HomeMy WebLinkAboutC4.1 Erosion Control DetailsEROSION CONTROL SCHEDULE
EROSION CONTROL MEASURE
MAINTENANCE
INSTALLATION SEQUENCE
STONE ENTRANCE
AS NEEDED
PRIOR TO CLEARING AND GRADING
SILT FENCE
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
EXISTING INLET PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
TREE PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
TEMPORARY DIVERSIONS
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
ALONG WITH ROUGH GRADING
TEMPORARY SEEDING
WATER AS NEEDED
AFTER ROUGH GRADING
PERMANENT SEEDING
WATER AS NEEDED
AFTER FINISH GRADING
,0 0111111 1
z D �c N
r mw 41
rt% 2 G� 9 m as
/A
ZVD
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER FINISH GRADING
STRAW BALES
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER FINISH GRADING
INLET PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER EACH INLET IS PLACED
.4
5.8 -7.5
2
REMOVAL OF TREE PROTECTION
N/A
AFTER PERMANENT SEEDING
REMOVAL OF STRAW BALES
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF INLET PROTECTION
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
.4
5.8 -7.5
2
1
2
KENTUCKY BLUEGRASS
25
.6
24 -36
5 -14
PROJECT NUMBER
02 -123
T
5. TALL E
DESIGN PHASE
CONSTRUCTION
.8
5.5 -8.3
PLAN NUMBER
C4.1
SHEET OF i
1
EROSION CONTROL SCHEDULE
EROSION CONTROL MEASURE
MAINTENANCE
INSTALLATION SEQUENCE
STONE ENTRANCE
AS NEEDED
PRIOR TO CLEARING AND GRADING
SILT FENCE
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
EXISTING INLET PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
TREE PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
TEMPORARY DIVERSIONS
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
ALONG WITH ROUGH GRADING
TEMPORARY SEEDING
WATER AS NEEDED
AFTER ROUGH GRADING
PERMANENT SEEDING
WATER AS NEEDED
AFTER FINISH GRADING
EROSION CONTROL MATTING
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER FINISH GRADING
STRAW BALES
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER FINISH GRADING
INLET PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER EACH INLET IS PLACED
.4
5.8 -7.5
2
REMOVAL OF TREE PROTECTION
N/A
AFTER PERMANENT SEEDING
REMOVAL OF STRAW BALES
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF INLET PROTECTION
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
SPECIES
SEEDING RATE
SUITABLE pH
SITE SUITABILITY
MAY
LBS /ACRE
LBS /1000
SQ. FT.
DROUGHTY
WELL
DRAINED
WET
LEVEL AND SLOPING, OPEN AREAS
1. TALL E
35
.8
5.5 -8.3
2
1
2
2. TALL E
25
.6
5.5 -8.3
SPRING OATS
1
3 BU.
CLOVER RED
5
.12
SS&
1 LB.
3. KENTUCKY BLUEGRASS
15
.4
5.8 -7.5
2
1
1
CREEPING RED FESCUE
15
.4
12 -18
10 -20
STEEP BANKS AND CUTS
4. TALL E
15
.4
5.8 -7.5
2
1
2
KENTUCKY BLUEGRASS
25
.6
24 -36
5 -14
T
5. TALL E
35
.8
5.5 -8.3
2
1
1
EMERALD ROWNVETCH
10
.25
15 -20
12 -18
5 -10
LAWNS AND 3H MAINTENANCE AREAS
6. KENTUCKY BLUEGRASS
40
.9
5.8 -7.5
2
1
CREEPING RED FESCUE
40
.9
5 -10
24
14 -21
T
7. PERENNIAL RYEGRASS
170
4.0
5.0 -7.5
1
1
2
(TURF TYPE)
MED.
1
7 -10
18
5 -10
8. TALL FESCUE
170
4.0
5.5 -8.3
2
1
2
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
NORM
DRY
COVER SEED 1" TO 1 1/2" DEEP
Y Y Y ti'
V/
j A
Y
r X X
Y'�
y
k
k
SPRING OATS
2.3 LBS.
3 BU.
/o
/iii;
/j
SS&
1 LB.
40 LB.
COVER SEED 1/4" DEEP
\i
///m.,/,,z,/,„
1
1
1
MED.
