HomeMy WebLinkAbout05060041 C901 Site SpecsPipe
Diameter
In.
TABLE 1 TABLE 1
MINIMUM SPECIFIED TIME REQUIRED FOR A 1.0 pig
DROP FOR SIZE, AND LENGTH OF PIPE INDICATED
Minimumm
Time,
min :s
Lcngth for
Minimum
Time, ft
Time for
Longer
Length, S
Specification Time for Length (L) Shown, mints
4
3;48
100 ft
150 ft
200 ft
250 ft
300 fl
350 ft
400 1t
450 ft
597
0.360 L
3:46
3:46
3:46
3:46
3 :46
3:46
3:46
3 :46
6
3:40
336
0.854 L
5:40
5 :40
5 :40
5 :40
5 :40
5:40
5:42
8
10
7:34
298
1.520 L
7:34
9:28
7 :34
9:28
7:34
9 :28
7:34
7 :36
8:52
10:08
8 :26
239
2.374 L
9:63
11:52
13:51
15:49
17 :48
25:38
12
11:20
199
3.418 L
11 :20
11:20
1 1124
17:48
14 :15
17:05
19:58
22:47
16
14:10
158
5.342 L
14 :10
14:10
22:15
26:42
31 :09
35:36
40:04
18
17 :00
133
7.682 L.
19:13
25 :38
32:03
26:27
44:52
51 :16
57:41
21
2
19 :56
22:41
114
10.470 L
18 :60
26 :10
34:54
43:37
52:21
61;00
69:48
78:31
89
13.674 L
22:47
34:11
45 :34
56:58
68:22
79:46
91:10
102:33
129 :48
'27
25:30
88
17.306 L
28 :51
43:16
57:41
72:07
86:32
100:57
115;22
30
28:20
80
21.388 L
96:37
53:26
71 :13
89:02
108 :50
124 :38
142:25
160:15
33
31 :10
72
25,852 1,
49:05
64:38
88:10
107:49
129 :18
150:43
172:21
193:53
:31;
34:00
86 30.788 L
61:17_
76 :55
102:12
128:12
1 53:80
179 :29
205:07
230:46
TYPICAL SANITARY SEWER SPECIFICATIONS TO BE USED FOR PRIVATE SEWER
DEVELOPMENT WITHIN CLAY TOWNSHIP REGIONAL WASTE DISTRICT (REVISE D MAY 2002)
1 STANDARD SPECIFICATIONS OF THE DISTRICT
A� B� INSTALLED EN ACCORDANCE WITH SECTION 715. AL APPLY
FOR ALL WORK AND MATERIALS. PIPE SHALL
AND ASTM
2. SANITARY SEWER PIPE SHALL BE PVC IN EL CAIRJDAGASKET.HTHE ASTM D-3034 PIPE SHALL BE MADE OF PVC PLASTIC
2321. PVC PIPE SHALL HAVE GROOVED
HAVING A CELL CLASSIFICATION OF 12454B.
3. PVC SEWER FITTINGS SHALL CONFORM TO THE R ED L IN E ONE N PIECE OF
WITH M E JOENTSICAND ATION.
FITTINGS IN SIZES THROUGH 8" SHALL BE MOLDED
SOCKET DEPTHS AS SPECIFIED IN SECTIONS 6.2 AND 7.3.2. FITTINGS 10" AND LARGER SHALL
BE MOLDED OR FABRICATED IN ACCORDANCE WITH SECTION 7.11 WITH MANUFACTURERS STANDARD PIPE
BELLS AND GASKETS. WALL THICKNESS OF FITTINGS SHALL BE SDR 26 AS DEFINED IN SECTION 7.4.1 OF
SPECIFICATIONS. GASKETS FOR ELASTOMERIC JOINT ASTM SHALL BE MMOLDED I WITH
MINIMUM
NGS CROSSSECTIONAL
AREA OF 0.20 SQUARE INCHES AND CONFO RM
SHALL BE MANUFACTURED BY HARCO OR EQUAL.
4. ALL SANITARY MANHOLES SHALL BE PRECAST CONCRETE MANHOLES IN ACCORDANCE WITH ASTM C -478
AND SECTION 720. 0 -RINGS SHALL CONFORM TO C -443. KENT SEAL OR EQUIVALENT SHALL ALSO BE
APPLIED TO ALL JOINTS AND BETWEEN RISER RINGS AND CASTINGS. MANHOLE STEP SPACING SHALL BE NO
MORE THAN 16- INCHES. MANHOLES SEt3RLCONCRETE TESTED
SEWER MANHOLES BY THE ACCORDANCE
NEGATIVE AIR
WITH ASTM
C1244 -93, STANDARD TEST METHOD
PRESSURE (VACUUM) TEST.
A. INSTALLATION AND OPERATION OF VACUUM EQUIPMENT AND INDICATING DEVICES MUST BE IN
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS AND PERFORMANCE SPECIFICATIONS
WHICH HAVE BEEN PROVIDED BY CAPABLE OF TESTING MANUFACTURER THE ENTIRE MANHOLE, INCLUDING THE
VACUUM EQUIPMENT MUST BE C THE
CASTING AND RISER RINGS.
