HomeMy WebLinkAboutP201 Plumbing First Floor PlansSHEET KEYNOTES DEMO
1. EXISTING WATER SOFTENER TO REMAIN.
2. REMOVE EXISTING WATER WELL BLADDER TANK COMPLETELY, CAP OFF EXISTING WELL
SUPPLY LINE, PREPARE EXISTING 3 /4 "CW DISCHARGE LINE FOR NEW CITY WATER
CONNECTION.
3. REMOVE EXISTING WATER HEATER AND TURN OVER TO OWNER, PREPARE SUPPLY AND
DISCHARGE PIPING FOR CONNECTION TO NEW WATER HEATER.
4. REMOVE EXISTING SUPPLY, WASTE, AND FILTRATION EQUIPMENT ASSOCIATED WITH
BAPTISTERY.
5. EXISTING GAS METER TO BE REMOVED BY VECTREN ENERGY. PLUMBING CONTRACTOR TO
REMOVE GAS PIPING DOWNSTREAM OF METER TO A POINT WITHIN ATTIC AND PREPARE
FOR NEW CONNECTION.
6. REMOVE EXISTING WALL HYDRANT AND ASSOCIATED PIPING COMPLETELY.
7. REMOVE EXISTING ELECTRIC WATER COOLER AND ASSOCIATED PIPING COMPLETELY.
8.
DISCONNECT GAS SERVICE FROM EXISTING WATER HEATER AND (2) EXISTING FURNACES,
REMOVE PIPING TO A POINT WITHIN ATTIC AND CAP.
9. REMOVE EXISTING PLUMBING FIXTURE COMPLETE. REMOVE ALL PIPING TO A POINT
WITHIN WALL AND CAP OR PLUG.
SCALE: 1/8" 1' -0"
PLUMBING FIRST FLOOR DEMOLITION PLAN 4-
0
4'
8'
16'
SCALE: SCALE: Custom
RCP -1
EXT -1
DWH -1
0
4'
8'
PLUMBING FIRST FLOOR AND ATTIC PLAN
fi'
16'
SHEET KEYNOTES
4" FIRE SERVICE FROM BELOW. ENTIRE BUILDING, INCLUDING ATTIC TO BE SPRINKLED
WITH DRY SYSTEM PER SPECIFICATIONS.
2. ALL DOMESTIC WATER PIPING TO BE ROUTED THROUGH ATTIC, PIPING SHALL BE
INSULATED PER SPECIFICATIONS AND INSTALLED BELOW EXISTING ATTIC INSULATION
BLANKET TO PREVENT FREEZING.
3. 1" DOMESTIC WATER SERVICE FROM BELOW, SEE SITE /CIVIL PLANS FOR WATER METER
LOCATION.
4. CONNECT NEW 3/4" COLD WATER SERVICE TO EXISTING 3/4" BLADDER TANK DISCHARGE
TO RE -FEED BUILDING WITH NEW CITY WATER SERVICE.
5. CONNECT NEW WATER HEATER TO EXISTING COLD AND HOT WATER SERVICE TO RE -FEED
EXISTING.
6. 3/4 "HOT AND COLD WATER DOWN, 2" WASTE DOWN, 1 1/2" VENT UP.
7. ALL VENT PIPING TO BE ROUTED WITHIN ATTIC SPACE, CONNECT TO EXISTING VENT THRU
ROOF.
8. 1 1 /2" SOLENOID VALVE PROVIDED AND INSTALLED BY P.C., WIRING TO EXHAUST HOOD
FIRE SUPPRESSION SYSTEM BY HOOD SUPPLIER. VALVE SHALL BE CAPABLE OF PASSING
455,000 BTUH, AND SHALL BE MANUAL RESET TYPE, EQUAL TO ASCO 8044 SERIES.
9. FIRE PROTECTION CONTRACTOR TO PROVIDE AND INSTALL POST INDICATOR VALVE WITH
TAMPER SWITCH.
10. NEW GAS METER /SERVICE BY VECTREN ENERGY, PLUMBING CONTRACT TO START DOWN
STREAM SIDE OF METER, TOTAL CONNECTED LOAD 1,154,000 BTUH 6" W.C..
11. HOT WATER RETURN BALANCING STATION SET AT 0.5 GPM.
12. 3/4" CW DOWN TO NON- FREEZE WALL HYDRANT.
13. CONNECT TO EXISTING GAS SERVICE AT THIS POINT.
14. SEE 1/P501 FOR HOT WATER HEATER PIPING DIAGRAM.
15. 4" VENT THRU ROOF.
16. 3/4" COLD WATER DOWN, 4" WASTE DOWN, 2" VENT UP.