1
20 -35
12 -18
10 -20
JAN
TEMPORARY SEEDINGS
MAR
APR
MAY
JUN
TYPE OF SEED
1000 SQ. FT.
ACRE
REMARKS
NOV
DEC
NORM
DRY
WHEAT OR RYE
3.5 LBS.
2 BU.
COVER SEED 1" TO 1 1/2" DEEP
Y Y Y ti'
k� k�
X
X
x
Y
r X X
Y'�
y
k
k
SPRING OATS
2.3 LBS.
3 BU.
COVER SEED 1" DEEP
X X r V
�k� XX /x X
/iii;
/j
7 -21
ANNUAL RYEGRASS
1 LB.
40 LB.
COVER SEED 1/4" DEEP
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
NORM
DRY
V X
Pav
ri k
int,
,X kx
X Y'
j
X Y X
X
k
4
4 4 444$ V la
Sr
Y Y Y ti'
k� k�
X
X
x
Y
r X X
Y'�
y
k
k
1
,r r
X X
X
k
�C
Y
X X
X
X X r V
�k� XX /x X
/iii;
/j
7 -21
S
KENTUCKY GRASS CIS
POA
2
1
2
1
1
1
MED.
1
20 -35
12 -18
10 -20
MT
TALL FESTUCA L. FESCUE IDINACEA
1
-.4 `40. 10■
(M
PUBLIC ROAD
12" M
INIMUM
THICKNESS
#2 COARSE
AGGREGATE
GEOTEXTILE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
S p,
TEMPORARY CONSTRUCTION ENTRANCE
NOT TO SCALE
1 GOOD
2 MEDIUM
IT
SEEDBED PREPARATION
SEED TOLERANCE
SALT TOLERANCE (TO BOTH SOIL SALTS SPRAY)
T TOLERANCE
MT MEDIUM TOLERANCE
S SLIGHT TOLERANCE
APPLY LIME J RAISE THE pH TO THE LEVEL NEEDED FOR SPECIES BEING
SEEDED. APPLY 3 POUNDS OF 12 -12 -12 ANALYSIS FERTILIZER (OR EQUIVALENT) PER
1000 SQ. FT. PROXIMATELY 1000 POUNDS PER ACRE) OR FERTILIZE ACCORDING TO
TEST. APPLICATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC
MATTER AND FERTILITY WILL GREATLY ENHANCE VEGETATIVE GROWTH.
WORK THE FERTILIZER AND LIME INTO THE SOIL TO A DEPTH OF 2 -3 INCHES
WITH A HARROW, DISK OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE.
SEEDING
SELECT A :ED MIXTURE BASED ON PROJECTED USE OF THE AREA (SEE
PERMANENT SEED MIXTURE CHART). WHILE CONSIDERING BEST SEEDING DATES.
IF PERMANENT SEEDING IS NOT PERMITTED USE TEMPORARY SEEDING
UNTIL PERMANENT SEEDING CAN BE APPLIED. IF TOLERANCES ARE A PROBLEM, SUCH AS
SALT TOLERANCE OF SEEDINGS ADJACENT TO STREETS AND HIGHWAYS, SEE
SEED TOLERANCE CHART.
SEED TOLERANCE CHART
1 PREFERRED 2 WILL TOLERATE INOCULATE WITH SPECIFIC INOCULANT.
SEEDING DETAIL
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON- IRRIGATED*
IRRIGATED
DORMANT
SEEDING
EXTEND FABRIC
TO 4" BELOW
SURFACE
FILTER FABRIC
FLOW
NOT NECESSARY WHERE MULCH IS APPLIED.
NON WOVEN
GEOTEXTI LE
FABRIC
i ce
SPACE POSTS PER
MANUFACTURER
RECOMMENDATIONS
WOOD POST
SILT FENCE CONSTRUCTION
TEMPORARY SEEDING DATES
PERMANENT SEEDING DATES
INCREASE SEEDING APPLICATION BY 50
NOT TO SCALE
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS.
USE MULCH.
LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS
IF MULCH IS APPLIED.
NOTE;
POSTS SHALL HAVE A MINIMUM LENGTH OF
36 INCHES PLUS BURIAL DEPTH. POST MATERIAL
SHALL BE WOOD, STEEL, OR SYNTHETIC, AND SHALL
BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE
DURING INSTALLATION AND TO SUPPORT APPLIED
LOADS.
FABRIC SHALL BE A WOVEN GEOTEXTILE FABRIC
CONSISTING OF STRONG, ROT RESISTANT,
MATERIALS RESISTANT TO DETERIORATION FROM
ULTRAVIOLET AND HEAT EXPOSURE.
1.
2 STAKES (TYP)
PER BALE
COMPACTED SOIL
TO PREVENT PIPING
STAKED
STRAW BALE
CHANNEL INSTALLATION
NOTE: HORIZONTAL STAPLE SPACING SHOULD BE ALTERED
IF NECESSARY TO ALLOW STAPLES TO SECURE THE
CRITICAL POINTS ALONG THE CHANNEL SURFACE.
REFER TO GENERAL STAPLE PATTERN GUIDE FOR
CORRECT STAPLE RECOMMENDATIONS FOR CHANNELS.
CRITICAL POINTS
A. OVERLAPS AND SEAMS
B. PROJECTED WATER LINE
C. CHANNEL BOTTOM /SIDE
SLOPE VERTICES
PLAN
SECTION
14649 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47711
USA 1- 800 772 -2040 CANADA 1- 800 448 -2040
STORM INLET STRAW
BALE PROTECTION
NOT TO SCALE
BINDINGS FOR STRAW BALES
TO BE PLACED PARALLEL
TO GROUND
STORM INLET
STRUCTURE
8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED IN A 6" DEEP X 6" WIDE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
7
PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
3, ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW ON BOTTOM OF CHANNEL.
4. PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH A 6" OVERLAP. USE A DOUBLE ROW OF'
STAGGERED STAPLES 4" APART TO SECURE BLANKETS.
5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED IN 6" DEEP X 6" WIDE
TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
6. BLANKETS ON SIDE SLOPES MUST BE OVERLAPPED 4" OVER THE CENTER BLANKET AND STAPLED
(2" FOR C350 MATTING).
7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT
INTERVALS. USE A ROW OF STAPLES 4" APART OVER ENTIRE WIDTH OF THE CHANNEL. PLACE A
SECOND ROW 4" BELOW THE FIRST ROW IN A STAGGERED PATTERN.
EROSION CONTROL NOTES
1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT
STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR
LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION.
2. LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING
REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION.
3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR
SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT
FROM LEAVING THE SITE. ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON -SITE INSPECTION.
4. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL
PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING
STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A
MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE.
5. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE
CARRIED FROM THE SITE BY STORMWATER RUNOFF. PROPER DISPOSAL OF
ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED.
6. SEDIMENT BEING TRACED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE
MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE
FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE
SITE FOR DISPOSAL.
7. SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL
BE COLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT,
AND AT LEAST ONCE A WEEK.
8. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY
WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FALTER
FABRIC.
9. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION
AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT
ALLOWED ON -SITE.
10. SCHEDULE OF EARTHWORK ACTIVITIES:
a) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE
KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED
SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL
BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION
CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY CEASES FOR MORE
THAN 21 DAYS OR AS DIRECTED BY THE ENGINEER.
b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO
OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIME OF THE YEAR.
PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION
CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER
FINAL GRADING OR AS SOON AS POSSIBLE.
EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS
STRAW BALE DAM MAINTENANCE REQUIREMENTS:
1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE IT.