8. WITH THE VACUUM TESTER SET IN PLACE:
1. CONNECT THE VACUUM PUMP TO THE OUTLET PORT WITH THE VALVE OPEN.
2. DRAW A VACUUM OF TEN (10) INCHES OF HG. AND CLOSE THE VALVE.
C. ACCEPTED STANDARDS FOR LEAKAGE WILL 1QE ESTABLISHED
TOEOlNE THE
MERCURY. OR THE
NEGATIVE PRESSURE CHANGE FROM TEN NCHS
MAXIMUM ALLOWABLE LEAKAGE RATE FOR A FOUR (4) FOOT DIAMETER MANHOLE MUST BE IN
ACCORDANCE WITH THE FOLLOWING:
MINIMUM ELAPSED TIME FOR A
MANHOLE DEPTH PRESSURE CHANGE OF 1 INCH HG
10 FEET OR LESS 60 SECONDS
>10 FEET BUT <15 FEET 75 SECONDS
>15 FEET BUT <25 FEET 90 SECONDS
FOR MANHOLES FIVE (5) FEET IN DIAMETER,
AN ADDITIONA ADDITIONAL
SECONDS TO D HE TIME
OR
MANHOLES SIX (6) FEET IN DIAMETER, ADD
REQUIREMENTS FOR FOUR (4) FOOT DIAMETER MANHOLES. FOR ALL MANHOLES DEEPER THAN
TWENTY -FIVE (25) FEET, THE ENGINEER WILL DETERMINE THE APPLICABLE MINIMUM ELAPSED
TIME.
D. IF THE MANHOLE FAILS THE TEST, NECESSARY Y REPAIRS
E P T BE MADE AND THE VACUUM TEST AND
REPAIRS MUST BE REPEATED UNTIL L E
E. IF MANHOLE JOINT SEALANTS ARE PULLED OUT DURING THE VACUUM TEST, THE MANHOLE MUST BE
DISASSEMBLED AND THE JOINT SEALANTS REPLACED.
F. MANHOLES WILL BE SUBJECT TO VISUAL INSPECTION WITH ALL VISUAL LEAKS BEING REPAIRED.
5. BUTYL RUBBER COATING SHALL BE APPLIED APPROPRIATE PRIMER MANHOLE OR TO 6-INCHES RUBBER U
INCHES BELOW EACH JOINT. THE APPRO
COATING. INSIDE JOINTS TO BE FILLED WITH PRECOAT PLUG MATERIAL.
6. THE MANHOLE CHIMNEYS, INCLUDING ALL RISER RINGS SHALL BE SEALED USING INFI- SHIELD UNIBAND
OR APPROVED EQUAL. PRIOR TO PLACEMENT, THE TOP 4- INCHES OF THE MANHOLE CONE AND CASTING
FRAME SHALL BE CLEANED AND PRIMED. HE HE N BAND ESHALL
LHE EXTEND
CASTING 3- INCHES BELOW THE TOP
OF THE CONE SECTION TO 2- INCHES OVER
7. THE CASTING ELEVATIONS ARE SET BY PLAN. HOWEVER, THE CASTINGS ARE TO BE ADJUSTED IN THE FIELD
BY THE ENGINEERS REPRESENTATIVE S O CNSTALLED OCCUR
TO ESTABLISH GRADE. MAXIMUM ND HEIGHT
GRADE. NEW MANHOLE RING AND COVE R SHALL BE
OF ADJUSTING RINGS SHALL BE 12- INCHES.
8. BACKFILL AROUND ALL STRUCTURES AND ALL CUTS UNDER PAVED AREAS WITH GRANULAR MATERIAL.
TRENCHES OPENING WITHIN 5 -FEET OF PAVED ROADWAYS SHALL BE BACKFILLED WITH GRANULAR MATERIAL
IN ACCORDANCE WITH SECTION 211. BACKFILL UNDER R SIDEWALKS
S BEEN iNGRANULAR, UNLESS THE W .LKS
ARE CONSTRUCTED A MINIMUM OF 6 MONTHS
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING OR TO START OF CONSTRUCTION. HIGHWAYS, ITY, AND COUt TY
PERMITS HAVE BEEN OBTAINED BY THE DEVELOPER
10. THE CONTRACTOR SHALL BE REQUIRED TO FURNISH THE DEVELOPER'S ENGINEER WITH A SET OF PRIN
MARKED IN RED PENCIL, SHOWING ACTUAL SEWER LOCATION AND INVERT, TO INCLUDE LATERAL LOCATION,
DEPTH AND LENGTH. SUCH ASBUILT PRINTS MUST BE RECEIVED BY THE ENGINEER BEFORE THE FINAL
CONTRACT PAYMENT CAN BE AUTHORIZED. T MMEDIATELYNABOVEBTHEESAlp ATIOfv SHALL
BE INDICATED ON THE SURFACE WITH A ME TAL FENCE POST SE
TERMINATION POINT.
11. ALL SANITARY SEWER LINES UPON COMPLETION WILL BE REQUIRED TO PASS A LOW PRESSURE AIR TEST.
SAID TEST SHALL BE CONDUCTED ACCORDING TO ASTM 1417 -92, AND SHALL BE WITNESSED BY AN
ENGINEER AND A REPRESENTATIVE OF THE R DI G SHALL LL BE IN ACCORDANCE WITH TABLE
1. ADD 0.5 PSIG FOR EACH FOOT OF WATER ABOVE THE SEWER
12. DEFLECTION TESTS SHALL BE PERFORMED ON FLEXIBLE* VERTICAL DEFLECTION OF BACKFILL HAS
ELECTION TEST
BEEN IN
PLACE AT LEAST 30 DAYS. NO PIPE SHALL EXCEED A
RESULTS. (*THE FOLLOWING ARE CONSIDERED NON-FLEXIBLE
ER PORMED EPOINT DUCTILE PIPE,
AND CAST IRON PIPE). THE DEFLECTION TEST SHALL BE
PROVING RINGS SHALL BE AVAILABLE.
13. ALL MANDREL TESTING SHALL BE OBSERVED BY A PROFESSIONAL ENGINEER REPRESENTATIVE FOR
CERTIFICATION AND A REPRESENTATIVE OF THE DISTRICT.
