Loading...
HomeMy WebLinkAboutP201 Plumbing First Floor PlansSHEET KEYNOTES DEMO 1. EXISTING WATER SOFTENER TO REMAIN. 2. REMOVE EXISTING WATER WELL BLADDER TANK COMPLETELY, CAP OFF EXISTING WELL SUPPLY LINE, PREPARE EXISTING 3 /4 "CW DISCHARGE LINE FOR NEW CITY WATER CONNECTION. 3. REMOVE EXISTING WATER HEATER AND TURN OVER TO OWNER, PREPARE SUPPLY AND DISCHARGE PIPING FOR CONNECTION TO NEW WATER HEATER. 4. REMOVE EXISTING SUPPLY, WASTE, AND FILTRATION EQUIPMENT ASSOCIATED WITH BAPTISTERY. 5. EXISTING GAS METER TO BE REMOVED BY VECTREN ENERGY. PLUMBING CONTRACTOR TO REMOVE GAS PIPING DOWNSTREAM OF METER TO A POINT WITHIN ATTIC AND PREPARE FOR NEW CONNECTION. 6. REMOVE EXISTING WALL HYDRANT AND ASSOCIATED PIPING COMPLETELY. 7. REMOVE EXISTING ELECTRIC WATER COOLER AND ASSOCIATED PIPING COMPLETELY. 8. DISCONNECT GAS SERVICE FROM EXISTING WATER HEATER AND (2) EXISTING FURNACES, REMOVE PIPING TO A POINT WITHIN ATTIC AND CAP. 9. REMOVE EXISTING PLUMBING FIXTURE COMPLETE. REMOVE ALL PIPING TO A POINT WITHIN WALL AND CAP OR PLUG. SCALE: 1/8" 1' -0" PLUMBING FIRST FLOOR DEMOLITION PLAN 4- 0 4' 8' 16' SCALE: SCALE: Custom RCP -1 EXT -1 DWH -1 0 4' 8' PLUMBING FIRST FLOOR AND ATTIC PLAN fi' 16' SHEET KEYNOTES 4" FIRE SERVICE FROM BELOW. ENTIRE BUILDING, INCLUDING ATTIC TO BE SPRINKLED WITH DRY SYSTEM PER SPECIFICATIONS. 2. ALL DOMESTIC WATER PIPING TO BE ROUTED THROUGH ATTIC, PIPING SHALL BE INSULATED PER SPECIFICATIONS AND INSTALLED BELOW EXISTING ATTIC INSULATION BLANKET TO PREVENT FREEZING. 3. 1" DOMESTIC WATER SERVICE FROM BELOW, SEE SITE /CIVIL PLANS FOR WATER METER LOCATION. 4. CONNECT NEW 3/4" COLD WATER SERVICE TO EXISTING 3/4" BLADDER TANK DISCHARGE TO RE -FEED BUILDING WITH NEW CITY WATER SERVICE. 5. CONNECT NEW WATER HEATER TO EXISTING COLD AND HOT WATER SERVICE TO RE -FEED EXISTING. 6. 3/4 "HOT AND COLD WATER DOWN, 2" WASTE DOWN, 1 1/2" VENT UP. 7. ALL VENT PIPING TO BE ROUTED WITHIN ATTIC SPACE, CONNECT TO EXISTING VENT THRU ROOF. 8. 1 1 /2" SOLENOID VALVE PROVIDED AND INSTALLED BY P.C., WIRING TO EXHAUST HOOD FIRE SUPPRESSION SYSTEM BY HOOD SUPPLIER. VALVE SHALL BE CAPABLE OF PASSING 455,000 BTUH, AND SHALL BE MANUAL RESET TYPE, EQUAL TO ASCO 8044 SERIES. 9. FIRE PROTECTION CONTRACTOR TO PROVIDE AND INSTALL POST INDICATOR VALVE WITH TAMPER SWITCH. 10. NEW GAS METER /SERVICE BY VECTREN ENERGY, PLUMBING CONTRACT TO START DOWN STREAM SIDE OF METER, TOTAL CONNECTED LOAD 1,154,000 BTUH 6" W.C.. 11. HOT WATER RETURN BALANCING STATION SET AT 0.5 GPM. 12. 3/4" CW DOWN TO NON- FREEZE WALL HYDRANT. 13. CONNECT TO EXISTING GAS SERVICE AT THIS POINT. 14. SEE 1/P501 FOR HOT WATER HEATER PIPING DIAGRAM. 15. 4" VENT THRU ROOF. 16. 