SILT FENCE MAINTENANCE REQUIREMENTS:
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS:
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIP RAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE DISTURBED AREA TO BLEND WITH ADJOINING AREAS, AND STABILIZE.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS:
1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET
COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS:
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOP DRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
EROSION AND SEDIMENT CONTROL
PLAN SUMMARY AND "RULE 5" DATA
PROJECT: GODDARD SCHOOL
NATURE AND PURPOSE: DAYCARE
ESTIMATED START: SPRING 2003
ESTIMATED COMPLETION OF SITE DEVELOPMENT: FALL 2003
FLOODPLAINS, FLOODWAY FRINGES, FLOODWAYS: NOT APPLICABLE
EXISTING SOIL TYPES DESCRIPTION
CROSBY SILT LOAM: DEEP, SOMEWHAT POORLY DRAINED SOIL
MIAMI SILT LOAM: DEEP, WELL DRAINED SOIL
RECEIVING WATERS: WHITE RIVER
POTENTIAL AREAS WHERE STORMWATER MAY ENTER GROUNDWATER: NONE KNOWN
EXISTING VEGETATION:
THE SITE IS CURRENTLY COVERED WITH SHORT GRASSES.
CONTACT PERSON:
JIM PECK
CIVIL DESIGNS, LLP
2415 DIRECTORS ROW, SUITE E
INDIANAPOLIS, INDIANA 46241
(317) 244 -1968
ADJACENT LAND USE:
NORTH COMMERCIAL
SOUTH COMMERCIAL
EAST RESIDENTIAL
WEST COMMERCIAL
SITE SPECIFIC SEQUENCE AND ADDITIONAL NOTES:
THE PERIMETER SILT FENCES SHOULD BE CONSTRUCTED
AND STABILIZED AS EARLY AS PRACTICAL TO PREVENT RUN -OFF FROM
LEAVING THE SITE OR CLEAN OFF -SITE WATER FROM WASHING THROUGH THE
SITE. EROSION CONTROL AND INLET PROTECTION SHALL BE INSTALLED
IMMEDIATELY AFTER INSTALLATION OF STORM SEWERS.
J
SOIL
CONDITION
SHADE
TOLERANCE
CLOSE MOWING
TO 2 -3 1/2 INCHES
TRAMPING
TOLERANCE
FERTILITY
NEEDS
WINTER
HARDINESS
FLOODING
TOLERANCE (DAYS)
MATURE
HEIGHT (INCHES)
EMERGENCE
TIME (DAYS)
SOIL
TOLERANCE
WET
NORM
DRY
V X
Pav
ri k
int,
,X kx
X Y'
j
X Y X
X
k
4
4 4 444$ V la
Sr
Y Y Y ti'
k� k�
X
X
x
Y
r X X
Y'�
y
k
k
1
,r r
X X
X
k
�C
Y
X X
X
X X r V
�k� XX /x X
PIOTOOPTO
0 •6•4*
"WM 4
1
-.4 `40. 10■
(M
PUBLIC ROAD
12" M
INIMUM
THICKNESS
#2 COARSE
AGGREGATE
GEOTEXTILE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
S p,
TEMPORARY CONSTRUCTION ENTRANCE
NOT TO SCALE
1 GOOD
2 MEDIUM
IT
SEEDBED PREPARATION
SEED TOLERANCE
SALT TOLERANCE (TO BOTH SOIL SALTS SPRAY)
T TOLERANCE
MT MEDIUM TOLERANCE
S SLIGHT TOLERANCE
APPLY LIME J RAISE THE pH TO THE LEVEL NEEDED FOR SPECIES BEING
SEEDED. APPLY 3 POUNDS OF 12 -12 -12 ANALYSIS FERTILIZER (OR EQUIVALENT) PER
1000 SQ. FT. PROXIMATELY 1000 POUNDS PER ACRE) OR FERTILIZE ACCORDING TO
TEST. APPLICATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC
MATTER AND FERTILITY WILL GREATLY ENHANCE VEGETATIVE GROWTH.
WORK THE FERTILIZER AND LIME INTO THE SOIL TO A DEPTH OF 2 -3 INCHES
WITH A HARROW, DISK OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE.
SEEDING
SELECT A :ED MIXTURE BASED ON PROJECTED USE OF THE AREA (SEE
PERMANENT SEED MIXTURE CHART). WHILE CONSIDERING BEST SEEDING DATES.
IF PERMANENT SEEDING IS NOT PERMITTED USE TEMPORARY SEEDING
UNTIL PERMANENT SEEDING CAN BE APPLIED. IF TOLERANCES ARE A PROBLEM, SUCH AS
SALT TOLERANCE OF SEEDINGS ADJACENT TO STREETS AND HIGHWAYS, SEE
SEED TOLERANCE CHART.