14. THE ENDS OF LATERALS ARE TO BE PLUGGED ED T LEAKAGE. WITH
G BRACED PLASTIC DISC OR CAP CAPABLE OF
WITHSTANDING A LOW PRESSURE AIR TEST
BEDDING FOR FLEXIBLE PIPE SHALL BE NO. 8 CRUSHED STONE FROM 6- INCHES BELOW THE PIPE TO 12-
INCHES ABOVE THE PIPE. BEDDING FOR RIGID PIPE SHALL BE NO. 8 CRUSHED STONE FROM 6- INCHES
E
BELOW THE PIPE TO THE SPRING LINE OF AL THE
PIPE AND
THIS
TAN06'�NCHESEOF NOV 8 CRUSHED
FILL SAND OR EQUIVALENT. MANHOLES SHALL
BEDDING.
16. WATER AND SEWER LINE CROSSINGS AND SEPARATIONS SHALL BE IN ACCORDANCE WITH 327 1AC 3 -6 -9.
17. TRENCH SHALL BE OPENED SUFFICIENTLY AHEAD OF PIPE LAYING TO REVEAL OBSTRUCTION, AND SHALL BE
PROPERLY PROTECTED AND /OR BARRICADED WHEN LEFT UNATTENDED.
18. NO WATER SHALL BE PERMITTED TO FLOW INTO THE SANITARY SEWER SYSTEM DURING CONSTRUCTION.
CONTRACTOR SHALL UTILIZE A PUMP TO KEPITH BELOW THE
LAWS AND REGULATIONS H (327
BE DIRECTED TO A STORM OUTLET IN ACCORDANCE W
IAC 3- 6 -20). ANY PIPE ENTERING NL SUCH EXISTING ME SEWERS SHALL
ALL BE THE HAVE BEEN COMPLETED AND
MECHANICAL, BRACED PLUG
THE LINES HAVE PASSED ALL PUNCH LISTS.
19. ALL SEWER LATERALS INSTALLED BY THE hIAINLINE CONTRACTOR SHALL BE BEDDED THE SAME AS THE MAIN
LINE SEWER.
20. FORTY -EIGHT (48) HOURS NOTICE BE PRIOR DISTRICT TO PRIOR
THE
CO ALSO, 48 HOURS NOTICE
21. MANHOLE CASTINGS SHALL BE STAMPED SANITARY SEWER (NEENAH CASTING R 1642A OR
EQUAL) AND BE SELF- SEALING TYPE. THE BE NEENAH R-1916-F1 INCHES AND THE
AND STAMPED CLEAR OPENING
SHALL BE 24 INCHES. WATERPROOF
SEWER.
22. THE MINIMUM SLOPE FOR SEWER ACCEPTANCE BY THE CLAY TOWNSHIP REGIONAL WASTE DISTRICT ARE:
SIZE OF PIPE MINIMUM CONSTRUCTED SLOPE
8 -INCH 0.40%
10 -INCH 0.28%
12 -INCH 0.22%
15 -INCH 0.15%
18 -INCH 0.12%
23. THE CONTRACTOR SHALL PROVIDE MEASUREMENTS OF THE SLOPE OF THE SEWER FOR EACH MANHOLE
SECTION AS CONSTRUCTION PROGRESSES. SUCH MEASUREMENTS SHALL BE CERTIFIED BY A REGISTERED
LAND SURVEYOR OR ENGINEER AND BE AVAIL
SECTIONS TIONS ON-SITE
AN BE CONSTRUCTED IN A D ADVANCE OF SUCH
INSPECTOR. NO MORE THAN THREE MANHOLE
24. IN THE EVENT THE CONTRACTOR DOES NOT MEET THE MINIMUM SLOPES, THE SEWER SECTION AND ANY
OTHER AFFECTED SEWER SECTIONS SHALL BE RECONSTRUCTED TO MEET SUCH MINIMUM SLOPES.
25. LATERALS ARE TO BE TRACED WITH A OR HOME WILL MINIMUM OF 14
THEEWIRIEEFROMMTH THE WYE S THE
THE MINIJS.
THE CONTRACTOR FOR THE BUILDING O
BUILDING CLEANOUT ADJACENT TO THE BUILDING.
TYPICAL SANITARY LATERAL SPECIFICATIONS TO BE USED FOR PRIVATE SEWER
DEVELOPMENT WITHIN CLAY TOWNSHIP REGIONAL WASTE DISTRICT
1. ALL HOUSES, BUILDINGS, ETC., SHALL CONNECT TO THE DISTRICT'S SANITARY
SEWER SYSTEM WITHIN 90 DAYS OF NOTICE PROVIDING A SEWER IS WITHIN 300
FEET FOR HAMILTON COUNTY OR 100 FEET FOR BOONE COUNTY OF THE
PROPERTY LINE. ONLY ONE BUILDING MAY CONNECT TO THE SEWER MAIN PER
LATERAL UNLESS OTHERWISE APPROVED BY THE DISTRICT.
2. NO FOUNDATION OR OTHER STORM WATER DRAINS SHALL BE INTERCONNECTED
TO THE SEWER LATERAL INSTALLED AND CONNECTED TO THE DISTRICT'S
SANITARY SEWER.
3. THE EXISTING SEWER LINE FROM THE BUILDING TO THE SEPTIC TANK MAY ONLY
BE USED IF IT IS LOCATED UNDER A BUILDING ADDITION, PATIO, PORCH OR
PAVED DRIVEWAY. AIR TEST IS REQUIRED TO SHOW IF ACCEPTABLE FOR RE
USE. THE PROPERTY OWNER SHALL BEAR THE COST OF ALL TESTING. THE
DISTRICT INSPECTOR MUST BE ONSITE FOR THE DURATION OF THE AIR TEST.
4. THE OWNER OR CONTRACTOR SHALL NOTIFY THE DISTRICT PRIOR TO COVERING
THE INSTALLED LATERAL SO THAT THE DISTRICT CAN MAKE AN INSPECTION TO
DETERMINE COMPLIANCE WITH THE DISTRICT'S SEWER USE ORDINANCE. SUCH
NOTIFICATION SHALL BE MADE 24 HOURS PRIOR TO THE NEED FOR THE
INSPECTION. IF THE INSPECTION FAILS AND A SECOND INSPECTION IS REQUIRED,
OR CONTRACTOR IS NOT ON SITE FOR SCHEDULED INSPECTION, OR FAILS TO
CANCEL INSPECTION, AN ADDITIONAL FEE OF $75.00 WILL BE DUE. THIS MUST
BE PAID PRIOR TO THE TIME OF THE FOLLOW UP INSPECTION.