17. EXTEND INDIRECT WASTE FROM ICE CHEST TO FLOOR SINK.
18. EXTEND 3/4" HOT AND COLD WATER AND FINAL CONNECT TO BLENDER STATION, EXTEND
INDIRECT WASTE TO FLOOR SINK.
19. EXTEND 3/4" HOT AND COLD WATER AND FINAL CONNECT TO FILLER /DRAIN BOARD,
EXTEND INDIRECT WASTE TO FLOOR SINK.
20. 3/4" HOT AND COLD WATER FROM BELOW, 2" ISLAND WASTE AND VENT, EXTEND AND
FINAL CONNECT TO HAND SINK.
21. 3/4" COLD WATER FROM BELOW, EXTEND THROUGH FSEC PROVIDED WATER FILTER AND
FINAL CONNECT TO ICE MACHINE, EXTEND INDIRECT WASTE TO FUNNEL FLOOR DRAIN.
22. 2" VENT FROM BELOW.
23. EXTEND INDIRECT WASTE FROM HOT FOOD TABLE TO FUNNEL FLOOR DRAIN.
24. 3/4" HOT AND COLD WATER DOWN.
25. 1 1/2" GAS DOWN, EXTEND HEADER FULL SIZE AND FINAL CONNECT TO EACH
APPLIANCE. PROVIDE SHUT -OFF VALVE AND DRIP -LEG AT EACH CONNECTION. FLEXIBLE
GAS CONNECTOR PROVIDED BY FSEC, INSTALLED BY PC.
26. 3/4" HOT AND COLD WATER DOWN, 2" WASTE DOWN, 1 1/2" VENT UP. EXTEND AND
FINAL CONNECT TO 4 -COMP SINK AND HAND SINK.
27. 3/4" HOT AND COLD WATER DOWN, 3" WASTE DOWN, 2" VENT UP. EXTEND AND FINAL
CONNECT TO MOP BASIN.
28. 3/4" HOT AND COLD WATER DOWN TO 3 -COMP SINK, EXTEND 3" WASTE HEADER FROM
EACH SINK THRU FLOW CONTROL VALVE AND GI -1.
29. 3" WASTE DOWN, 2" VENT UP.
30. 1" GAS PIPING DOWN EXTEND AND FINAL CONNECT TO HVAC EQUIPMENT, PROVIDE
SHUT -OFF VALVE AND DIRT LEG AT EQUIPMENT.
31. 1 1/4" GAS PIPING DOWN EXTEND AND FINAL CONNECT TO WATER HEATER, PROVIDE
SHUT -OFF VALVE AND DIRT LEG AT EQUIPMENT.
NATURAL GAS UTILITY DATA
MECHANICAL EQUIPMENT
DOMESTIC WATER HEATER NO.1
FURNACE NO. 1
FURNACE NO. 2
FURNACE NO. 3
FURNACE NO. 4
KITCHEN EQUIPMENT
6 BURNER RANGE W /OVEN
FRYER
GRIDDLE
CONVECTION OVEN
TOTAL GAS LOAD
199,000 BTUH
125,000 BTUH
125,000 BTUH
125,000 BTUH
125,000 BTUH
215,000 BTUH
105,000 BTUH
95,000 BTUH
40,000 BTUH
1,154,000 BTUH (4 6" W.C. PRESSURE
FSEC EQUIPMENT CONNECTION:
UNLESS NOTED OTHERWISE, ALL FOOD SERVICE EQUIPMENT AND PLUMBING
FIXTURES WITHIN PANTRY, KITCHEN, AND BAR ARE PROVIDED BY FSEC
AND INSTALLED BY THE PLUMBING CONTRACTOR. PLUMBING CONTRACTOR
SHALL SUPPLY ALL TRIM (FITTINGS, VALVES, ETC) NEEDED TO MAKE A
COMPLETE AND OPERABLE SYSTEM.
FIRE PROTECTION:
ENTIRE BUILDING TO BE SPRINKLED
WITH A DRY SYSTEM. ATTIC SHALL
ALL SPACES BELOW CEILING TO BE
TO ENSURE COMPLET SYSTEM DRAIN
PER NFPA 13 AND SPECIFICATIONS
BE PROTECTED WITH UPRIGHT HEADS,
SPRINKLED WITH DRY PENDANT HEADS
DOWN.
ma
z
z
z
UH
4
1-4 o
V
Carmel
Redevelopment Commission
111 West Main Street
Carmel, Indiana 46032
317.571 -2787 (ARTS)
0
W
0
CC
R3
C
a)
E
U
Scope Drawings:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
Revisions:
Issue Date
01/20/09
Drawn By
JJR
Checked By
JJ R
Drawing Title:
PLUMBING
FIRST
FLOOR
PLANS
L'Acquis Project Number:
08109