HomeMy WebLinkAboutP200 Plumbing Under SlabEX GOO
SCALE: 1 /8" 1' -0"
EX 2 "Wfi
SHEET KEYNOTES -DEMO
1. REMOVE EXISTING BABTISTY DRAIN AND PIPING COMPLETELY.
2. SAW CUT FLOOR, REMOVE EXISTING 2" WASTE PIPING AND PREPARE FOR NEW 4"
INSTALLATION.
3. REMOVE PIPING COMPLETELY.
PLUMBING UNDER SLAB DEMOLITION PLAN
0
N.T.S.
4'
8'
16'
EX 4 "VTR 4 "FD -1
EX TOILETS
SANITARY WASTE AND VENT ISO
EX GOO
3 "FD -1
FCO
PLUMBING UNDER SLAB PLAN
SCALE: Custom
0
4'
8'
16'
SHEET KEYNOTES
1. SAW CUT FLOOR, ADD PIPING AS SHOWN, PATCH CONCRETE TO MATCH EXISTING
SURROUNDING SURFACES.
2. CONNECT TO EXISTING AT THIS POINT.
3. 4" WASTE FROM ABOVE.
4. 2" VENT UP.
5. 2" WASTE FROM ABOVE.
6. 3" WASTE WITH DEEP SEAL P —TRAP FROM ABOVE.
7. 2" WASTE UP TO FCO.
8. 4" FIRE AND 1" DOMESTIC WATER SERVICE UP.
9. 3" WASTE FROM ABOVE.
10. 4" WASTE DOWN W /DEEP SEAL P —TRAP FROM FLOOR DRAIN ABOVE.
11. 3/4" HOT AND COLD WATER FROM ABOVE.
12. 3/4" HOT AND COLD WATER UP.
13. 3/4" HOT AND COLD WATER UP, 2" ISLAND WASTE AND VENT FROM ABOVE.
14. 3/4" COLD WATER UP.
00
\.t;\ N
w
H
w cr N
W 4 0
v
Z El Z
Q1 L
x
U z V) w
o
E--+ N
Z Wan
o
1.4 ,i
°m
Carmel
Redevelopment Commission
111 West Main Street
Carmel, Indiana 46032
317.571 -2787 (ARTS)
C
co
a)
E
co
U
Scope Drawings:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
Revisions:
Issue Date
01/20/09
Drawn By
JJR
Checked By
JJR
Drawing Title:
PLUMBING
UNDER
SLAB
PLANS
L'Acqule Project Number:
08109