5. PROPERTY OWNERS ARE HEREBY ADVISED THAT THE COUNTY BOARD OF
HEALTH REGULATES THE OPERATION AND MAINTENANCE OF PRIVATE SEWAGE
DISPOSAL (SEPTIC) SYSTEMS. THE COUNTY ORDINANCE PROVIDES IN PART
THAT, UPON CONNECTION TO A PUBLIC SEWER, A SEPTIC TANK ?SHALL BE
ABANDONED AND FILLED WITH EARTHEN MATERIAL IN A SAFE AND SANITARY
MANNER." PLEASE CONTACT THE APPROPRIATE COUNTY BOARD OF HEALTH
FOR FURTHER INFORMATION.
6. ACCEPTABLE PIPE MATERIALS:
PVC PIPE: SDR 35, ASTM D -3034, SIX INCH PIPE
PVC PIPE: SDR 21, ASTM D-241, SIX INCH PIPE
GASKETS JOINTS ASTM D 3212
GASKETS ASTM F-477
FITTINGS SDR -28
DUCTILE IRON MECHANICAL COUPLING WITH PROPER FITTINGS.
CLEAN OUTS TO BE LOCATED THREE FEET WITHIN THE FOUNDATION AND NO
MORE THAN 300 FEET APART.
7. BEDDING:
USE FILL SAND OR NUMBER 8, 9 OR 11 STONE FILL MATERIAL IS TO BE
PLACED FROM 6 INCHES BELOW TO 6 INCHES ABOVE THE PIPE THE TRENCH
SHOULD BE A MINIMUM OF 18 INCHES WIDE
8. LATERALS SHALL BE INSTALLED NO CLOSER THAN 20 FEET FROM WATER
WELLS UNLESS PVC PRESSURE GRADE PIPE IS USED MEETING SDR 21 AND
ASTM D -2241. ANY PROPOSED INSTALLATION REQUIRING PRESSURE PIPE SHALL
BE REVIEWED AND ACCEPTED BY THE DISTRICT AND THE DISTRICT'S ENGINEER
PRIOR TO INSTALLATION.
9. WHERE A TRANSITION IS MADE BETWEEN SDR 35 PIPE AND PRESSURE GRADE
SDR 21 PIPE, A DUCTILE IRON GASKETED MECHANICAL COUPLING SHALL BE
USED.
10. LATERALS SHALL TERMINATE WITHIN 3 FEET OF THE BUILDING UNLESS THE
CONDITIONS IN ITEM #3 ABOVE ARE MET. NO GLUED PIPE SHALL BE INSTALLED
OUTSIDE OF BUILDING FOUNDATION WALLS.
11. ADDITIONAL INFORMATION ON DISTRICT STANDARDS AND SPECIFICATIONS MAY
BE OBTAINED FROM THE DISTRICT'S OFFICE DURING BUSINESS HOURS OF
8: OOA.M. TO 5: OOP.M. MONDAY THROUGH FRIDAY: ALL DISTRICT STANDARDS
CAN BE LOCATED ON OUR WEB SITE AT HTTP: /WWW.CTRWD.ORG
CLAY TOWNSHIP REGIONAL WASTE DISTRICT
10701 NORTH COLLEGE SUITE A.
INDIANAPOLIS, INDIANA 46280
PHONE: 844 -9200 FAX: 844 -9203
12. SEPTIC EFFLUENT SHALL NOT BE PUMPED OUT INTO THE SANITARY SEWER
SYSTEM.
13. THE DISTRICT SHALL INSPECT ALL LATERALS. PLEASE CALL THE DISTRICT
OFFICE AT 844.9200 24 HOURS PRIOR TO TIME OF INSPECTION
14. CONTRACTORS SHALL LAY 14 GAUGE- STRANDED WIRE THE ENTIRE LENGTH
OF THE LATERAL. WIRE IS TO BE PLACED ON TOP OF THE LATERAL. THE
DISTRICT INSPECTOR WILL VERIFY PLACEMENT OF THE WIRE. AFTER INSPECTION,
BEDDING IS TO BE PLACED ON TOP.
15. CALL BEFORE YOU DIG: IUPPS 1-800-382-5544, 48 HOURS PRIOR TO
DIGGING.
t'msIERAL NOTES
1. REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION INDOT) STANDARD
SPECIFICATIONS, 1999 EDITION, FOR BASIC MATERIALS AND CONSTRUCTION
METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT
OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF
THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE.
2. CONTRACTORS SHALL CHECK WITH ENGINEER PRIOR TO START OF CONSTRUCTION TO
VERIFY DATE OF PLANS. MINOR CHANGES MAY BE MADE IF ALL REVIEWING AGENCY
APPROVALS ARE NOT GRANTED BEFORE BIDDING. CHANGES IN COST SHALL BE
NEGOTIATED PRIOR TO PHYSICAL CONSTRUCTION AND BASED ON UNIT PRICES
SUBMITTED ON THE CONTRACT.
3. CONTRACTORS SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE ALL MAINS,
CONDUITS, SERVICE LINES, ETC. IN THE AFFECTED CONSTRUCTION AREA.
EXISTING UTILITY STRUCTURES ARE SHOWN HERE IN ACCORDANCE WITH AVAILABLE
INFORMATION. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES AND
FACILITIES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION
.(IN COOPERATION WITH APPLICABLE UTILITY), IS THE EXPRESS
RESPONSIBILITY OF THE CONTRACTOR IN THE PERFORMANCE OF THE CONTRACT
AND IN PREPARATION OF THE BID.