3/4" COLD WATER DOWN, 4" WASTE DOWN, 2" VENT UP. 17. EXTEND INDIRECT WASTE FROM ICE CHEST TO FLOOR SINK. 18. EXTEND 3/4" HOT AND COLD WATER AND FINAL CONNECT TO BLENDER STATION, EXTEND INDIRECT WASTE TO FLOOR SINK. 19. EXTEND 3/4" HOT AND COLD WATER AND FINAL CONNECT TO FILLER /DRAIN BOARD, EXTEND INDIRECT WASTE TO FLOOR SINK. 20. 3/4" HOT AND COLD WATER FROM BELOW, 2" ISLAND WASTE AND VENT, EXTEND AND FINAL CONNECT TO HAND SINK. 21. 3/4" COLD WATER FROM BELOW, EXTEND THROUGH FSEC PROVIDED WATER FILTER AND FINAL CONNECT TO ICE MACHINE, EXTEND INDIRECT WASTE TO FUNNEL FLOOR DRAIN. 22. 2" VENT FROM BELOW. 23. EXTEND INDIRECT WASTE FROM HOT FOOD TABLE TO FUNNEL FLOOR DRAIN. 24. 3/4" HOT AND COLD WATER DOWN. 25. 1 1/2" GAS DOWN, EXTEND HEADER FULL SIZE AND FINAL CONNECT TO EACH APPLIANCE. PROVIDE SHUT -OFF VALVE AND DRIP -LEG AT EACH CONNECTION. FLEXIBLE GAS CONNECTOR PROVIDED BY FSEC, INSTALLED BY PC. 26. 3/4" HOT AND COLD WATER DOWN, 2" WASTE DOWN, 1 1/2" VENT UP. EXTEND AND FINAL CONNECT TO 4 -COMP SINK AND HAND SINK. 27. 3/4" HOT AND COLD WATER DOWN, 3" WASTE DOWN, 2" VENT UP. EXTEND AND FINAL CONNECT TO MOP BASIN. 28. 3/4" HOT AND COLD WATER DOWN TO 3 -COMP SINK, EXTEND 3" WASTE HEADER FROM EACH SINK THRU FLOW CONTROL VALVE AND GI -1. 29. 3" WASTE DOWN, 2" VENT UP. 30. 1" GAS PIPING DOWN EXTEND AND FINAL CONNECT TO HVAC EQUIPMENT, PROVIDE SHUT -OFF VALVE AND DIRT LEG AT EQUIPMENT. 31. 1 1/4" GAS PIPING DOWN EXTEND AND FINAL CONNECT TO WATER HEATER, PROVIDE SHUT -OFF VALVE AND DIRT LEG AT EQUIPMENT. NATURAL GAS UTILITY DATA MECHANICAL EQUIPMENT DOMESTIC WATER HEATER NO.1 FURNACE NO. 1 FURNACE NO. 2 FURNACE NO. 3 FURNACE NO. 4 KITCHEN EQUIPMENT 6 BURNER RANGE W /OVEN FRYER GRIDDLE CONVECTION OVEN TOTAL GAS LOAD 199,000 BTUH 125,000 BTUH 125,000 BTUH 125,000 BTUH 125,000 BTUH 215,000 BTUH 105,000 BTUH 95,000 BTUH 40,000 BTUH 1,154,000 BTUH (4 6" W.C. PRESSURE FSEC EQUIPMENT CONNECTION: UNLESS NOTED OTHERWISE, ALL FOOD SERVICE EQUIPMENT AND PLUMBING FIXTURES WITHIN PANTRY, KITCHEN, AND BAR ARE PROVIDED BY FSEC AND INSTALLED BY THE PLUMBING CONTRACTOR. PLUMBING CONTRACTOR SHALL SUPPLY ALL TRIM (FITTINGS, VALVES, ETC) NEEDED TO MAKE A COMPLETE AND OPERABLE SYSTEM. FIRE PROTECTION: ENTIRE BUILDING TO BE SPRINKLED WITH A DRY SYSTEM. ATTIC SHALL ALL SPACES BELOW CEILING TO BE TO ENSURE COMPLET SYSTEM DRAIN PER NFPA 13 AND SPECIFICATIONS BE PROTECTED WITH UPRIGHT HEADS, SPRINKLED WITH DRY PENDANT HEADS DOWN. ma z z z UH 4 1-4 o V Carmel Redevelopment Commission 111 West Main Street Carmel, Indiana 46032 317.571 -2787 (ARTS) 0 W 0 CC R3 C a) E U Scope Drawings: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. Revisions: Issue Date 01/20/09 Drawn By JJR Checked By JJ R Drawing Title: PLUMBING FIRST FLOOR PLANS L'Acquis Project Number: 08109