SEED TOLERANCE CHART
1 PREFERRED 2 WILL TOLERATE INOCULATE WITH SPECIFIC INOCULANT.
SEEDING DETAIL
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON- IRRIGATED*
IRRIGATED
DORMANT
SEEDING
EXTEND FABRIC
TO 4" BELOW
SURFACE
FILTER FABRIC
FLOW
NOT NECESSARY WHERE MULCH IS APPLIED.
NON WOVEN
GEOTEXTI LE
FABRIC
i ce
SPACE POSTS PER
MANUFACTURER
RECOMMENDATIONS
WOOD POST
SILT FENCE CONSTRUCTION
TEMPORARY SEEDING DATES
PERMANENT SEEDING DATES
INCREASE SEEDING APPLICATION BY 50
NOT TO SCALE
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS.
USE MULCH.
LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS
IF MULCH IS APPLIED.
NOTE;
POSTS SHALL HAVE A MINIMUM LENGTH OF
36 INCHES PLUS BURIAL DEPTH. POST MATERIAL
SHALL BE WOOD, STEEL, OR SYNTHETIC, AND SHALL
BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE
DURING INSTALLATION AND TO SUPPORT APPLIED
LOADS.
FABRIC SHALL BE A WOVEN GEOTEXTILE FABRIC
CONSISTING OF STRONG, ROT RESISTANT,
MATERIALS RESISTANT TO DETERIORATION FROM
ULTRAVIOLET AND HEAT EXPOSURE.
1.
2 STAKES (TYP)
PER BALE
COMPACTED SOIL
TO PREVENT PIPING
STAKED
STRAW BALE
CHANNEL INSTALLATION
NOTE: HORIZONTAL STAPLE SPACING SHOULD BE ALTERED
IF NECESSARY TO ALLOW STAPLES TO SECURE THE
CRITICAL POINTS ALONG THE CHANNEL SURFACE.
REFER TO GENERAL STAPLE PATTERN GUIDE FOR
CORRECT STAPLE RECOMMENDATIONS FOR CHANNELS.
CRITICAL POINTS
A. OVERLAPS AND SEAMS
B. PROJECTED WATER LINE
C. CHANNEL BOTTOM /SIDE
SLOPE VERTICES
PLAN
SECTION
14649 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47711
USA 1- 800 772 -2040 CANADA 1- 800 448 -2040
STORM INLET STRAW
BALE PROTECTION
NOT TO SCALE
BINDINGS FOR STRAW BALES
TO BE PLACED PARALLEL
TO GROUND
STORM INLET
STRUCTURE
8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED IN A 6" DEEP X 6" WIDE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
7
PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
3, ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW ON BOTTOM OF CHANNEL.
4. PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH A 6" OVERLAP. USE A DOUBLE ROW OF'
STAGGERED STAPLES 4" APART TO SECURE BLANKETS.
5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED IN 6" DEEP X 6" WIDE
TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
6. BLANKETS ON SIDE SLOPES MUST BE OVERLAPPED 4" OVER THE CENTER BLANKET AND STAPLED
(2" FOR C350 MATTING).
7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT
INTERVALS. USE A ROW OF STAPLES 4" APART OVER ENTIRE WIDTH OF THE CHANNEL. PLACE A
SECOND ROW 4" BELOW THE FIRST ROW IN A STAGGERED PATTERN.
EROSION CONTROL NOTES
1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT
STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR
LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION.
2. LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING
REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION.
3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR
SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT
FROM LEAVING THE SITE. ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON -SITE INSPECTION.
4. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL
PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING
STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A
MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE.
5. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE
CARRIED FROM THE SITE BY STORMWATER RUNOFF. PROPER DISPOSAL OF
ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED.
6. SEDIMENT BEING TRACED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE
MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE
FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE
SITE FOR DISPOSAL.
7. SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL
BE COLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT,
AND AT LEAST ONCE A WEEK.
8. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY
WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FALTER
FABRIC.
9. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION
AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT
ALLOWED ON -SITE.
10. SCHEDULE OF EARTHWORK ACTIVITIES:
a) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE
KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED
SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL
BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION
CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY CEASES FOR MORE
THAN 21 DAYS OR AS DIRECTED BY THE ENGINEER.
b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO
OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIME OF THE YEAR.
PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION
CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER
FINAL GRADING OR AS SOON AS POSSIBLE.
EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS
STRAW BALE DAM MAINTENANCE REQUIREMENTS:
1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE IT.
SILT FENCE MAINTENANCE REQUIREMENTS:
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS:
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIP RAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE DISTURBED AREA TO BLEND WITH ADJOINING AREAS, AND STABILIZE.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS:
1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET
COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS:
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOP DRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
EROSION AND SEDIMENT CONTROL
PLAN SUMMARY AND "RULE 5" DATA
PROJECT: GODDARD SCHOOL
NATURE AND PURPOSE: DAYCARE
ESTIMATED START: SPRING 2003
ESTIMATED COMPLETION OF SITE DEVELOPMENT: FALL 2003
FLOODPLAINS, FLOODWAY FRINGES, FLOODWAYS: NOT APPLICABLE
EXISTING SOIL TYPES DESCRIPTION
CROSBY SILT LOAM: DEEP, SOMEWHAT POORLY DRAINED SOIL
MIAMI SILT LOAM: DEEP, WELL DRAINED SOIL
RECEIVING WATERS: WHITE RIVER
POTENTIAL AREAS WHERE STORMWATER MAY ENTER GROUNDWATER: NONE KNOWN
EXISTING VEGETATION:
THE SITE IS CURRENTLY COVERED WITH SHORT GRASSES.
CONTACT PERSON:
JIM PECK
CIVIL DESIGNS, LLP
2415 DIRECTORS ROW, SUITE E
INDIANAPOLIS, INDIANA 46241
(317) 244 -1968
ADJACENT LAND USE:
NORTH COMMERCIAL
SOUTH COMMERCIAL
EAST RESIDENTIAL
WEST COMMERCIAL
SITE SPECIFIC SEQUENCE AND ADDITIONAL NOTES:
THE PERIMETER SILT FENCES SHOULD BE CONSTRUCTED
AND STABILIZED AS EARLY AS PRACTICAL TO PREVENT RUN -OFF FROM
LEAVING THE SITE OR CLEAN OFF -SITE WATER FROM WASHING THROUGH THE
SITE. EROSION CONTROL AND INLET PROTECTION SHALL BE INSTALLED
IMMEDIATELY AFTER INSTALLATION OF STORM SEWERS.
J
SOIL
CONDITION
SHADE
TOLERANCE
CLOSE MOWING
TO 2 -3 1/2 INCHES
TRAMPING
TOLERANCE
FERTILITY
NEEDS
WINTER
HARDINESS
FLOODING
TOLERANCE (DAYS)
MATURE
HEIGHT (INCHES)
EMERGENCE
TIME (DAYS)
SOIL
TOLERANCE
WET
NORM
DRY
GEN.
SOIL
SPRAY
CREEPING RED FESTUCA FESCUE
3RA
2
1
2
1
1
1
MED.
1
20 -25
12 -18
7 -21
S
KENTUCKY GRASS CIS
POA
2
1
2
1
1
1
MED.
1
20 -35
12 -18
10 -20
MT
TALL FESTUCA L. FESCUE IDINACEA
2
1
1
1
1
1
LOW
1
24 -35
24 -36
5 -14
T
PERENNIAL LOLLUM (NESS
2
1
2
1
2
HIGH
2
15 -20
12 -18
5 -10
MT
CROWWETCH
CORONILLA RLA
1
1
2
LOW
1
5 -10
24
14 -21
T
RED CLOVER "ENSE
1
2
MED.