4. BACKFILL AROUND ALL STRUCTURES AND IN ALL TRENCHES BENEATH PAVED AREAS
SHALL BE COMPACTED GRANULAR MATERIAL IN ACCORDANCE WITH INDOT SECTION 211.
5. FILL MATERIAL SHALL CONSIST OF EARTH OBTAINED FROM CUT AREAS, BORROW
PITS OR OTHER APPROVED SOURCES. EARTH SHALL BE FREE FROM ORGANIC MATTER
AND OTHER DELETERIOUS SUBSTANCES AND LARGE ROCKS. THE FILL MATERIAL SHALL
BE PLACED IN LAYERS NOT TO EXCEED SIX INCHES FOLLOWING COMPACTION, PROPER
MOISTURE CONTENT OF FILL MATERIAL WILL BE SUCH TO ACHIEVE SPECIFIED
COMPACTION DENSITY. ALL FILL BENEATH PAVED AREAS, FLOOR SLABS AND FUTURE
BUILDINGS SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY
PER ASTM D -1557.
FIELD COMPACTION TEST SHALL BE RUN ON EACH LIFT, IN FILL SECTIONS, AND
THE REQUIRED COMPACTION ON EACH LIFT SHALL BE ATTAINED PRIOR TO PLACING
THE NEXT LIFT. COMPACTION TESTS SHALL BE IN ACCORDANCE WITH INDOT
SECTION 211.
CLEARING AND GRUBBING
1. CLEARING AND GRUBBING SHALL CONSIST OF CUTTING, REMOVING AND SATISFACTORY
DISPOSING OF ALL TREES, DOWNED TIMBER, BRUSH, PROJECTING ROOTS, STUMPS,
RUBBISH, BOULDERS, BROKEN CONCRETE, FENCING (AS DESIGNATED), AND OTHER
MATERIAL ON THE PROJECT SITE AND WITHIN THE BOUNDARY AS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND /OR AS DESIGNATED BY "CONSTRUCTION LIMITS
2. ALL "UNSUITABLE MATERIAL" FROM CLEARING OPERATIONS SHALL BE REMOVED TO
DISPOSAL AREA(S) OFF OF THE PROJECT SITE; UNLESS A "BURY PIT" SHALL BE
LOCATED WHERE IMPOUNDMENT OF SURFACE WATER MAY OCCUR.
3. MATERIALS SHALL NOT BE DISPOSED OF BY BURNING UNLESS APPROVED BY THE LOCAL
FIRE MARSHAL.
TREE REMOVAL AND PROTECTION
1. TREES SHALL BE REMOVED FROM THE PROJECT ONLY WHERE THE AREA IS TO BE
OCCUPIED BY ROAD AND SURFACED AREAS.
2. TREES SHALL BE REMOVED FROM THE PROJECT SITE AS DIRECTED BY THE DEVELOPER.
3. TREES SHALL BE REMOVED FROM THE PROJECT SITE WHERE THEY INTERFERE DIRECTLY
WITH THE PLACEMENT OF STORM OR SANITARY SEWERS, AND THAT SUCH EXCAVATION
IS OR WILL BE FATAL TO SUCH ADJACENT TREES.
4 THE CONTRACTOR SHALL ENDEAVOR TO SAVE AND PROTECT TREES OF VALUE AND
WORTH WHICH DO NOT IMPAIR CONSTRUCTION OF IMPROVEMENTS AS DESIGNATED.
IN THE EVENT CUT OR FILL EXCEEDS 0.5 FEET OVER THE ROOT AREA, THE
DEVELOPER SHALL BE CONSULTED WITH RESPECT TO PROTECTIVE MEASURES TO BE
TAKEN, IF ANY, TO PRESERVE SUCH TREES.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE METHOD FOR
PROTECTION OF TOPS, TRUNKS AND ROOTS OF EXISTING TREES ON THE PROJECT SITE
THAT ARE TO REMAIN. EXISTING TREES SUBJECT TO CONSTRUCTION DAMAGE SHALL
BE BOXED, FENCED OR OTHER MATERIAL AND EQUIPMENT SHALL NOT BE STOCKPILED
OR STORED WITHIN THE SPREAD OF BRANCHES. BRANCHES WHICH NEED TO BE
REMOVED OR ARE BROKEN SHALL BE NEATLY TRIMMED AND SCARS SHALL BE COVERED
WITH TREE PAINT.
STRIPPING OF TOPSOIL
THE CONTRACTOR SHALL VERIFY THAT ALL TOPSOIL HAS BEEN REMOVED IN THE AREAS
TO BE OCCUPIED BY ROAD, WALKS AND DESIGNATED BUILDING AREAS. TOPSOIL
SHALL BE REMOVED TO A DEPTH OF SIX (6) INCHES OR DEEPER, IF NECESSARY, TO
REMOVE ORGANIC MATTER WHERE REQUIRED.
2. TOPSOIL SHALL BE KEPT SEPARATED FROM SUITABLE FILL MATERIALS AND SHALL NOT
BE USED AS FILL UNDER PAVEMENT, BUILDING AREAS AND /OR FUTURE STRUCTURAL
AREAS.
3. TOPSOIL SHALL BE STORED AT A LOCATION WHERE IT DOES NOT INTERFERE WITH
CONSTRUCTION OPERATIONS. EXCESS TOPSOIL SHALL BE REMOVED FROM THE SITE.
4. TOPSOIL SHALL BE REASONABLY FREE FROM SUBSOIL DEBRIS AND STONES.
PAVEMENT CONSTRUCTION
1. THE INDIANA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, 1988,
SHALL APPLY TO WORKMANSHIP AND MATERIALS IN CONSTRUCTION OF SUBGRADE,
PAVEMENT, CURBS AND WALKS.
a. PREPARE THE SUBGRADE IN ACCORDANCE WITH INDOT SECTION 207. NO TRAFFIC
WILL BE PERMITTED ON THE PREPARED SUBGRADE PRIOR TO PAVING.
b. BITUMINOUS PAVEMENT IN ACCORDANCE WITH INDOT SECTION 401.
