1.4 ,i °m Carmel Redevelopment Commission 111 West Main Street Carmel, Indiana 46032 317.571 -2787 (ARTS) C co a) E co U Scope Drawings: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. Revisions: Issue Date 01/20/09 Drawn By JJR Checked By JJR Drawing Title: PLUMBING UNDER SLAB PLANS L'Acqule Project Number: 08109