Loading...
HomeMy WebLinkAbout04100001 SP - Cherry Creek Estates, Section 5, Site Plan, pg 07THIS SHEET TO BE USED FOR EROSION CONTROL ONLY. PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL: NAME: TIM WALTER COMPANY: PLATINUM PROPERTIES PHONE: (317) -818 -2900 The following is a list in sequence of construction activities to control soil erosion: 1. The contractor shall schedule a Pre construction meeting with the Hamilton County Soil and Water Conservation District prior to any construction on the site being started. 2. The construction entrance installed. 3. Silt fencing for entire project installed as noted 4. Maintenance and Refueling area constructed 5. Concrete waF :gout area constructed 6. Posting information area shall be constructed. All items, as outlined in the in the O &M manual for Post Constuction water quality measures shall be placed in this area. 7. Grade the site (sides of swales, mounds and ponds to be seeded and mulched immediately upon completion). Temporary seeding shall be recommended for all swales and disturbed areas that cannot be final seeded within a time period that will prevent slope erosion. For temporary seeding, the contractor shall utilize a fast growing seed of either oats, annual ryegrass, wheat or rye depending on time of year. Disturbed areas should be kept to a minimum at all times. All disturbed areas shall be seeded if left dormant for more than 15 days 8. Storm inlets are to be protected immediately after installation. 9. Contractor shall control mud accumulation on all streets surrounding project by installing stone surface at all locations where construction traffic leaves the site. Dust shall be kept to a minimum by utilizing sprinkling, Calcium Chloride, Vegetative cover, spray on adhesives or other approved methods. 10. Maintain all filters and traps during construction to prevent any blockages from accumulated sediment. Additional seeding and straw bales may be required during construction as specified by Engineer or Soil Conservation Service. Payment for additional straw bales shall be at the contractor's expense. Payment for additional rip —rap (not shown on plans) and seeding shall be paid for on a unit basis. 11. Contractor shall install all sanitary sewers, storm sewers, subsurface drains, and water mains. Straw bale filters shall be installed at all storm inlets (including street inlets). NOTE: EARTHWORK CONTRACTOR SHALL INSTALL A MINIMUM OF A 20'x300' STONE ACCESS DRIVE PRIOR TO CONSTRUCTION. SF SILT FENCE PECOS DRIVE DIVERSION DITCH Denotes permanent seeding mulch areas Seeding rate: 130# /acre or 3# /1000 S.F. Seeding mixture: 25% creeping red fescue 35% perennial rye 40% Kentucky bluegrass Denotes seeding w /fiber blanket #S150 by North American Green Seeding rate: 110# /acre or 2.5# /1000 S.F. Seeding mixture: 38% Kentucky 31 fescue 19% perennial rye 19% annual rye 14% orchard grass 10% Kentucky bluegrass 07 Denotes temporary seeding Sc mulching. Seeding rate: 50# /acre Seeding mixture: 100% perennial rye. SCALE: 1" 50' co z 0 IV 0 M J 6 II 0 O) N O) 0 v) m W 0 U) w cn EL z z SHEET NO. C300 JOB NO. 43405S5