C. FINISHING EARTH GRADED SHOULDERS, DITCHES AND SLOPES IN ACCORDANCE
WITH INDOT SECTION 208.
DEMOLITION
1. THE CONTRACTOR SHALL EXCAVATE, DEMOLISH, REMOVE AND DISPOSE OF THE DEBRIS
FROM THE AREAS SHOWN ON THE SITE DEVELOPMENT PLAN.
a. BUILDING WALLS.
b. FOUNDATIONS.
c. PAVEMENT (CONCRETE, ASPHALT AND BRICK).
d. CONCRETE SLABS.
2. ALL MATERIAL AS A RESULT OF THE GENERAL DEMOLITION SHALL BE THE PROPERTY
OF THE CONTRACTOR. THE CONTRACTOR'S LUMP SUM BID PRICE FOR THE DEMOLITION
SHALL TAKE INTO ACCOUNT THE SALVAGEABLE VALUE OF MATERIALS AND SAID BID
PRICE SHALL REFLECT SAID SAVINGS.
3. THE CONTRACTOR SHALL BE REQUIRED TO DEMOLISH AND REMOVE DESIGNATED
FOUNDATION WALLS, RETAINING WALLS, CURBING, CONCRETE SLABS, PAVING, TANKS,
STRUCTURES, PIPES, MANHOLES AS SHOWN ON THE CONTRACT DOCUMENTS. ALL
EXISTING BASEMENT FLOOR SLABS THAT ARE NOT REMOVED SHALL BE BROKEN UP
SUFFICIENTLY TO PERMIT DRAINAGE THROUGH THE SLAB. ALL EXISTING BASEMENT
WALLS, FOUNDATIONS, FLOOR SLABS, AND ETC. SHALL BE REMOVED TO AN ELEVATION
SUCH THAT THEY WILL NOT SUPPORT PROPOSED FLOOR SLABS OR PAVEMENTS.
4. THE CONTRACTOR SHALL OBTAIN FROM THE CITY OF MADISON COUNTY, AND ALL OTHER
APPLICABLE GOVERNMENTAL AUTHORITIES, NECESS.ARY PERMITS REQUIRED, A COPY
OF SUCH PERMITS TO BE FURNISHED TO THE OWNER PRIOR TO COMMENCEMENT OF ANY
WORK REQUIRED HEREIN. THE CONTRACTOR SHALL FURTHER FURNISH TO THE OWNER
PROOF THAT HE HAS COMPLIED WITH THE PROVISIONS OF THE MUNICIPAL CODE OF
MADISON COUNTY, INDIANA.
UTILITIES
1. ALL WATER LINES FROM THE CARMEL WATER COMPANY MAIN TO ANY LOT SHALL BE
INSTALLED OF MATERIAL AND WORKMANSHIP AS APPROVED WITH THE CARMEL
WATER COMPANY.
2. CONDUIT SHALL BE REQUIRED FOR ALL ELECTRICAL AND TELEPHONE LINES UNDER
PAVED AREAS.
3. COMPACTED GRANULAR BACKFILL SHALL BE REQUIRED FOR ALL CROSSINGS OF PAVED
AREAS PER CITY OF CARMEL SPECIFICATIONS.
4. THE CONTRACTOR SHALL FURNISH THE METER PIT(s) OF THE TYPE AS SHOWN ON THE
CONTRACT PLANS AND SHALL INSTALL THE METER (WHICH SHALL BE FURNISHED BY
THE CARMEL WATER COMPANY) ALONG WITH ALL NECESSARY
QUICK DISCONNECTS, VALVES AND APPURTENANCES. THIS COST SHALL BE INCLUDED
IN THE BID AMOUNT FOR WATER LINES.
CONCRETE CURB AND WALKS
1.
SEE DETAIL SHEET FOR TYPE AND DETAILS.
2. CONCRETE SHALL BE READY MIXED PORTLAND CEMENT AND WATER. CONFORMING TO
A.S.T.M. C -150. AGGREGATES SHALL CONFORM TO A.S.T.M. C-33. COMPRESSIVE
STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 4000 P.S.I. WHERE REQUIRED,
REINFORCEMENT SHALL BE WELDED STEEL WIRE FABRIC CONFORMING TO A.S.T.M.
A -185.
3. ALL EXTERIOR CONCRETE SHALL CONTAIN 3% TO 6% AIR ENTRAINMENT.
4. APPLICATION
a. PLACE CONCRETE ONLY ON A MOIST, COMPACT SUBGRADE OR BASE FREE FROM
LOOSE MATERIAL. PLACE NO CONCRETE ON MUDDY OR FROZEN SUBGRADE IN
ACCORDANCE WITH INDOT SECTION 604 AND 605.
b. CONCRETE SHALL BE DEPOSITED SO AS TO REQUIRE AS LITTLE REHANDLING AS
PRACTICAL. WHEN CONCRETE IS TO BE PLACED AT AN ATMOSPHERIC
TEMPERATURE OF 35 DEGREES F OR LESS, PARAGRAPH 702.10 OF THE INDOT
SPECIFICATIONS SHALL APPLY.
c. EXCEPT AS OTHERWISE SPECIFIED, CURE ALL CONCRETE BY ONE OF THE METHODS
DESCRIBED IN INDOT SECTION 501.17.
5. TOP OF CASTING ELEVATIONS REFER TO THE CASTING'S RIM OR TOP OF CURB. THE
CURB CONTRACTOR SHALL INSURE THAT CURB INLET CASTINGS ARE SET A PROPER
ELEVATION PRIOR TO CONSTRUCTION OF ADJACENT CURB.
