Loading...
HomeMy WebLinkAbout04100001 SP - Cherry Creek Estates, Section 5, Site Plan, pg 13BEGIN CONSTRUCTIO STA. 0 +00.00 0 0 x 0 780 770 l 1 0 50' R/W 30' V) N) lf") O N 0 +00 0 o� 2 0 0 0 0 o 0 w 0 MGR. CHG. AO +15.86 FcR DETAIL SEE SH 04 N 0 0 B -B W t r 0 0 1 .64% EX. 24" R.C.P. INV.= 757.63 760 O w Z Q U N Qom' DATUM ELEIXh C7 750.00 iS se co 0 +50 L.P. 0 +40.86 252 0 m 266 GR CHG. 0 +90.86 J]NIERSEC110N STA 1 +i5.12 ST /k. 0 +00.00 E 265 INT OF CURVATURE 3 +81.28 Col F OT F Sy T� 2 \sxs `o CURVE DAT A 89 °33'29" R= 150.00' L= 234.46' 48.85' 1:NliERSEC110N STA. 0+00.00 O O N 1+00 1+50 IROQUOIS LANE 253 8" WATERMAIN O O N 267 264 2 +00 254 6 +00 6+50 07+0 PADDLE DRIVE 251 10 P 1I STA 1 +75. PVi ELEV 762. A.D. 0.72 K 55.77 1 +50 w z Q 10 O_ 0 O m 40 VC 00 N CO N 0 10 z w 0 U Lu CC U UJ W Z 0 Q CY C� 0 CO CD O POI T OF TANGENCY STA U W D1 5 U w 2 +00 6+15.75 10 O N O 250 -0.60% O 10 O 2 +50 7 +50 O N (0 3 +00 255 14' INV 249 =754.9 CO O O N K 33.64 40' VC O O 3 +50 GR. CHG. 8 +15.75 LOW POINT E_EV 761.96 LOW DOINT STA 3 -51.22 PVI STA 3 +51.17 PVI ELEV 761.90 A.D. 1.19 N ro (n U 00 O O 256 8 +50 4 +00 248 0.59% rt EX. 10" S.D INV.= 753.91 O N 9 +0 0 8" WATE MAIN co 3 4 +50 TA LEV .D. C 20. 70' V N O N 0 R. P'.V.C. (n D' 257 POINT OF CURVATURE STA. 10+36.66 Z 11 10 tri O 247 O O N 5 +00 10 +00 03 O Ln O 5 +50 258 GR. CHG. 10 +36.68 246 CURVE A= 89°44 R =150.0 L =234.9 T =149.3 SCALE: 1"=50' HOR. 1"=5 VERT. 00 O O O N 6+00 Z Q L� 0 I- N z O co W h STING GRADE-N 6 +50 12" R.C.P. INV.= 763.94 245 7 +00 PECOS DRVF/PAD9LF DRIVE 7 +50 NOTE: FINAL BACKFILL FOR WATER MAINS, WATER SERVICE LATERALS, SANITARY MAINS AND SANITARY SERVICE LATERALS UNDER AND WITHIN 5 -FEET OF PAVEMENT SHALL BE B- BORROW FOR STRUCTURE BACKFILL MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED IN 6 -INCH MAXIMUM LIFTS TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED. THE BACKFILL FOR THE TOP 6- INCHES OF THE EXCAVATION BELOW THE START OF THE AGGREGATE SUBBASE OF THE PAVEMENT SHALL BE NO. 53 STONE MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED TO NOT LESS THAN 95 STANDARD PROCTOR DENSITY. IF THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT FINAL BACKFILL REQUIREMENT, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. NOTE: BEDDING, HAUNCHING, AND INITIAL BACKFILL MATERIALS, PLACEMENT AND COMPACTION FOR WATERMAINS, WATER SERVICE LATERALS, SANITARY MAINS AND SANITARY SERVICE LATERALS SHALL BE IN ACCORDANCE WITH THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION. NOTE: FOR INSTALLATION OF STORM MAINS, WATER MAINS, SANITARY MAINS, WATER SERVICE LATERALS, SANITARY SERVICE LATERALS UNDER CITY STREETS, REGARDLESSOF THE JURISDICTION OF THE UTILITY, THE MINIMUM COVER FROM THE TOP OF THE INSTALLED PAVEMENT TO THE TOP OF THE INSTALLED PIPE SHALL BE THE PAVEMENT SECTION THICKNESS (ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE THE SUBGRADE) PLUS 1' -0 IF THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT COVER REQUIREMENT, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. 10 N 00 O PROPOSED GR PVI STA 8 +15.75 PVI ELEV 775.70 A.D. -2.51 K 23.88 8 +00 60' VC 8 +50 PVI STA 9 +25 PVI ELEV 777.32 A.D. -0.88 K 45.31 9 +00 15" R.C.P. INV.= 772.42 Q 10 W w U) O 1- 10 40' VC rn U w N N 9 +50 N O N N 10 +00 00 O CO O w CC Z 0! U Z Q Li_ O w Z 0 OCC W 0 00 10+50 N N N 00 11 +00 N 10 DD N N N O 00 N 11+50 N 00 N 0) m 12 +00 O N N LLJ N O I\ 12 +50 O� N 13+00 SCALE: 0 W J LL. 0 Ct c:t3 Z I-- W W m 6 U {j 1- N 0 H U II JOB NO. 4340555 1- 0 SHEET NO. m CC a w 1- Q 0 0 o N 0) Q Z Q 0 z 10 CC W L (I) W (1) W Y Z W p W� CL U (I) Ct Ct U W W S U z z C400