1
7 -10
18
5 -10
S
S
1
-.4 `40. 10■
(M
PUBLIC ROAD
12" M
INIMUM
THICKNESS
#2 COARSE
AGGREGATE
GEOTEXTILE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
S p,
TEMPORARY CONSTRUCTION ENTRANCE
NOT TO SCALE
1 GOOD
2 MEDIUM
IT
SEEDBED PREPARATION
SEED TOLERANCE
SALT TOLERANCE (TO BOTH SOIL SALTS SPRAY)
T TOLERANCE
MT MEDIUM TOLERANCE
S SLIGHT TOLERANCE
APPLY LIME J RAISE THE pH TO THE LEVEL NEEDED FOR SPECIES BEING
SEEDED. APPLY 3 POUNDS OF 12 -12 -12 ANALYSIS FERTILIZER (OR EQUIVALENT) PER
1000 SQ. FT. PROXIMATELY 1000 POUNDS PER ACRE) OR FERTILIZE ACCORDING TO
TEST. APPLICATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC
MATTER AND FERTILITY WILL GREATLY ENHANCE VEGETATIVE GROWTH.
WORK THE FERTILIZER AND LIME INTO THE SOIL TO A DEPTH OF 2 -3 INCHES
WITH A HARROW, DISK OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE.
SEEDING
SELECT A :ED MIXTURE BASED ON PROJECTED USE OF THE AREA (SEE
PERMANENT SEED MIXTURE CHART). WHILE CONSIDERING BEST SEEDING DATES.
IF PERMANENT SEEDING IS NOT PERMITTED USE TEMPORARY SEEDING
UNTIL PERMANENT SEEDING CAN BE APPLIED. IF TOLERANCES ARE A PROBLEM, SUCH AS
SALT TOLERANCE OF SEEDINGS ADJACENT TO STREETS AND HIGHWAYS, SEE
SEED TOLERANCE CHART.
SEED TOLERANCE CHART
1 PREFERRED 2 WILL TOLERATE INOCULATE WITH SPECIFIC INOCULANT.
SEEDING DETAIL
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON- IRRIGATED*
IRRIGATED
DORMANT
SEEDING
EXTEND FABRIC
TO 4" BELOW
SURFACE
FILTER FABRIC
FLOW
NOT NECESSARY WHERE MULCH IS APPLIED.
NON WOVEN
GEOTEXTI LE
FABRIC
i ce
SPACE POSTS PER
MANUFACTURER
RECOMMENDATIONS
WOOD POST
SILT FENCE CONSTRUCTION
TEMPORARY SEEDING DATES
PERMANENT SEEDING DATES
INCREASE SEEDING APPLICATION BY 50
NOT TO SCALE
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS.
USE MULCH.
LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS
IF MULCH IS APPLIED.
NOTE;
POSTS SHALL HAVE A MINIMUM LENGTH OF
36 INCHES PLUS BURIAL DEPTH. POST MATERIAL
SHALL BE WOOD, STEEL, OR SYNTHETIC, AND SHALL
BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE
DURING INSTALLATION AND TO SUPPORT APPLIED
LOADS.
FABRIC SHALL BE A WOVEN GEOTEXTILE FABRIC
CONSISTING OF STRONG, ROT RESISTANT,
MATERIALS RESISTANT TO DETERIORATION FROM
ULTRAVIOLET AND HEAT EXPOSURE.
1.
2 STAKES (TYP)
PER BALE
COMPACTED SOIL
TO PREVENT PIPING
STAKED
STRAW BALE
CHANNEL INSTALLATION
NOTE: HORIZONTAL STAPLE SPACING SHOULD BE ALTERED
IF NECESSARY TO ALLOW STAPLES TO SECURE THE
CRITICAL POINTS ALONG THE CHANNEL SURFACE.
REFER TO GENERAL STAPLE PATTERN GUIDE FOR
CORRECT STAPLE RECOMMENDATIONS FOR CHANNELS.
CRITICAL POINTS
A. OVERLAPS AND SEAMS
B. PROJECTED WATER LINE
C. CHANNEL BOTTOM /SIDE
SLOPE VERTICES
PLAN
SECTION
14649 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47711
USA 1- 800 772 -2040 CANADA 1- 800 448 -2040
STORM INLET STRAW
BALE PROTECTION
NOT TO SCALE
BINDINGS FOR STRAW BALES
TO BE PLACED PARALLEL
TO GROUND
STORM INLET
STRUCTURE
8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED IN A 6" DEEP X 6" WIDE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
7
PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
3, ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW ON BOTTOM OF CHANNEL.
4. PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH A 6" OVERLAP. USE A DOUBLE ROW OF'
STAGGERED STAPLES 4" APART TO SECURE BLANKETS.
5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED IN 6" DEEP X 6" WIDE
TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
6. BLANKETS ON SIDE SLOPES MUST BE OVERLAPPED 4" OVER THE CENTER BLANKET AND STAPLED
(2" FOR C350 MATTING).
7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT
INTERVALS. USE A ROW OF STAPLES 4" APART OVER ENTIRE WIDTH OF THE CHANNEL. PLACE A
SECOND ROW 4" BELOW THE FIRST ROW IN A STAGGERED PATTERN.
EROSION CONTROL NOTES
1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT
STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR
LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION.
2. LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING
REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION.
3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR
SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT
FROM LEAVING THE SITE. ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON -SITE INSPECTION.
4. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL
PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING
STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A
MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE.
5. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE
CARRIED FROM THE SITE BY STORMWATER RUNOFF. PROPER DISPOSAL OF
ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED.
6. SEDIMENT BEING TRACED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE
MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE
FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE
SITE FOR DISPOSAL.
7. SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL
BE COLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT,
AND AT LEAST ONCE A WEEK.
8. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY
WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FALTER
FABRIC.
9. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION
AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT
ALLOWED ON -SITE.
10. SCHEDULE OF EARTHWORK ACTIVITIES:
a) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE
KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED
SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL
BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION
CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY CEASES FOR MORE
THAN 21 DAYS OR AS DIRECTED BY THE ENGINEER.
b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO
OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIME OF THE YEAR.
PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION
CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER
FINAL GRADING OR AS SOON AS POSSIBLE.
EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS
STRAW BALE DAM MAINTENANCE REQUIREMENTS:
1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE IT.
SILT FENCE MAINTENANCE REQUIREMENTS:
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS:
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIP RAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE DISTURBED AREA TO BLEND WITH ADJOINING AREAS, AND STABILIZE.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS:
1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET
COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS:
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOP DRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
EROSION AND SEDIMENT CONTROL
PLAN SUMMARY AND "RULE 5" DATA
PROJECT: GODDARD SCHOOL
NATURE AND PURPOSE: DAYCARE
ESTIMATED START: SPRING 2003
ESTIMATED COMPLETION OF SITE DEVELOPMENT: FALL 2003
FLOODPLAINS, FLOODWAY FRINGES, FLOODWAYS: NOT APPLICABLE
EXISTING SOIL TYPES DESCRIPTION
CROSBY SILT LOAM: DEEP, SOMEWHAT POORLY DRAINED SOIL
MIAMI SILT LOAM: DEEP, WELL DRAINED SOIL
RECEIVING WATERS: WHITE RIVER
POTENTIAL AREAS WHERE STORMWATER MAY ENTER GROUNDWATER: NONE KNOWN
EXISTING VEGETATION:
THE SITE IS CURRENTLY COVERED WITH SHORT GRASSES.
CONTACT PERSON:
JIM PECK
CIVIL DESIGNS, LLP
2415 DIRECTORS ROW, SUITE E
INDIANAPOLIS, INDIANA 46241
(317) 244 -1968
ADJACENT LAND USE:
NORTH COMMERCIAL
SOUTH COMMERCIAL
EAST RESIDENTIAL
WEST COMMERCIAL
SITE SPECIFIC SEQUENCE AND ADDITIONAL NOTES:
THE PERIMETER SILT FENCES SHOULD BE CONSTRUCTED
AND STABILIZED AS EARLY AS PRACTICAL TO PREVENT RUN -OFF FROM
LEAVING THE SITE OR CLEAN OFF -SITE WATER FROM WASHING THROUGH THE
SITE. EROSION CONTROL AND INLET PROTECTION SHALL BE INSTALLED
IMMEDIATELY AFTER INSTALLATION OF STORM SEWERS.
J