STORM SEWER SPECIFICATIONS
1. STANDARD SPECIFICATIONS OF THE FALL CREEK REGIONAL WASTE AND INDIANA DEPARTMENT
OF TRANSPORTATION SHALL APPLY FOR ALL WORK AND MATERIALS. PIPE SHALL BE
INSTALLED IN ACCORDANCE WITH INDOT SECTION 715.
2. ALL REINFORCED CONCRETE STORM SEWER PIPE (RCP) SHALL CONFORM TO ASTM
DESIGNATION C -76 CLASS 111. ALL HELICALLY CORRUGATED STEEL PIPE (HCSP)
SHALL CONFORM AASHTO M36, 16 GAUGE IN ACCORDANCE WITH INDOT SECTION 907.
3. BACKFILL AROUND ALL STRUCTURES AND CUTS UNDER PAVED AREAS WITH COMPACTED
GRANULAR MATERIAL IN ACCORDANCE WITH INDOT SECTION 21.1 AND 715.
4. SEE STANDARD DETAIL SHEET FOR CONSTRUCTION DIMENSIONS OF STORM STRUCTURES.
MANHOLE, INLETS AND CATCH BASINS SHALL BE IN ACCORDANCE WITH INDOT SECTION
720. PRECAST CONCRETE AND STEEL FOR MANHOLES AND INLETS SHALL BE IN
ACCORDANCE WITH ASTM C -478.
5. STORM SEWER DISCHARGE AREAS AND INVERTS ARE TENTATIVE AND ARE SUBJECT TO
FIELD MODIFICATIONS BY THE ENGINEER OR HIS REPRESENTATIVE. THE CONTRACTOR
WILL BE REIMBURSED FOR ANY ADDITIONAL LABOR AND MATERIALS NECESSARY TO
COMPLETE ANY MODIFICATIONS ACCORDING TO THE UNIT PRICES SUBMITTED BY THE
CONTRACTOR OR THE CONTRACT AMOUNT.
6. THE CONTRACTOR SHALL PROVIDE AT LEAST 2' OF COVER OVER ALL STORM SEWERS,
UNLESS OTHERWISE INDICATED BY PLANS.
7. RIPRAP SHALL BE A MINIMUM OF 1/3 CUBIC FOOT IN SIZE AND A MINIMUM 18" IN
DEPTH. DIMENSIONS FOR RIPRAP IN THESE PLANS ARE FOR ESTIMATING PURPOSES
ONLY. ACTUAL BEST PLACEMENT OF RIPRAP SHALL BE DETERMINED BY FIELD
CONDITIONS AND SHALL BE IN ACCORDANCE WITH INDOT SECTION 616.
8. ALL DRAINAGE PIPE AND DITCH OUTFALLS TO RECEIVING STREAMS SHALL BE
CONSTRUCTED IN ACCORDANCE WITh DRAWINGS, SUBJECT HOWEVER, TO ANY
MODIFICATION REQUIRED BY THE ENGINEER AT THE TIME INSTALLATION IS
COMPLETED AND TO ANY ADJUSTMENTS NEEDED FOR FIELD CONDITIONS NOT
ADEQUATELY ANTICIPATED BY THE DESIGN DRAWING.
9. CASTINGS SHALL BE AS SHOWN ON DETAIL SHEET FOR MANUFACTURER, TYPE AND
NUMBER. ALL CASTINGS SHALL BE NEENAH OR EAST JORDAN APPROVED EQUAL.
STORMTECH PRODUCT SPECIFICATIONS
1.0 GENERAL
1.1 STORMTECH CHAMBERS ARE DESIGNED TO CONTROL
STORMWATER RUNOFF. AS A SUBSURFACE RL I bNTION
SYSTEM, STORMTECH CHAMBERS 11.^TAIN AND ALLOW
EFFECTIVE INFILTRATION OF WATER INTO THE SOIL. AS
A SUBSURFACE DETENTION SYSTEM:, STORMTECH
CHAMBERS DETAIN AND ALLOW FOF: THE METERED
FLOW OF WATER TO AN OUTFALL.
2.0 CHAMBER PARAMETERS
2.1 THE CHAMBER SHALL BE INJECTION MOLDED OF
POLYPROPYLENE RESIN TO BE INHERENTLY RESISTANT
TO ENVIRONMENTAL STRESS CRACKING (ESCR), AND TO
MAINTAIN ADEQUATE STIFFNESS TI-ROUGH HIGHER
TEMPERATURES EXPERIENCED DURING INSTALLATION
AND SERVICE.
2.2 THE NOMINAL CHAMBER DIMENSIONS OF THE
STORMTECH SC -740 SHALL BE 30.0 INCHES TALL, 51.0
INCHES WIDE AND 90.7 INCHES LONG. THE NOMINAL
CHAMBER DIMENSIONS OF THE STORMTECH SC -310
SHALL BE 16.0 INCHES TALL, 34.0 INCHES WIDE AND 90.7
INCHES LONG. THE INSTALLED LENGTH OF A JOINED
CHAMBER SHALL BE 85.4 INCHES.
2.3 THE CHAMBER SHALL HAVE A CONTINUOUSLY CURVED
SECTION PROFILE.
2.4 THE CHAMBER SHALL BE OPEN BOTTOMED.
2.5 THE CHAMBER SHALL INCORPORATE AN OVERLAPPING
CORRUGATION JOINT SYSTEM TO ALLOW CHAMBER
ROWS OF ALMOST ANY LENGTH TO BE CREATED. THE
OVERLAPPING CORRUGATION JOINT SYSTEM SHALL BE
EFFECTIVE WHILE ALLOWING A CHAMBER TO BE
TRIMMED TO SHORTEN ITS OVERALL LENGTH.
2.6 THE NOMINAL STORAGE VOLUME OF A JOINED
STORMTECH SC-740 CHAMBER SHALL BE 74.9 CUBIC
FEET PER CHAMBER WHEN INSTALLED PER
STORMTECH'S TYPICAL DETAILS {INCLUDES THE
VOLUME OF CRUSHED ANGULAR STONE WITH AN
ASSUMED 40% POROSITY). THIS EQUATES TO 2.2 CUBIC
FEET OF STORAGE /SQUARE FOOT OF BED. THE
NOMINAL STORAGE VOLUME OF AN INSTALLED
STORMTECH SC -310 CHAMBER SHALL BE 31.0 CUBIC
FEET PER CHAMBER WHEN INSTALLED PER
STORMTECH'S TYPICAL DETAILS (INCLUDES THE
VOLUME OF CRUSHED ANGULAR STONE WITH AN
ASSUMED 40% POROSITY). THIS EQUATES TO 1.3 CUBIC
FEET OF STORAGE /SQUARE FOOT OF BED.
2.7 THE CHAMBER SHALL HAVE FORTY -EIGHT ORIFICES
PENETRATING THE SIDEWALLS TO ALLOW FOR LATERAL
CONVEYANCE OF WATER.
Summary of Requirements for Core Drilling Manholes
1. A current certificate of insurance k required to be on file prior to the work starting.
2. Before starting to dig check manhole for level. If questionable, plumb -bob manhole,
notify General Contractor C T RVVD.
3. The manhole shall be properly supported during the core drilling process.
4. No coring, cutting, or drilling is pemlitted within six inches (6 of a barrel joint. The
hole edge shall be a minimum of sot inches (6 from any joint.
5. Any holes cut in the field shall be smoothly and cleanly drilled with a core -drill or in a
manner acceptable to CTRWD. The hole shall be wiped clean. Boot shall meet
ASTM C -923 specifications. Bootto be for ASTM 3034 SDR -35 pipe.
6. Boot installation shall be flush top to bottom inside manhole. Inside Wedgeband shall
be tightened to seventy -five (75) foot- pounds (torque). Retorque after fifteen (15)
minutes.
7. Lube pipe with approved water dispersible tube at four (4) points very lightly
(90- 180 270 -360 degrees). Insert twisting and pushing pipe to proper depth.
Tighten the outside stainless steel clamp to sixty (60) foot-pounds torque.
8. For cored holes, penetrations andior other opening through a manhole or
other sanitary structure, a separation of greater than eighteen (18) inches between
the outer edge of resilient connectors is desired. If a separation of less than eighteen
(18) inches exists, then additional reinforcement will be required in the structure or
the structure diameter shall be enlarged to provide the required separation.
9. Cored holes, penetrations and /or other opening through a manhole or
other sanitary structure shall have a minimum separation of eight (8) inches from the
outer edge of resilient connectors.
2.8 THE CHAMBER SHALL HAVE TWO ORIFICES NEAR ITS
TOP TO ALLOW FOR EQUALIZATION OF AIR PRESSURE
BETWEEN ITS INTERIOR AND EXTERIOR.
2.9 THE CHAMBER SHALL HAVE BOTH OF ITS ENDS OPEN TO
ALLOW FOR UNIMPEDED HYDRAULIC FLOWS AND
VISUAL INSPECTIONS DOWN A ROW'S ENTIRE LENGTH.
2.10 THE CHAMBER SHALL HAVE 14 CORRUGATIONS.
2.11 THE CHAMBER SHALL HAVE A CIRCULAR, INDENTED,
FLAT SURFACE ON THE TOP OF THE CHAMBER FOR AN
OPTIONAL 4 -INCH INSPECTION PORT OR CLEAN -OUT.
2.12 THE CHAMBER SHALL BE ANALYZED AND DESIGNED
USING AASHTO METHODS FOR THERMOPLASTIC
CULVERTS CONTAINED IN THE LRFD BRIDGE DESIGN
SPECIFICATIONS, 2ND EDITION, INCLUDING INTERIM
SPECIFICATIONS THROUGH 2001. DESIGN LIVE LOAD
SHALL BE THE AASHTO HS20 TRUCK. DESIGN SHALL
CONSIDER EARTH AND LIVE LOADS AS APPROPRIATE
FOR THE MINIMUM TO MAXIMUM SPECIFIED DEPTH OF
FILL.
2.13 THE CHAMBER SHALL BE MANUFACTURED IN AN ISO
9001:2000 CERTIFIED FACILITY.
3.0 END CAP PARAMETERS
3.1 THE END CAP SHALL BE INJECTION MOLDED OF
POLYPROPYLENE RESIN TO BE INHERENTLY RESISTANT
TO ENVIRONMENTAL STRESS CRACKING, AND TO
MAINTAIN ADEQUATE STIFFNESS THROUGH HIGHER
TEMPERATURES EXPERIENCED DURING INSTALLATION
AND SERVICE.
3.2 THE END CAP SHALL BE DESIGNED TO FIT INTO ANY
CORRUGATION OF A CHAMBER, WHICH ALLOWS:
CAPPING A CHAMBER THAT HAS ITS LENGTH TRIMMED;
SEGMENTING ROWS INTO STORAGE BASINS OF
VARIOUS LENGTHS.
3.3 THE END CAP SHALL HAVE SAW GUIDES TO ALLOW EASY
CUTTING FOR VARIOUS DIAMETERS OF PIPE THAT MAY
BE USED TO INLET THE SYSTEM.
3.4 THE END CAP SHALL HAVE EXCESS STRUCTURAL
ADEQUACIES TO ALLOW CUTTING AN ORIFICE OF ANY
SIZE AT ANY INVERT ELEVATION.
3.5 THE PRIMARY FACE OF AN END CAP SHALL BE CURVED
OUTWARD TO RESIST HORIZONTAL LOADS GENERATED
NEAR THE EDGES OF BEDS.
3.6 THE END CAP SHALL BE MANUFACTURED IN AN ISO
9001:2000 CERTIFIED FACILITY.
DRAWING:
DATE:
PROJ. NO.:
DRAWN BY: